WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.1-i APPENDIX H.1 INTRODUCTION AND GENERAL DESCRIPTION OF INSTALLATION CANISTERIZED GTCC WASTE Table of Contents H.1 INTRODUCTION AND GENERAL DESCRIPTION OF INSTALLATION.......................................................................................................... H.1-1 Introduction....................................................................................................... H.1-1 H.1.1 Principal Functions of the Installation.............................................. H.1-1 H.1.1.1 General Description of the Installation........................................................... H.1-2 H.1.2 GTCC Waste Canisters..................................................................... H.1-2 H.1.2.1 General System Description............................................................................. H.1-3 H.1.3 Storage Systems................................................................................ H.1-3 H.1.3.1 Transfer System................................................................................ H.1-3 H.1.3.2 Identification of Agents and Contractors....................................................... H.1-4 H.1.4 Material Incorporated by Reference............................................................... H.1-5 H.1.5 References.......................................................................................................... H.1-6 H.1.6

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.1-1 H.1 INTRODUCTION AND GENERAL DESCRIPTION OF INSTALLATION Introduction H.1.1 Consistent with Chapter 1 of this SAR, the WCS CISF is intended to provide dry storage capacity for commercial spent nuclear fuel (SNF) and Greater-than-Class C (GTCC) waste contained in a dual-purpose (transportation/storage) cask and canister.

This Appendix describes GTCC waste storage at the WCS CISF in both NUHOMS and VCC storage overpacks. An overview of the CISF and the Storage Overpacks is provided in Chapter 1 of this SAR.

This Appendix demonstrates compliance with the requirements of the site-specific license provisions of 10 CFR 72.6 and follows the guidance in ISG-17 [H.1-1]

regarding the GTCC waste storage program at the WCS CISF. Specifically, the GTCC waste storage program described here ensures that (1) adequate protective measures are in place to confirm safe storage within the WCS CISF, (2) the co-location of GTCC waste does not have an adverse effect on the safe storage of SNF and the safe operation of the WCS CISF, and (3) the storage of GTCC waste will not have an adverse effect on public health and safety, and the environment.

The GTCC wastes, as stored at the WCS CISF, are (1) only reactor-related, (2) in solid form, and (3) stored in a separate container (i.e., GTCC waste is not stored in a cask that also contains SNF).

GTCC waste containers contain solid reactor-related waste only, consisting of activated reactor vessel internals and other in-core instrumentation. A description and characterization of the GTCC waste is provided in Appendix H.7 and Section H.3.1.1.

There is no liquid or process GTCC waste stored at the WCS CISF.

The external characteristics of the GTCC canister are similar, if not identical, to those of the SNF canisters and the GTCC canisters are to be stored in the same storage overpacks as the SNF canisters. To the extent possible, the same procedures and individuals with the same training and qualifications as those used in SNF transfer operations are used. The organization, programs, and protective measures in place to ensure safe storage of the SNF remain in place to ensure continued safe storage of the canisterized SNF and the canisterized GTCC waste.

Storage of canisterized GTCC waste at the WCS CISF has no adverse effect on the safe storage of the SNF and safe operation of the WCS CISF. The storage of the canisterized GTCC waste has no adverse effect on public health and safety or the environment.

Principal Functions of the Installation H.1.1.1 In addition to the storage of canisterized SNF assemblies, the WCS CISF design provides temporary dry storage for canisterized GTCC waste. The WCS CISF is designed for dry transfer operations.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.1-2 General Description of the Installation H.1.2 A general description of the installation is provided in Section 1.2 of this SAR.

GTCC Waste Canisters H.1.2.1 The GTCC waste canisters are high integrity stainless steel, welded vessels that provide confinement of radioactive materials, encapsulates the waste in an inert atmosphere, and provides biological shielding (in the axial directions) during canister transfer and storage. It provides full canisterization for the GTCC waste during transfer and storage in the storage overpacks. The GTCC waste canisters are stored within the WCS CISF boundaries. The design requirements and design descriptions for the authorized canisters are provided in Appendices H.3 and H.4.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.1-3 General System Description H.1.3 Storage Systems H.1.3.1 The Storage Systems authorized for storage at the WCS CISF are described in Sections 1.2.4.1 and 1.3 and are listed in Table 1-1 of this SAR.

Transfer System H.1.3.2 The Transfer Systems authorized for use at the WCS CISF are described in Section 1.3.1 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.1-4 Identification of Agents and Contractors H.1.4 See Section 1.5 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.1-5 Material Incorporated by Reference H.1.5 See Section 1.6 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.1-6 References H.1.6 Spent Fuel Project Office Interim Staff Guidance-17 Interim Storage of Greater Than H.1-1 Class C Waste.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.2-i APPENDIX H.2 SITE CHARACTERISTICS CANISTERIZED GTCC WASTE Table of Contents H.2 SITE CHARACTERISTICS........................................................................................ H.2-1

