ML18227D144
| ML18227D144 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/04/1976 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| L-76-86 | |
| Download: ML18227D144 (4) | |
Text
NlcC FonM 195 U,S. NUCLEAR RFGULATORYCO'ION NRC DISTRIBUTION Fon PART 50 DOC ICET MATERIAL
-FROM: Pf,QRIDA PAL?R 6 LIGffg CO.
HIAHI)
E Ul'IRIG OOCKET NUMB Sc)- QSo o7~j FILE NUMBER DATE OF DOCUMENT OATS RECEIVEO cg LETTER ORIGINAL COPY OESCRIPTION ONOTORIZEO glUNC LASS I F I E 0 INPUT FORM ENcLosv RE NUMBER OF COPIES RECEIVEO i S'iyn~a LTR RE 'I'IIEIR 4-30-75 LTR.......FURN INFO CONCf;RNING (gALITY ASSURANCE JK PROGRAH.....
<<~)( 4 i.-"-
p)mx ~m: gag<<Ca~i'oini SAFETY FOR ACTION/INFORMATION ENVXRO ASSIGNED AD '.
BRANCH CffIEF:
PROJECT kfANAGER; LXC ~
SST.:
Ave.is A ASSIGNED AD:
BRANCH CHIEF
~
PROJECT ffANAGER :
LIC~
ASST'EG FILE NRC PDR I & E Qj D WSJZM INTERNALDISTRIBUTION SC BENAROYA ERNST ALLARD SPANGLER GOSSICK Sc.STAFF SE PROJECT HANAGEHENT BOYD P,
COLLXNS EfOUSTON PETERSON HELTZ EfEI.TEHES SKOVHOLT LPDR' Ml rXC N~SC ASLB GES
~gx~~z~.r E)lG~)NEE
))
KNIGHT SIEfWXL PAW ICKI REACTOR SAFETY ROSS NOVAK ROSZTOCZY CjfECK SALTZHAN
'UTBERG EXTERNAL DISTRIBUTION NATL 1MB
- REG, V-XE LA PDR CONSULTANTS XPPOLITO OPERATXNG REACTORS STELLO OPERATING TECH EISENHUT SffAO BAER SCHIPENCER GRIHES SITE SAFETY 6 ENVXR ANALYSIS DENTON 6 fmLLER BROOKffAVEN NATL LAB ULRXKSON(ORNL)
SITE TECH GA&ilLL I
STEPP HULtfAN SITE ANALYSXS VOLAIER J ~ COLLINS KREGER COb ROL NUMBER
P. O. 3OX OI3I00, A'IIXIII,FLORIDA 33IOI b$
FLORIDA POWER 5 LIGHT COMPANY March 4, 1976 L-76-86 Director of Nuclear Reactor Regulation ATTN:
Mr. George Lear, Chief Operating Reactors Branch g3 Division of Operating Reactors U. S. Nuclear Regulatory CoIILmission Washington, D.
C.
20555
~>O 0 - wS., ~+-4~<
Dear Mr. Lear:
The purpose of this letter is to provide the status of the~
commitments made in our letter to you dated April 30, 1975.
The following is a summary of the milestones es ablished in the above letter:
1.
By June 28,
- 1975, submit to the NRC a Topical Quality Assurance Report that is responsive to the guidance provided in NASH-1283, WASH-1284, and WASH-1309; 2.
By January 1,
1976 (Day 0), complete a matrix identifying differences between the corporate Quality Procedures which represent the implementation of the QA Program described by the Topical QA Report and the PTP Administrative Procedures; 3.
Assuming the NRC has reviewed and approved the Topical QA Report by January 1,
1976 (Day 0),
we will have impl mented an Operational QA Program for PTP Units 3 and 4 by April 29, 1976 (Day 120).
To date, items 1 and 2 above have been accomplished.
The commit-ment in item 3 was based on the assumption tnat NRC approval of the PPL Topical QA Report (TPLTQAR) would be received by January 1,
1976 (Day 0).
At the presen time, the Topical QA Repo t.
(FPLTQAR) has not been approved by the QA Branch of the Division of Project Management-
- However, FpL is cont'nuincI the activities recIuired to HELPING BUILD FLORIDA
Mr. George Lear March 4, 1976 implement an operational QA Program for PTP and will have the program implemented 120 days 'following NRC approval of the FPL Topical QA. Report per our previous commitment.
Very truly yours, Robert E. Uhrig Vice President