ML19242B706
| ML19242B706 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/01/1979 |
| From: | Dolan J INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19242B707 | List: |
| References | |
| AEP:NRC:00097, AEP:NRC:97, NUDOCS 7908090311 | |
| Download: ML19242B706 (3) | |
Text
wt lNDIANA & MICHIGAN POWER COMPANY P. o. BO X 18 Bo WLING G R E EN ST ATioN NEW Y o R K, N. Y.10004 June 1,1979 AEP:NRC:00097 Donald ;. Cook Nuclear Plant Unit No. 2 Docket No. 50-316 Licente Nos. DPR-74 Mr. James G. Keppler, Director U.S. Nuclear Regulatory Cornission Recion III
- 79) Roosevelt Road Gien Ellyn, Illinois 60137
References:
(1) NRC IE BULLETIN NOS. 78-12,78-12A, 78-12B ATYPICAL WELD MATERIAL IN REACTOR PRESSURE VESSELS (2)
" CHICAGO BRIDGE & IRON COMPANY REPORT IN COMPLI-ANCE WITH THE NRC SULLETINS 78-12 AND 78-12A", DATED APRIL 24,1979
Dear Mr. Keppler:
This letter and its attachments are in response to the above referenced I.E. Bulletins as they apply to Unit No. 2 of the D.C.
Cock Nuclear Plant.
Chicago Bridge & Iron (C3&I), manufacturer of the reactor vessel for Unit 2, has submitted to the NRC, on April 24, 1979, a generic report (reference 2) providing the required weld material information on all reactor vessels fabricated by CB&I. Westinghouse and American Electric Power have reviewed the above referenced report and concluded that it represents adequately the data for the welcment material used in the reactor vessel of Unit No. 2 of the Donald C. Cook Nuclear Plant. Weld-ment material that might be used for verification purposes, is available in the archives of the Westinghouse Electric Corporation.
COI273 7908000 l
59b_
ba2
-n
Mr. James G. Keppler, Dfrector AEP:NRC:00097 As stated in 0.- letter No. AEP:NRC:00097B dated May 21, 1979, the above information for Occald C. Cook Uni
- No i reactor vessel will be submitted by July 2, 1979 Very truly yours k.
JED:em chn E. Dolan
. ice President Attachments:
- 1) CB&I review certification letter to the NRC dated 4/24/79
- 2) CB&I letter to the NRC dated 4/24/79
- 3) Westinghouse letter to AEP dated 5/23/79 cc:
R. C. Callen G. Charncff D, V. Shaller-Bridgman R. W. Jurgensen O.
Cev) r co3 Jl
JIraCHNE G l Chicago Bridge & tren Cornpany
!= :-:
- -: ' ' -:r :
- n. :
- : r:
..:5 c.r.,u u:
-.:: 3 r: a
- - :m
- c. m - :-
2 The documentation end infermetien required by NRC Bu!!etins 78-12 cnd 78-12A, cnd Westinghouse PO //546-MVC 30lC45-MN for CBI Centreet #
68-3262 Vessel D. C. Cook !!
cre contcined in the atteched repert.
Welding consumcbles were re-reviewed cgeinst the originc! req;irements in cecordence with the cbeve listed docume.,ts. No devictions were found.
Ebed vpen our records, I certify, to the best of my knowledge, this report is correct.
2kMf i
Ralph E. Kelley Octe Meneger, CC A Services e-6, e
a, 9
n.,
\\3*
C c,r,,
J'a
..