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.2-1 H.2 SITE CHARACTERISTICS See Chapter 2 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-i APPENDIX H.3 PRINCIPAL DESIGN CRITERIA CANISTERIZED GTCC WASTE Table of Contents H.3 PRINCIPAL DESIGN CRITERIA............................................................................. H.3-1 Purpose of Installation...................................................................................... H.3-2 H.3.1 Material to be Stored......................................................................... H.3-2 H.3.1.1 General Operating Functions............................................................ H.3-2 H.3.1.2 Structural and Mechanical Safety Criteria.................................................... H.3-3 H.3.2 Seismic Design.................................................................................. H.3-3 H.3.2.1 Load Combination Criteria............................................................... H.3-3 H.3.2.2 Safety Protection System.................................................................................. H.3-4 H.3.3 General.............................................................................................. H.3-4 H.3.3.1 Protection by Equipment and Instrumentation Selection.................. H.3-4 H.3.3.2 Nuclear Criticality Safety................................................................. H.3-4 H.3.3.3 Radiological Protection..................................................................... H.3-4 H.3.3.4 Fire and Explosion Protection........................................................... H.3-4 H.3.3.5 Materials Handling and Storage........................................................ H.3-5 H.3.3.6 Industrial and Chemical Safety......................................................... H.3-5 H.3.3.7 Decommissioning Considerations.................................................................... H.3-6 H.3.4 Summary of WCS CISF Design Criteria........................................................ H.3-7 H.3.5 References.......................................................................................................... H.3-8 H.3.6

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-1 H.3 PRINCIPAL DESIGN CRITERIA This section describes the principal design criteria, which are unique to the canisterized GTCC waste storage program at the WCS CISF. The design criteria for the WCS CISF are presented in Chapter 3 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-2 Purpose of Installation H.3.1 In addition to the SNF storage, the WCS CISF is designed to provide interim storage for canisterized GTCC waste.

The transfer and storage of canisterized GTCC waste and general operating functions at the WCS CISF are similar to those described in Chapters 1 - 15 and system specific Appendices (A-G) for SNF. The existing structures containing the SNF assemblies are neither altered nor disturbed during the transfer and storage of canisterized GTCC waste.

Material to be Stored H.3.1.1 Canisterized GTCC waste is non-fuel related material generated as a result of plant operation and decommissioning where the radionuclide concentration limits for Class C waste in 10 CFR 61.55 are exceeded. This waste may include such components as incore components, core support structures, and small reactor related miscellaneous parts resulting from the reactor vessel internals segmentation/decommissioning processes. All waste stored within the GTCC canister are activated metals, incore instrument tips, and associated surface contamination.

The total amount of canisterized GTCC waste to be stored at the WCS CISF is up to 231.3 MT (510,000 pounds).

The physical, thermal and radiological characteristics of GTCC canisters are described in the Rancho Seco FSAR, Appendix C [H.3-1], for the GTCC waste proposed for storage at the WCS CISF for storage in a NUHOMS System. The GTCC waste stored in NAC systems is described in the applicable transportation cask SAR and Certificate of Compliance (CoC) listed by docket number in Table 1-1. GTCC waste for NAC systems could be received from Maine Yankee (GTCC-Canister-MY),

Connecticut Yankee (GTCC-Canister-CY), Yankee Rowe (GTCC-Canister-YR), and Zion (GTCC-Canister-ZN). For GTCC-Canister-MY, the GTCC waste is described in the NAC-UMS transportation cask SAR, Section 1.3.1.1.2 [H.3-2]. For GTCC-Canister-CY and GTCC-Canister-YR, the GTCC waste is described in the NAC-STC transportation cask SAR, Section 1.2.3.2 [H.3-3]. For GTCC-Canister-ZN, the GTCC waste is described in the NAC-MAGNATRAN SAR, Section 1.3.2 [H.3-4].

General Operating Functions H.3.1.2 The operating functions related to the GTCC waste canisters are similar to those addressed in Chapter 5 and the referenced Operating Procedures in the referenced Appendices for the applicable cask systems listed in Table 5-1.

Each aspect of radiation protection, containment, and heat rejection is accomplished through passive means.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-3 Structural and Mechanical Safety Criteria H.3.2 The GTCC waste canisters are components that are classified as important-to-safety along with the other components described in Section 3.4 and Table 3-5 and the reference appendices for the applicable cask systems listed in Table 3-1 of this SAR.

Seismic Design H.3.2.1 The GTCC waste canisters are analyzed for seismic loading equal to those ground accelerations described in Section 3.2.3 and are determined acceptable. Resulting stresses in the GTCC shell assembly are bounded by the SNF canister stress results because the total GTCC waste canisters loaded weights are bounded by that analyzed for the SNF canisters.

Load Combination Criteria H.3.2.2 H.3.2.2.1 Storage Overpacks The design approach, design criteria and loading combinations for the storage overpacks are addressed in the referenced Appendices for the applicable cask system listed in Table 3-1.

H.3.2.2.2 GTCC Waste Canisters Table 1-1 includes the authorized GTCC canisters which are designed to withstand the effects of the site characteristics and environmental conditions associated with normal operation, maintenance, and testing of the WCS CISF and to withstand postulated off-normal and accident conditions. Environmental conditions are provided in Table 1-2.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-4 Safety Protection System H.3.3 General H.3.3.1 The WCS CISF is designed for safe containment during GTCC waste storage. The components, structures, and equipment, which are designed to assure that this safety objective is met, are summarized in Section 3.4 and the referenced Appendices for the applicable cask system listed in Table 3-1. In addition, the GTCC waste canister is designated as a component important to safety. The key elements of the WCS CISF and its operation that require special design consideration are:

1. The closure seal welds on the GTCC waste canister shells to form a confinement boundary to maintain a helium atmosphere.
2. Minimizing personnel radiation exposure during GTCC waste canister transfer and storage operations.
3. Design of the casks and GTCC waste canisters for postulated accidents.
4. Design of the storage overpacks with passive ventilation system for effective decay heat removal to ensure the integrity of the GTCC waste canister.

