ML19281A123
| ML19281A123 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 01/03/1979 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Borgmann E CINCINNATI GAS & ELECTRIC CO. |
| Shared Package | |
| ML19281A124 | List: |
| References | |
| NUDOCS 7903060584 | |
| Download: ML19281A123 (2) | |
See also: IR 05000358/1978027
Text
~
Y0FB
2
[ *%
UNIT F D STATf'
[4
'
NUCl E AH RfGUIATOPY COMMISLlON
4
, ,
i
'
su u o..
.
- , (
- -
, c. . n m a , , , ,
e4
.
c. u ..t.
,a.
.
....*
JAN 0 3197:
.
,
Docket 50. 50-358
Cincinnati Gas and Electric
Company
ATTN-
Mr. Earl A.
Borgmann
Vice President
Engineering Services
and Electric Production
139 Er.st 4th Street
Cincinnati, OH
45201
Gentlemen:
This refers to the inspection conducted by Mr. I. T. Yin of
this office on November 16-17, 1978, of activities at the
k'm . H.
Zimmer Power Station authorized by NRC Construction
Permit No. CFPR-88 and to the discussion of our findings with
Mr. B.
E. Culver and others of your staff at the conclusion
of the inspection.
This also refers to the investigation and
inspection conducted by Mr. I. T. Yin on November 21, 1978, at
Sargent and Lundy Engineers office in Chicago, relative to the
document control provisions for pipe stress reports.
The enclosed copy of our inspection report identifies areas
examined during the inspection, k'ithin these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
During this inspection, certain of your activities appeared
to be in noncompliance with NRC requirements, as described
in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations.
Section 2.201 requires you
to submit to this office within thirty days of your receipt
of this notice a written statement or explanation 1.n reply,
including for each item of noncompliance: (1) corr 5ctive
action taken and the results achieved;.(2) corrective action
to be taken to avoid further noncompliance; and (3) the date
when full compliance will be achieved.
79030605f4
'.
-
Cincinnati Gas and
- 2-
JAt 6
'
Electric Company
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
,-
Part 2, Title 10, Code of .2deral Regulations, a copy of this
letter, *he enclosures, and your response to this letter will be
,
-
placed in the NRC's Public Document Room, except as follows.
If
the enclosures contain information that you or your contractors
believe to be proprietary, you must apply in writing to this office,
within twenty days of your receipt of this letter, to withhold such
information from public disclosure.
The application must include
a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that prcprietary
information identified in the application is contained in an
enclosure to the application.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
~)..!2yyA:~ w
R. F. Heishman ,' Chief
.
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-358/78-27
cc w/encls:
Mr. J.
R. Schott, Plant
Superintendent
Central Files
Reproduction Unit NRC 20
Local PDR
g/ TIC
U. Young Park, Power Siting
.
_
,
Commission
-
.