February. 7, 1~7~1
- r~i"'.'1 ~ r.:.:J Mr. Jan:ies P. O'Reiliy, Direct'or
~
. _2_'.1:)lV~:r::~J1l_J1.l4 l PIJ1-ciQ
.... erial Noe..)~t'$-i'1':filtfl/
. Office of Ir.. spection an<l
- Enfor.cefilent -
U. S~ Nuclear Regulatory Conllllis*s:i.011.*.
Region II - Suite 818 PO&li/DLB: das - *
- Docket. Nos. -280'
- 230 Peachtree*Street, Northwest 50_;28L Licenee Noe. D?R-32 DPR'."."37
- Atlanta, Georg~.
- 30303
- Desr: Mr~ O'Ref~ly:_. ';.
'!'his ia -in response to your
- let-ter. of November
- 11,.197_7, 1n:,ref eren~e* to the inspection *condhcted at Surry PO"s11er St:e.tiqn_ on Octob.er.'Lr-7*~*: *19_77 anci *report..;.
- E!d in IE Inspection *Report Nos. ';)0-2S0/77:_29 and 50-281/77-29 ~-. ThiE1:.is a *supple-..
ment to our previous_resp'cinsea of-December'_6~ *t977 and r;c;cembcr:21, 1977; _arid
._addresses_ Appeodix A, page_2*; item E*.of_your.letter of 1.fovemb~r.'.'11;**1977_,.. **_*.
- In. order to insure that*. the_ Liquid Wast*e Monitor* is. perf orm.1:ag. is*: specified ii:!.* Tecb.nicr.J. Specification 3. 7 :E au<l.'I'able :3.)-5 *l.:he :followi,ng p~ogrwn wili be.
- ~
conductecl.
(1) tn order** to 'insure: that. the'.l:Lquid. wa_ste monitor..- will. alarm *and<.
. shut the discharge valve 138 required~. a test*.willbe done usin~{."
liquid.weste 5Wllples with :i.5!otope, &!!tivities near :the*. ill.arm* *set-.
- point: aa
- detem:iued. by the _roul ti_.channel analy~~r.-
'The;~ test-_ will be eonducte:d :during -the week_ of,February 6~1973._*_
~- *,...
- (2)
- In. or.der ~~- eval~iat.e*,_~ve~~il -pei;'fo:rniance of the i:tqciid was-~e monii :..
tor, *.& correla:i:i<m,&tudy will be. conducted betwe'en monitor teadings,
.
- and :liquid _waste !Ullll.pleli of known* isotope *activities.* : In :order to obtaiu-liquia waste &~plea £ram* worst case c.ond1tions,. the study*,
- will... include s~ple& from-liquid_.wsste d,~e 'to. tp.e }L-'\\rc.h UnH 1:lo*. 2
- __ shutdo~~/. :J'h:ts*. st~dy. >~~pu;d -be -COl:ll)lef;eq_'hy 'Apr:,q: ~s, J9?~-.. -_
cc:
- t.
- Mr. ** Robert* W *. Reid /...
Ve:iy _ truly
- your*~,-
~. )n,:~.Jlft(u~j:..:?.
C. lL, ~ tall:h1gs
- Vice President.:.. ~ewer.Supply
. autl-Production Operations
~\\,*
\\
- 7*~!.041 I.)\\ *. ~ - _J.
I
-~.-- ------
~~ --
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 11 230 PEACHTREE STREET, N.W. SUITE 818 ATLANTA, GEORGIA 30303 In Reply Refer To:
RII :SCE 50-280/77-29 50-281/77-29 FF;*_:
r: *** 1978 Virginia Electric and Power Company ATTN:
Mr. W. L. Proffitt Senior Vice President, Power P. 0. Box 26666 Richmond, Virginia 23261 Gentlemen:
Thank you for your letter of February 7, 1978, informing us of steps you have taken to correct the items of noncompliance concerning activities under NRC Operating License Nos. DPR-32 and DPR-37 brought to your attention in our letter of November 11, 1977.
We will examine your corrective actions and plans during subsequent inspections.
We appreciate your cooperation with us.
cc:
Mr. T. L. Baucom Surry Power Station P. 0. Box 315 Surry, Virginia 23883 Sincerely,
... -;, "-/
- -? --;-/)
(
~/ *v-* x__/~i2J(g__,_,_<'.1.;.
~J. T. Sutherland, Chief Fuel Facility and Materials Safety Branch
, (.
J" I
-~-
VIRGINIA Et.ECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 February 7, 1978 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Connnission Region II - Suite 818 Serial No. 519B/111177 PO&M/DLB:das Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 230 Peachtree Street, Northwest Atlanta, Georgia 30303
Dear :
t-fr. 0 'Reilly:
This is in response to your letter of November 11, 1977, in reference to the inspection conducted at Surry Power Station on October 4-7, ed in IE Inspection Report Nos. 50-280/77-29 and 50-281/77-29.
ment to our previous responses of December 6, 1977 and December addresses Appendix A, page 2, item E of your letter of November 1977 and report-This is a supple-21, 1977, and 11, 1977.
In order to insure that the Liquid Waste honitor is performing as specified Technical Specification 3.7.E and Table 3.7-5 the following program will be ducted.
(1)
In order to insure that the liquid waste monitor will alarm and shut the discharge valve as required, a test will be done using liquid waste samples with isotope activities near the alarm set-point as determined by the multi-channel analyzer.
The test will be conducted during the week of February 6, 1978.
(2)
In order to evaluate overall performance of the liquid waste moni-tor, a correlation study will be conducted between monitor readings, and liquid waste samples of known isotope activities.
In order to obtain liquid waste samples from worst case conditions, the study will include samples from liquid waste due to the March Unit No. 2 shutdown.
This study should be completed by April 15, 1978.
Very truly yours,
...--'.,_)/_, (,:,,_ *--
)
C.H. Stallings Vice President - Power Supply and Production Operations cc:
Mr. Robert W. Reid