Protection by Equipment and Instrumentation Selection H.3.3.2 H.3.3.2.1 Equipment Handling operations of GTCC waste canisters are the same as for the SNF canisters.

H.3.3.2.2 Instrumentation No instrumentation is required for the storage of GTCC waste canisters.

Nuclear Criticality Safety H.3.3.3 Nuclear criticality is not applicable to the design of GTCC waste canisters.

Radiological Protection H.3.3.4 The WCS CISF is designed to maintain on-site and offsite doses ALARA during transfer operations and long term storage conditions. The storage of GTCC waste canisters does not alter nor impact the access control, shielding, or radiological alarm systems described in balance of this SAR.

Fire and Explosion Protection H.3.3.5 Fire and explosion protection is addressed in Section 3.3.6 of this SAR. Storage of GTCC waste does not affect the outcome of this analysis.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-5 Materials Handling and Storage H.3.3.6 H.3.3.6.1 GTCC Waste Handling and Storage The handling of GTCC waste canisters within the WCS CISF is addressed in Chapter 5 and the referenced Operating Procedures in the referenced Appendices for the applicable cask system listed in Table 5-1.

H.3.3.6.2 Radioactive Waste Treatment The WCS CISF does not generate radioactive waste. Any secondary waste generated during transportation cask receipt and decontamination operations in the Cask Handling Building (CHB) are handled as described in Section 6.1.4.

H.3.3.6.3 Waste Storage Facilities Waste storage facilities are neither required nor provided for at the WCS CISF.

Industrial and Chemical Safety H.3.3.7 No hazardous chemicals or chemical reactions are involved in the operation of the WCS CISF. Industrial safety relating to handling of the cask and waste canister are addressed by procedures, which meet Occupational Safety and Health Administration (OSHA) requirements.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-6 Decommissioning Considerations H.3.4 WCS CISF decommissioning considerations are addressed in Section 13.6.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-7 Summary of WCS CISF Design Criteria H.3.5 The GTCC waste canisters are designed as Important-to-Safety components. For design requirements specific to the Storage Systems containing SNF, see the reference appendices for the applicable cask systems listed in Table 3-1 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.3-8 References H.3.6 Rancho Seco Independent Spent Fuel Storage Installation Safety Analysis Report, H.3-1 NRC Docket No. 72-11, Revision 4.

NAC International, Safety Analysis Report for the UMS Universal Transport Cask, H.3-2 Revision 2, CoC 9270 Revision 4, USNRC Docket Number 71-9270.

NAC International, NAC-STC, NAC Storage Transport Cask Safety Analysis H.3-3 Report, Revision 17, CoC 9235 Revision 13, USNRC Docket Number 71-9235.

NAC International, Safety Analysis Report for the MAGNATRAN Transport Cask, H.3-4 Revisions 12A, 14A, 15A, and 16A, USNRC Docket Number 71-9356.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-i APPENDIX H.4 INSTALLATION DESIGN CANISTERIZED GTCC WASTE Table of Contents H.4 INSTALLATION DESIGN.......................................................................................... H.4-1 Summary Description....................................................................................... H.4-1 H.4.1 Storage Systems................................................................................................. H.4-2 H.4.2 H.4.2.1 Design Basis and Safety Assurance..................................................... H.4-2 H.4.2.2 Compliance with General Design Criteria........................................... H.4-2 H.4.2.3 Structural Specifications...................................................................... H.4-4 H.4.2.4 Individual Unit Description................................................................. H.4-4 Decontamination System.................................................................................. H.4-5 H.4.3 H.4.3.1 Equipment Decontamination............................................................... H.4-5 H.4.3.2 Personnel Decontamination................................................................. H.4-5 Repair and Maintenance.................................................................................. H.4-6 H.4.4 H.4.4.1 Repair................................................................................................... H.4-6 H.4.4.2 Maintenance......................................................................................... H.4-6 Cathodic Protection.......................................................................................... H.4-7 H.4.5 Waste Handling Operation Systems................................................................ H.4-8 H.4.6 References.......................................................................................................... H.4-9 H.4.7 Supplemental Data Drawings........................................................................ H.4-10 H.4.8

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-1 H.4 INSTALLATION DESIGN Summary Description H.4.1 The layout and principal features of the WCS CISF are described in Section 4.1 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-2 Storage Systems H.4.2 The WCS CISF uses the Storage Overpacks for storage of SNF canisters as well as GTCC waste canisters. All canisters (SNF and GTCC) for a given system identified in Table 1-1 have the same exterior dimensions, are functionally identical, and designed to be accepted by the applicable identified transportation cask, transfer cask and Storage Overpack.

