ML19240A069
| ML19240A069 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/16/2019 |
| From: | Yox M Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of New Reactors |
| Shared Package | |
| ML19240A068 | List: |
| References | |
| ND-19-0753 | |
| Download: ML19240A069 (5) | |
Text
Southern Nuclear Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tel August 16, 2019 Docket Nos.: 52-025 52-026 ND-19-0753 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant - Units 3 and 4 Emergency Preparedness Communications Assessment Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident dated March 12. 2012
References:
- 1.
NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident" dated March 12, 2012, (Agencywide Documents Access and Management System (ADAMS) Accession Number 12053A340)
- 2.
Southern Nuclear Operating Company letter to NRC, "60-Day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident" dated May 9, 2012 (Letter ND-12-0987),
(ADAMS Accession Number ML12131A540)
- 3.
Southern Nuclear Operating Company letter to NRC, "Supplement to 60-Day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident" dated June 28, 2012 (Letter ND-12-1364), (ADAMS Accession Number ML121850029)
- 4.
NRC Letter, "Vogtle Electric Generating Plant Units 3 and 4 - Review of 60-Day Response to a Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant Accident" dated July 31, 2012, (ADAMS Accession Number ML12201B409)
- 5.
NRC Letter, "Follow-up Letter on Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3,"
dated January 23, 2013, (ADAMS Accession Number ML13010A162)
U.S. Nuclear Regulatory Commission ND-19-0753 Page 2 of 5 Ladles and Gentlemen:
The U.S. Nuclear Regulatory Commission (NRC) requested Information from nuclear power plant licensees regarding the Identification of enhancements that could provide a means to power equipment needed to communicate onslte and off-site during an extended loss of all alternating current (AC) power event. An assessment of communications systems capabilities Is necessary to respond to specific Information contained In NRC letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of insight from the Fukushima Dai-ichi Accident, dated March 12, 2012 (Reference 1). Enclosure 5 of the NRC letter requested that nuclear power plant licensees assess current communications systems and equipment used during an emergency event given a set of standard assumptions. The letter also requested licensees to consider enhancements that may be appropriate for the emergency plan with respect to communications requirements of 10 CFR 50.47, Appendix E to 10 CFR Part 50, and the guidance In NUREG-0696, "Functionai Criteria for Emergency Response Facilities," \\n light of the set of the standard assumptions discussed In the letter. Licensees were asked to consider the means necessary to power the new and existing communications equipment during a multi-unit event, with a loss of all AC power.
By letter dated May 9, 2012 (Reference 2) and supplemented by letter dated June 28, 2012 (Reference 3), Southern Nuclear Operating Company (SNC) submitted Its 60-day response for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 proposing an alternative course of action based upon the units currently being under construction. The alternative course of action Included revised due dates to provide the requested Information and the basis for those dates.
By letter dated July 31, 2012 (Reference 4), the NRC concluded that the licensee provided an adequate basis for Its proposed alternative to responding to the 50.54(f) request for Information regarding communications and staffing for Near-Term Task Force (NTTF) Recommendation 9.3.
The enclosure to this letter provides the results of the communications assessment for VEGP Units 3 and 4 In response to the 50.54(f) request for Information regarding communications.
Please note that this response Is based on the current design and Installation planned for Vogtle Units 3 and 4. The estimated completion dates and Implementation milestones supersede those contained In previous SNC letter dated May 9, 2012 (Reference 2) and are subject to change as construction schedules evolve.
On January 23, 2013, the NRC Issued a letter (Reference 5) to all power reactor licensees and holders of construction permits In active or deferred status. The enclosure to that letter Identified eight generic technical Issues needing resolution to determine a licensee's communications capability regarding a station black-out (SBC) event. Section 5 of the enclosure to this letter addresses each of these eight generic Issues.
This letter contains no regulatory commitments. Should you have questions regarding this submlttal, please contact Mr. Steven Leighty at (706) 848-6790.
U.S. Nuclear Regulatory Commission ND-19-0753 Page 3 of 5 I declare under penalty of perjury that the foregoing Is true and correct. Executed on this 16"^ day of August 2019.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY idr Aljy Michael J. Vox Regulatory Affairs Director Vogtle 3 & 4 MJY/DWM/sfr
Enclosure:
Vogtle Electric Generating Plant (VEGP) Units 3 and 4 -
Emergency Preparedness Communications Assessment
U.S. Nuclear Regulatory Commission ND-19-0753 Page 4 of 5 cc:
Southern Nuclear Ooeratina Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosures)
Mr. P. P. Sena III (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. D. H. Jones (w/o enclosures)
Mr. G. Chick Mr. D. L. McKinney (w/o enclosures)
Mr. T. W. Yelverton (w/o enclosures)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. M. Ronnlund Mr. D. L. Fulton Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Ms. S. Agee Ms. A. Gibson Ms. A. C. Chamberlain Mr. S. Leighty Mr. E. Riffle Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)
Ms. J. Dixon-Herrity Mr. C. Patel Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. C. J. Even Mr. A. Lerch Mr. S. Walker Mr. N.D. Karlovich Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Ms. K. P. Carrington Mr. P.J. Heher Mr. M. Webb
U.S. Nuclear Regulatory Commission ND-19-0753 Page 5 of 5 State of Georoia Mr. R. Dunn Oalethorpe Power Corporation Mr. M. W.
Price Ms. A. Whaiey Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinohouse Electric Company. LLC Mr. L. Oriani (w/o enclosures)
Mr. T. Rubenstein (w/o enclosures)
Mr. M. Corletti Mr. M. L. Clyde Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light