ML19225D119

From kanterella
Jump to navigation Jump to search

Amend 20 to License DPR-72,changing Required Sodium Hydroxide Concentration in Reactor Bldg Spray Chemical Additive Tank & Increasing Required Shutdown Margin
ML19225D119
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/03/1979
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19225D120 List:
References
TAC-08377, TAC-8377, NUDOCS 7908070365
Download: ML19225D119 (2)


Text

f pa cas 8

e4 UNtTED ST ATES e

Ntit'l l,\\lt HL tlUL AitutY CtM1 MIS 5f t)N j

WASHING TON. D. C. 20555

,s FLORIDA POWER CORP 0 PATIO?!

~

CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURT CITY OF NEW SMYRNA BEACH AND UTILITIES C0fNISSION, CITY OF NE'.4 SMYRXA BEACH CITY OF OCALA ORLAND0 UTILITI S COMMISSION AND CITY OF ORLANDO SEBRAG UTILITIES COMMISSION SEMIN0LE ELECTRIC C00FERATIVE, If'C.

CITY OF TALLAHASSEE DOCKET NO. 50-332 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING FLANT l

AMEhD'1ENT TO FACILITY OPEP.ATU'3 LICENSE Arendment No. 20 License No. OPR-72 1.

The Nuclear Regulatcry Comission (the Comission) has found that:

l A.

The applications for amendment by Florida Power Corporation, et al (the i

licensees) dated May 25 and July 3, 1979, comply with the standards and I

requirements of the Atomic Energy Act of 1954, as amended (the Act)I;and the Commission's rules and regulations set forth in 10 CFR Chapter B.

The facility will o;:erate in confornity with the application, the provisions of the Act, and the rules and regulations of the Cormiission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endar.gering the health and safety of the puolic, and (ii) that such activities will be conducted in cc:r.pliance with the Conmission's regulations; D.

The issuance of this ar.endment will not be inimical to the ccmon defense and security or to the health and safety of the public; and E.

Ins issuance of this amendment is in accorcance with 10 CFR Pa :

51 cf the Ccmission's regulations and all applicable require. Tents have been satisfied.

091 7,ogoy o 5 g

--iUUUULUff

, Accordingly, Facility Operating License No. OPR-72 is hereby amended 2.

by changes to the Technical Specifications as indicated in the attach-ment to this license amendment and as follows:

Rdvise paragraph 2.C.(2) in its entirety to read:

A.

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment tio. 20

, are hereby incorporated in the license.

Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.

B.

Delete paragraph 2.C.(4) in its entirety.

This license amendment is effective as of the date of its 3.

issuance.

FOR THE NUCLEAR REGULATORY C0!VilSS10t1 g

e

.. g bert W. Reid, Chief Operating Reactors Branch 4 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance: July 3, 1979 427 092

.