Design Basis and Safety Assurance H.4.2.1 The intent of the WCS CISF is to provide safe containment during dry storage of SNF and GTCC waste. Consistent with 10 CFR 72.3, the only components at the WCS CISF important-to-safety are those identified in Table 3-4 and Table 3-5. The Storage Overpacks and canisters are self-contained, independent, passive systems and do not rely on any other systems or components for their operation. The other components identified as important-to-safety in Table 3-4 and Table 3-5 such as the Canister Transfer System, Transfer Casks, GTCC waste canisters, and SNF canisters rely on other systems during receipt and transfer operations; but in storage, the GTCC waste canisters and SNF canisters are self-contained, independent, and passive.

The following sections discuss the conformance of the WCS CISF with applicable 10 CFR Part 72 design criteria.

Compliance with General Design Criteria H.4.2.2 H.4.2.2.1 10 CFR 72.122 Overall Requirements

1. Qality standards Quality assurance requirements are addressed in Section 1.4.4.3.
2. Protection against environmental conditions and natural phenomena Extreme environmental conditions for the WCS CISF are defined in Table 1-2 and Chapter 12. The design criteria in Section 3.2 require that the storage systems be designed to withstand the design earthquake, high ambient temperature and humidity, and extreme winds.
3. Protection against fire and explosion The design criteria require that the storage system be designed so that it can continue to perform its safety functions effectively under credible fire and explosion exposure conditions. As addressed in Section 3.3.6, no large fire or explosion within the WCS CISF is considered credible.
4. Sharing of structures, systems, and components Section 4.1.2 states that the storage system and other WCS CISF support systems are not shared with any other facilities except the counting laboratories as addressed in Section 9.5.2, and WCS CISF activities do not impair any activities at the other Waste Control Specialists facilities adjacent to the WCS CISF.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-3

5. Proximity of sites The design and operation of the WCS CISF results in minimal risk to the health and safety of the public.
6. Testing and maintenance of systems and components The design criteria require that the Storage Overpacks be designed to permit inspection, maintenance, and testing. Although the canisterized GTCC storage system requires minimum maintenance, the design of the WCS CISF allows for appropriate testing, inspection, and maintenance, if required.
7. Emergency capability Scenarios requiring emergency actions are neither considered credible, nor postulated to occur. Nevertheless, the Waste Control Specialists Consolidated Emergency Response Plan is in effect to meet the requirements in 10 CFR 72.32.
8. Confinement barriers and systems The design of the storage systems ensures that GTCC waste remains contained within its canister, is protected from degradation during storage and that the waste is maintained in a safe condition.
9. Instrumentation and control systems No control systems are needed for the storage systems to perform their safety functions. The parameters that affect the long-term safe storage of SNF are structural integrity of confinement, shielding, and passive cooling (heat rejection). Technical Specifications are in place to ensure adequate thermal performance of the Storage Overpacks.
10. Control room or control areas The WCS CISF is a passive installation, with no need for operator actions. No control room is needed for normal WCS CISF operations.
11. Utility services There are no utility or emergency systems required to perform safety functions at the WCS CISF. Section 4.3 addresses auxiliary system requirements.
12. Retrievability The design features of the GTCC canisters affecting retrievability are functionally identical to those used for the SNF canisters. By using a design similar to that of SNF canisters, the stored waste could be transferred directly to a DOE facility after DOE acceptance of the waste. The steps involved in retrieving the canisterized GTCC waste for offsite shipment are provided in Chapter 5 and the referenced Operating Procedures in the referenced Appendices for the applicable cask system listed in Table 5-1.

H.4.2.2.2 10 CFR 72.124 Criteria for Nuclear Criticality Safety Criticality control is not applicable to the storage of canisterized GTCC waste.

H.4.2.2.3 10 CFR 72.126 Criteria for Radiological Protection Criteria for radiological protection do not differ from the transfer and storage of canisterized SNF described in this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-4 H.4.2.2.4 10 CFR 72.128 Criteria for Spent Fuel, High-level Radioactive Waste, Reactor-Related Greater than Class C Waste and other Radioactive Waste Handling and Storage Criteria for waste transfer and storage do not differ from transfer and storage of canisterized SNF described in this SAR.

H.4.2.2.5 10 CFR 72.130 Criteria for Decommissioning Operation of the WCS CISF does not result in contamination on the outside surface of the GTCC canisters or any other WCS CISF components above administrative limits.

Decommissioning considerations for the WCS CISF are addressed in Section 13.6 of this SAR.

Structural Specifications H.4.2.3 Safe storage of canisterized GTCC waste depends only on the capability of the storage system to fulfill its design functions. The design criteria for the storage system ensures that its exposure to credible site hazards does not impair its safety function.

Individual Unit Description H.4.2.4 H.4.2.4.1 Storage Overpacks Table 1-1 identifies the storage overpack applicable for each GTCC waste canister authorized for storage at the WCS CISF. The location for descriptions of the various storage overpacks is provided in Table 4-1 with the description provided in the referenced Appendices for the applicable cask system.

H.4.2.4.2 GTCC Waste Canisters The GTCC waste canisters authorized for storage at the WCS CISF are high integrity stainless steel, welded vessels which provide confinement of radioactive materials, encapsulate the waste in a helium atmosphere, and together with a transfer cask or Storage Overpack, provide biological shielding during canister transfer and long term storage.

