Text
From:
RON MONTEFORTE To:
Allen, William
Subject:
[External_Sender] RE: Re: OP-100 Drawing Question Date:
Tuesday, December 11, 2018 3:53:43 PM
- Chris, It does. The line item for Section 1.3, General Arrangement Drawings; Drawing OP100-1A Rev. 3 and 4 should say Drawing IR50-1A, Rev 3, Drawing IR50-1A, Rev 4, addeddust cap and shipping plug part numbers.
- Thanks, Ron On December 11, 2018 at 12:19 PM "Allen, William" <William.Allen@nrc.gov>
wrote:
That information helps. Please confirm that the Summary of Changes attached to this e-mail contains a typographical error. Thanks.
From: RON MONTEFORTE [1]
Sent: Tuesday, December 11, 2018 3:06 PM To: Allen, William <William.Allen@nrc.gov>
Subject:
[External_Sender] Re: OP-100 Drawing Question
Hi Chris,
The dust cap and shipping plug part numbers were clarified on drawing IR50-1A, Rev 5, Items 8 and 18. The IR50 isn't a Type B container, just an OP100 payload, so the drawings are included in the OP100 SAR. There is no OP100-1A drawing.
Please let me know if this helps.
- Thanks, Ron On December 11, 2018 at 11:22 AM "Allen, William"
<William.Allen@nrc.gov> wrote:
When you submitted your application for the OP-100 back in 2017, a change was identified to the general arrangement drawings. The change indicated that dust cap and shipping plug part numbers were added to drawing OP100-1A. This change caused the drawing revision number to increase from three to four.
I cant find a drawing OP100-1A listed in either Rev. 6 of the OP-100 SAR or the OP-100 CoC. Can you clarify?
Im working to finalize the concurrence package to issue the OP-100 CoC amendment, but I need an answer to this question before I can get the package into concurrence.
Thanks, Chris