Forwards Category I Inservice Insp Submittals,Presented as Draft Proposed Mods to Tech Spec Surveillance Requirements. Application to Amend OL Will Be Submitted
ML19260E295
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/08/1980
From: Justin Fuller
PUBLIC SERVICE CO. OF COLORADO
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML19260E296 List:
References
P-800-14, NUDOCS 8002150404
Download: ML19260E295 (2)


Text

,

pubne service company oe ocacade FeLruary 8,1980 Fort St. Vrain Unit No. 1 P-80014 Mr. Steven A. Varga Acting Assistant Director for Light Water Reactors Division of Project Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket:

  1. 50-267

Subject:

Fort St. Vrain Inservice Inspection and Testing -

PCRV Auxiliary System

References:

1) PSC Letter, J.K. Fuller to S. A. Varga, P-79289, Dated November 30, 1979 Gentlemen:

Enclosed, for your review, is the first of a series of Category I inservice inspection submittals, which presents in draft form proposed modifications to Fort St. Vrain (FSV) Technical Specification Surveillance Requirements. This submittal, pertaining to the PCRV Auxiliary System, was developed as part of the ongoing Inservice Inspection and Testing Review Program that was outlined by PSC in Reference 1.

Further Category I inservice inspection submittals for Systems 11, 21 and 22 will be made as detailed requirements are developed.

Enclosure (1) contains the proposed revisions of the FSV Technical Specification Surveillance Requirements for the following sections:

SR 5.1.2 - Reserve Shutdown System Surveillance SR 5.2.1 - PCRV Overpressure Safety System Surveillance SR 5.2.15-PCRV Penetration Interspace Pressure Surveillance SR 5.2.16-PCRV Closure Leakage Surveillance The revised portions are identified by vertical lines on the right hand side of the pages.

Enclosure (2) contains the detailed basis for the additional or modified surveillance requirements which resulted from PSC's review of the current surveillance requirements for the PCRV auxiliary systems and for the reserve shutdown system. The systematic approach used to develop these requirements is explained further in the first pages of the review.

1960 259 so oei no " W/

i o

Mr. Steven A. Varga February 8,1980 Page 2 Enclosure (3) contains the basic criteria being used to develop the detailed inservice inspection and testing requirements.

The criteria has been extensively reviewed with the NRC, and certain of the criteria has been revised to reflect past NRC comments.

It is anticipated that the Enclosure (3) criteria will require further revision as the detailed requirements for each FSV system are developed and the need for further guidelines becomes apparent.

The PCRV Auxiliary System, for your reference, is depicted on P&I 11-1 thru 11-5 and includes PCRV safety valve piping, PCRV penetration piping (pressurizing, purging, venting, relieving), and reserve shutdown hopper pressurizing piping.

An application to amend the facility operating license will be submitted when the proposed Technical Specification changes have been finalized following your review.

Should you have questions regarding the proposed changes, please contact Mark A. Joseph, (303) 571-6671.

Very truly yours, J.K. Fuller, Vice President Engineering and Planning JKF/MAJ:pa Enclosures 1960 200