The GTCC waste canisters are all licensed for transport under a 10 CFR Part 71 CoC listed in Table 1-1. Drawings for each of the authorized GTCC waste canisters are listed in Section H.4.8.

The auxiliary systems that support the transfer operations associated with the GTCC waste canisters are described in Section 4.3 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-5 Decontamination System H.4.3 Equipment Decontamination H.4.3.1 The only decontamination activity performed at the WCS CISF is the removal of contamination from the outside surfaces of the transportation cask upon arrival at the site. Such contamination would be due to possible weeping of the transportation cask surface during transport to the site because the transport cask may have been immersed in fuel pools prior to arrival at the WCS CISF. The canisters and storage overpacks arrive clean and remain clean for all transfer and storage operations at the WCS CISF.

Personnel Decontamination H.4.3.2 No personnel decontamination facilities are needed at the WCS CISF. Personnel decontamination is conducted, if necessary, using the ISP Radiation Protection Program procedures.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-6 Repair and Maintenance H.4.4 Repair H.4.4.1 No repair operations are anticipated once the GTCC waste canisters are placed into storage.

Maintenance H.4.4.2 Periodic maintenance is not required. Maintenance of a minor nature can be performed within the Storage Area, without the need to move the canisters. Major maintenance operations are not required at the WCS CISF related to the GTCC waste canisters.

Storage system design features minimize or eliminate the need for maintenance. The GTCC waste canister shells are made of corrosion-resistant stainless steel. The GTCC shell internal is backfilled with helium preventing corrosion on the inside of the canister.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-7 Cathodic Protection H.4.5 The WCS CISF is dry and above ground so that cathodic protection in the form of impressed current is not required. The normal operating environment for all metallic components is above ambient air temperatures so that there is no opportunity for condensation on those surfaces.

The austenitic stainless steel GTCC canisters require no corrosion protection for any foreseeable event. Any carbon steel portions inside the canisters are contained within a sealed, dried, and inert environment backfilled with helium and is not subject to corrosion.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-8 Waste Handling Operation Systems H.4.6 GTCC waste canister handling operations are performed with the same equipment used for handling canisters containing SNF. Radiation protection of individuals involved in handling canisters is addressed in Chapter 9.

The steps involved for receiving, transferring, storing and eventual retrieval and shipment off-site for the canisterized GTCC are the same as those for canisters containing SNF and are provided in Chapter 5 and the referenced Operating Procedures in the referenced Appendices for the applicable cask system listed in Table 5-1.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-9 References H.4.7 NAC International, NAC-STC, NAC Storage Transport Cask Safety Analysis H.4-1 Report, Revision 17, CoC 9235 Revision 13, U.S. NRC Docket Number 71-9235.

NAC International, Safety Analysis Report for the UMS Universal Transport Cask, H.4-2 Revision 2, CoC 9270 Revision 4, U.S. NRC Docket Number 71-9270.

NAC International, Safety Analysis Report for the MAGNATRAN Transport Cask, H.4-3 Revisions 12A, 14A, 15A, and 16A, U.S. NRC Docket Number 71-9356.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-10 Supplemental Data Drawings H.4.8 This section provides a listing of all applicable license drawings associated with the storage of the authorized GTCC waste canisters at the WCS CISF. The drawings are incorporated by reference or enclosed as noted below.

The following drawings are for the NUHOMS MP187 Cask System GTCC Canister:

1. NUHOMS System GTCC Canister Main Assembly (five sheets), 13302-1005, Revision 0 (Included at the end of this Section).
2. NUHOMS System GTCC Canister Closure Installation (one sheet), 13302-1007, Revision 0 (Included at the end of this Section).

The following are for the NAC-MPC GTCC-Canister-CY and GTCC-Canister-YR

3. Basket Assembly, GTCC, CY-MPC, Sheets 1 thru 4, 414-887, Rev. 4 (See Section 1.3.2 of the NAC-STC, NAC Storage Transport Cask Safety Analysis Report [H.4-1])
4. Canister Shell, GTCC, CY-MPC, Sheets 1 thru 2, 414-888, Rev. 4 (See Section 1.3.2 of the NAC-STC, NAC Storage Transport Cask Safety Analysis Report

[H.4-1])

5. Assembly, Transportable Storage Canister (TSC), GTCC, CY-MPC, Sheets 1 through 3, 414-889, Rev. 7 (See Section 1.3.2 of the NAC-STC, NAC Storage Transport Cask Safety Analysis Report [H.4-1])
6. Loaded Vertical Concrete Cask (VCC), CY-MPC, Waste Control Specialists (WCS), Sheets 1 of 1, 30039-863, Rev. 0 (included at the end of this Section)
7. Basket Assembly, 24 GTCC Container, MPC-Yankee, Sheets 1 through 3, 455-887, Rev. 4 (See Section 1.3.2 of the NAC-STC, NAC Storage Transport Cask Safety Analysis Report [H.4-1])
8. Assembly, Transportable Storage Canister (TSC), 24 GTCC Container, MPC-Yankee, Sheets 1 through 2, 455-888, Rev. 8 (See Section 1.3.2 of the NAC-STC, NAC Storage Transport Cask Safety Analysis Report [H.4-1])
9. Loaded Vertical Concrete Cask (VCC), MPC-YANKEE, Waste Control Specialists (WCS), Sheets 1 through 2, 30039-862, Rev. 0 (included at the end of this Section)

