ML18362A097

From kanterella
Jump to navigation Jump to search
Hearing File Update
ML18362A097
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/28/2018
From: Jeremy Wachutka
NRC/OGC
To: Sekazi Mtingwa, Ronald Spritzer, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-443-LA-2, ASLBP 17-953-02-LA-BD01, RAS 54725
Download: ML18362A097 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 December 28, 2018 Administrative Judge Administrative Judge Ronald M. Spritzer, Chair Dr. Sekazi Mtingwa Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of NEXTERA ENERGY SEABROOK, LLC (Seabrook Station, Unit 1)

Docket No. 50-443-LA-2; ASLBP No. 17-953-LA-BD01

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Boards (Board) November 29, 2017 Initial Scheduling Order, the staff of the U.S. Nuclear Regulatory Commission (Staff) herein notifies the Board and the parties that the hearing file has been supplemented for this proceeding. On or about January 10, 2019, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) and through the Electronic Hearing Docket (EHD). The EHD may be accessed at the following URL: http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Seabrook Docket No. 50-443-LA-2 in the Staff Discovery Materials folder of the EHD. An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1.

Pursuant to 10 C.F.R. § 2.336(c), attached is the affidavit of Justin C. Poole, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of December 17, 2018.

The Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In

R. Spritzer December 28, 2018 N. Trikouros S. Mtingwa identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.

Additionally, the Staff is notifying the Board and the parties that the Staff anticipates publishing the final Safety Evaluation (SE) in January 2019. In prior notifications to the Board, the Staff indicated that it anticipated publishing the final SE in December 2018. The Staff will provide an update should the projected publishing date change.

Sincerely,

/Signed (electronically) by/

Jeremy Wachutka Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 287-9188 E-mail: Jeremy.Wachutka@nrc.gov

Enclosures:

Attachment 1 - Hearing File Index Affidavit of Justin C. Poole cc: Service List

Attachment 1 - Seabrook LA 2 Hearing File Index Update 12 - December 28, 2018 ID# Accession Document Title Number Date NRC-00332 ML18332A429 11/28/18 Letter from Commission Secretary Annette Vietti-Cook to Christopher Nord.

Seabrook Station Unit 1 - License Renewal Application: Review of Licensee Program NRC-00333 ML18348A951 12/14/18 Addressing Alkali-Silica Reaction.

December 19, 2018 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LA-2

)

(Seabrook Station, Unit 1) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I currently serve as a project manager for Seabrook Station, Unit 1. Among other things, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the license amendment request at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 (b)-(c) and 2.1203 and the Boards November 29, 2017 Initial Scheduling Order in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of December 17, 2018.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d)

Justin C. Poole Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301) 415-2048 Email: Justin.Poole@nrc.gov Executed in Rockville, Maryland this 19th day of December 2018

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LA-2

)

(Seabrook Station, Unit 1) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Seabrook Station License Amendment 2 Hearing File, including: Attachment 1 - Seabrook License Amendment 2 Hearing File Index -

Update 12 and Affidavit of Justin C. Poole, dated December 19, 2018, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 28th day of December, 2018.

/Signed (electronically) by/

Jeremy Wachutka Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 287-9188 E-mail: Jeremy.Wachutka@nrc.gov