Forwards IE Insp Rept 50-358/78-27 on 781116-17 & 1121 & Notice of Violation
ML19281A123
Person / Time
Site: Zimmer
Issue date: 01/03/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML19281A124 List:
References
NUDOCS 7903060584
Download: ML19281A123 (2)


See also: IR 05000358/1978027

Text

~

Y0FB

2

[ *%

UNIT F D STATf'

[4

'

NUCl E AH RfGUIATOPY COMMISLlON

4

, ,

i

'

su u o..

.

, (
-

, c. . n m a , , , ,

e4

.

c. u ..t.

,a.

.

....*

JAN 0 3197:

.

,

Docket 50. 50-358

Cincinnati Gas and Electric

Company

ATTN-

Mr. Earl A.

Borgmann

Vice President

Engineering Services

and Electric Production

139 Er.st 4th Street

Cincinnati, OH

45201

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of

this office on November 16-17, 1978, of activities at the

k'm . H.

Zimmer Power Station authorized by NRC Construction

Permit No. CFPR-88 and to the discussion of our findings with

Mr. B.

E. Culver and others of your staff at the conclusion

of the inspection.

This also refers to the investigation and

inspection conducted by Mr. I. T. Yin on November 21, 1978, at

Sargent and Lundy Engineers office in Chicago, relative to the

document control provisions for pipe stress reports.

The enclosed copy of our inspection report identifies areas

examined during the inspection, k'ithin these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you

to submit to this office within thirty days of your receipt

of this notice a written statement or explanation 1.n reply,

including for each item of noncompliance: (1) corr 5ctive

action taken and the results achieved;.(2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

79030605f4

'.

-

Cincinnati Gas and

- 2-

JAt 6

'

Electric Company

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

,-

Part 2, Title 10, Code of .2deral Regulations, a copy of this

letter, *he enclosures, and your response to this letter will be

,

-

placed in the NRC's Public Document Room, except as follows.

If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this office,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure.

The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that prcprietary

information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

~)..!2yyA:~ w

R. F. Heishman ,' Chief

.

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-358/78-27

cc w/encls:

Mr. J.

R. Schott, Plant

Superintendent

Central Files

Reproduction Unit NRC 20

PDR

Local PDR

NSIC

g/ TIC

U. Young Park, Power Siting

.

_

,

Commission

-

.