The following are for the NAC-UMS GTCC-Canister-MY

10. GTCC Waste Basket, Maine Yankee, NAC-UMS, Sheets 1 through 2 790-611, Revision 6 (See Section 1.3.4 of Safety Analysis Report for the UMS Universal Transport Cask [H.4-2])

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.4-11

11. GTCC Waste Canister, Maine Yankee, NAC-UMS, Sheets 1 through 2, 790-612, Rev. 9 (See Section 1.3.4 of Safety Analysis Report for the UMS Universal Transport Cask [H.4-2])
12. Loaded Vertical Concrete Cask (VCC), NAC-UMS, Waste Control Specialists (WCS), Sheets 1 through 2, 30039-590, Rev. 0 (included at the end of this Section)

The following are for the MAGNASTOR GTCC-Canister-MY and GTCC-Canister-ZN

13. GTCC Waste Basket Liner, MAGNASTOR, Sheets 1 through 2, 71160-711, Rev. 1 (See Section 1.4.3 of the Safety Analysis Report for the MAGNATRAN Transport Cask [H.4-3])
14. Shell Weldment, GTCC TSC, MAGNASTOR, Sheets 1 through 2, 71160-781, Rev. 1 (See Section 1.4.3 of the Safety Analysis Report for the MAGNATRAN Transport Cask [H.4-3])
15. GTCC TSC, Assembly, MAGNASTOR, Sheets 1 through 2, 71160-785, Rev. 3 (See Section 1.4.3 of the Safety Analysis Report for the MAGNATRAN Transport Cask [H.4-3])
16. Loaded Vertical Concrete Cask (VCC), MAGNASTOR, Waste Control Specialists (WCS), Sheets 1 of 1, 30039-591, Rev. 0 (included at the end of this Section)

8 I

7 I

6 I

5 l

4 I

3 I

2

~

I I

~~~I som-zorn °',., I H

H G

G F

F PROPRIETARY AND E

E SECURITY RELATED INFORMATION

~

WITHHELD UNDER 10 CFR 2.390 D

D c

c B

B PARTS UST All DIMENSIONS ARE APPLICABLE AT 70-f AMO ALL TOLERANCING t\\

APPLIES AFTER WELDING c--

AND FINAL MACHINING UNLESS NOTt:O OTHERWISE.

DIMENSIONS ARE IN INCHES ANO DEGREES UNLESS NOTED OTHERWISE.

DIMENSIONING ANO TOLERANC!NG TRANSNUCLEAR IN ACCORDANCE WITH ANS! Yl4.5M-HH14.

A FRACTIONS OEOMALS ANGl.£5 A

N/A

.xx:!.05

+/-:

1*

.xxx :!:..015 rnu:

SACRAMENTO MUNlClPAl UTILITY DISTRICT BREAK AND OEBURR All SHARP EDGES.02 NUHOMSSYSTEM GTCC CANISTER 3rd ANGLE PROJECTION ~

MAIN ASSEMBLY D.-C. NO ISCJ.l[

l S.ttEtl lR('.V, NO_

00 NOT SCALE DRAWING 13302-1005 NONE 1 OF 5 0

8 I

7 I

6 I

5 T

4 I

3 I

2 I

1

8 I

7 I

6 I

5 i

4 I

3 I

2 I

1 S JO z 1 soot W£1:t 0, " I H

H G

G F

F PROPRIETARY AND E

SECURITY RELATED INFORMATION E

WITHHELD UNDER 10 CFR 2.390

-f

~

D D

c c

~

B B

ALL DIMENSIONS ARE APPLICABLE AT 70"F AND ALL TOLERANC!NG A

APPLIES AFTER WELDING f--

AND FINAL ASSEMBLY UNLESS NOTED OTHERWISE.

DIMENSIONS ARE JN INCHES ANO DEGREES UNLESS NOTED OTHERWISE.

DIMENSIONING AND TOLERANCING TRANS NUCLEAR IN ACCORDANCE W!TH ANS! Y14.5M-1994.

A FRACTIONS DECIMALS ANGLES A

N/A

.xx+/-.05

+/-

.xxx +/-.015 SACRAMENTO MUNICIPAL UTILITY DISTRICT BREAK ANO OEBURR All SHARP EDGES.02 NUHOMSSYSTEM GTCC CANISTER 3rd ANGLE PROJECTION ~

MAIN ASSEMBLY DO NOT SCALE DRAWING I...

1***

I"""

13302-1005 NONE 2 OF 5 0

8 I

7 I

6 I

5 T

4 I

3 I

2 I

1

8 I

7 I

6 I

5 l

4 I

3 I

2 I

1 g JO r.1

~oo, oa£n " ""' I H

H G

G F

F PROPRIETARY AND E

SECURITY RELATED INFORMATION E

-t WITHHELD UNDER 10 CFR 2.390

~

D D

c c

8 8

ALL DIMENSIONS ARE APPLICABLE AT ?OT AND ALL TOLERANCING A

APPLIES AFTER WELDING AND FINAL ASSEMBLY UNLESS NOTED OTHERWISE.

DIMENSIONS ARE IN INCHES AND DEGREES UNLESS NOTED OTHERWISE.

OIMENS10NING AND TOLERANC!NG TRANS NUCLEAR IN ACCORDANCE WITH ANS! Y14.5M-1994.

A FRACTIONS ANGLES A

N/A

.xx

.05

+/- 1*

.xxx :!.:.015 SACRAMENTO MUNICIPAL UTILITY DISTRICT BREAK AND DESURR ALL SHARP EDGES.02 NUHOMS SYSTEM GTCC CANISTER 3rd ANGLE PROJECTION $-----EJ--

MAIN ASSEMBLY DO NOT SCALE DRAWING l'~oNE I ~'or s I'"

'~

13302-1005 8

I 7

I 6

I 5

i 4

I 3

I 2

I 1

8 I

7 I

6 I

5 l

4 I

3 I

2 I

  • 1 s jl~J! I

'!;00l-ZO££l QN

  • ~o I H

H G

G F

F PROPRIETARY AND 1---

E SECURITY RELATED INFORMATION E

WITHHELD UNDER 10 CFR 2.390

-t D

D c

c B

B All OlMENSIONS ARE APPLICABLE AT 7(JF ANO ALL TOLERANCING A

APPUES AFTER WELDING ANO FINAL ASSEMBLY UNLESS NOTED OTHERWISE.

OtMENSIONS ARE IN INCHES ANO DEGREES UNLESS NOTED OTHERWISE.

DIMENSIONING AND TOLERANC!NG TRANSNUCLEAR IN ACCORDANCE WITH ANSI Yl 4.SM-1994.

A FRACTIONS DECIMALS ANGLES A

N/A

.xx:!:.05

+/-

1'

.xxx :!:.015 nTU:*

SACRAMENTO MUNICIPAL UTILITY DISTRICT BREAK ANO OEBURR ALL SHARP EDGES.02 NUHOMS SYSTEM GTCC CANISTER

.3rd ANGLE PROJECTION

@---*---E]-

MAIN ASSEMBLY OWG. t>O.

1Sf~i~NE 1 S~<,~F s r *~- ~-

00 NOT SCALE DRAWING 13302-1005 8

I 7

I 6

--- ~ T 5

T 4

I 3

I 2

I 1

8 I

7 I

6 I

5 l

4 I

3 I

2 I

1

~ 1~J~~ I SOOl l0£rl

    • .,.., I H

H I--

G G

I--

F F

PROPRIETARY AND E

SECURITY RELATED INFORMATION E

WITHHELD UNDER 10 CFR 2.390

~

D D

c c

8 8

ALL DIMENSIONS ARE APPLICABLE Al 7trr ANO ALL TOLERANCING A

APPLIES AFTER WELDING ANO F"lNAL ASSEMBLY UNLESS NOTED OTHERWISE.

DIMENSIONS ARE IN INCHES ANO DEGREES UNLESS NOTED OTHERWISE.

DIMENSIONING AND TOLERANCING TRANSNUCLEAR IN ACCORDANCE WITH ANS! Y\\4.SM-1994.

A FRACTIONS DECIMALS ANGLES A

N/A

.xx+/-.05

+/-

1*

.xxx +/-.015 nnx:

SACRAMENTO MUNICIPAL UTILITY DISTRICT BREAK AND DEBURR ALL SHARP EDGES.02 NUHOMSSYSTEM GTCC CANISTER 3rd ANGLE PROJECTION

@-----E]

MAIN ASSEMBLY ow;;. NO.

l s~~NE I ~;~~ 5 r ~lV. ~-

DO NOT SCALE DRAWING 13302-1005 8

I 7

I 6

I 5

i 4

I 3

I 2

I 1

8 I

7 I

6 I

5 l

4 I

3 I

2

~

I I

L JR,..;I LOOl.-l0££~

'ON.lMO I H

H G

G F

F PROPRIETARY AND E

SECURITY RELATED INFORMATION E

WITHHELD UNDER 10 CFR 2.390 D

D c

c B

B ALL DIMENSIONS ARE APPLICABLE AT 70'f ANO ALL TOLERANCING A

APPLIES AFTER WELDING AND FINAL MACHINING UNLESS NOTED OTHERWISE.

DIMENSIONS ARE IN INCHES AND DEGREES UNLESS NOTED OTHERWISE.

DIMENSIONING AND TOLERANCING TRANSNUCLEAR IN ACCORDANCE WITH ANSI Y14.5M-1994.

A FRACTIONS DECIMALS ANGLES A

N/A

.XX+/- N/A

+/- N/A

.XXX +/- N/A nru:*

SACRAMENTO MUNICIPAL UTILITY DISTRICT BREAK AND DEBURR ALL SHARP EDGES N/A NUHOMS SYSTEM GTCC CANISTER 3rd ANGLE PROJECTION -8 CLOSURE INSTALLATION OWG. NO.

1 SCAlt 1

5HttT r(V. NO DO NOT SCALE DRAWING 13302-1007 NONE 1 OF 1 0

8 I

7 I

6 I

5 T

4 I

3 I

2 I

1

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.5-i APPENDIX H.5 OPERATION SYSTEMS CANISTERIZED GTCC WASTE Table of Contents H.5 OPERATION SYSTEMS............................................................................................. H.5-1 Operation Description...................................................................................... H.5-2 H.5.1 GTCC Waste Handling Systems..................................................................... H.5-3 H.5.2

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.5-1 H.5 OPERATION SYSTEMS The tasks required to receive, transfer and store the GTCC waste canisters at the WCS CISF are the same as those provided in Chapter 5 and the referenced Operating Procedures in the referenced Appendices for the applicable cask system listed in Table 5-1.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.5-2 Operation Description H.5.1 The GTCC waste canisters are designed to be functionally identical to the SNF canisters of the same system. Existing receipt, transfer and storage procedures, to the extent possible are therefore used for receiving, transferring and storing the GTCC waste canisters. The procedures for these operations applicable to the GTCC waste cansiters are provided in Chapter 5 and the referenced Operating Procedures in the referenced Appendices for the applicable cask system listed in Table 5-1.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.5-3 GTCC Waste Handling Systems H.5.2 GTCC waste canister handling is identical to that described in the procedures provided in Chapter 5 and the referenced Operating Procedures in the referenced Appendices for the applicable cask system listed in Table 5-1 except that no SNF is contained in the GTCC waste canisters. The remaining handling systems including transfer systems and equipment and safety features remain unchanged.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.6-i APPENDIX H.6 WASTE CONFINEMENT AND MANAGEMENT CANISTERIZED GTCC WASTE Table of Contents H.6 WASTE CONFINEMENT AND MANAGEMENT.................................................. H.6-1 Waste Sources.................................................................................................... H.6-1 H.6.1 Off-gas Treatment and Ventilation................................................................. H.6-2 H.6.2 Liquid Waste Treatment and Retention......................................................... H.6-3 H.6.3 Solid Wastes....................................................................................................... H.6-4 H.6.4 Radiological Impact of Normal Operations - Summary............................... H.6-5 H.6.5

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.6-1 H.6 WASTE CONFINEMENT AND MANAGEMENT Waste Sources H.6.1 There are no radioactive wastes generated by the storage of GTCC waste at the WCS CISF. The radioactive wastes generated in the CHB are from the potential need to remove contamination (decontaminate) from the outside surfaces of the transportation cask upon arrival at the site. Such contamination would be due to possible weeping of the transportation cask surface during transport to the site because the transport cask may have been immersed in fuel pools prior to arrival at the WCS CISF.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.6-2 Off-gas Treatment and Ventilation H.6.2 There is no radioactive off-gas generated by the receipt, transfer and storage of GTCC waste canisters at the WCS CISF.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.6-3 Liquid Waste Treatment and Retention H.6.3 There are no liquid wastes generated by the receipt, transfer and storage of GTCC waste canisters at the WCS CISF.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.6-4 Solid Wastes H.6.4 There are no solid wastes generated by the storage of GTCC waste canisters at the WCS CISF. Solid low-level radioactive wastes are generated at the WCS CISF as a result of contamination surveillance and transportation cask decontamination activities. These wastes are collected, packaged and temporarily stored at the WCS CISF as described in Section 6.4 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.6-5 Radiological Impact of Normal Operations - Summary H.6.5 There are no gaseous effluents, liquid effluents or solid wastes generated by the storage of GTCC waste canisters at the WCS CISF. Section 6.4 describes how the small amounts of solid wastes generated during receipt of the transportation casks are handled.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-i APPENDIX H.7 RADIATION PROTECTION CANISTERIZED GTCC WASTE Table of Contents H.7 RADIATION PROTECTION..................................................................................... H.7-1 Ensuring that Occupational Radiation Exposures Are As Low H.7.1 As Is Reasonably Achievable (ALARA)......................................................... H.7-1 Radiation Sources............................................................................................. H.7-2 H.7.2 Characterization of Sources................................................................. H.7-2 H.7.2.1 Airborne Radioactive Material Sources............................................... H.7-2 H.7.2.2 Radiation Protection Design Features............................................................ H.7-3 H.7.3 Shielding.............................................................................................. H.7-3 H.7.3.1 Ventilation............................................................................................ H.7-3 H.7.3.2 Area Radiation and Airborne Radioactivity Monitoring H.7.3.3 Instrumentation.................................................................................... H.7-3 Estimated Onsite Collective Dose Assessment............................................... H.7-4 H.7.4 Operational and Site Dose Assessment................................................ H.7-4 H.7.4.1 Health Physics Program................................................................................... H.7-5 H.7.5 Estimated Offsite Collective Dose Assessment............................................... H.7-6 H.7.6 Effluent and Environmental Monitoring Program............................... H.7-6 H.7.6.1 Analysis of Multiple Contributions..................................................... H.7-6 H.7.6.2 Estimated Dose Equivalents................................................................ H.7-6 H.7.6.3 Liquid Release..................................................................................... H.7-6 H.7.6.4 References.......................................................................................................... H.7-7 H.7.7

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-1 H.7 RADIATION PROTECTION Ensuring that Occupational Radiation Exposures Are As Low As Is Reasonably H.7.1 Achievable (ALARA)

The policy and design considerations to maintain exposures ALARA are addressed in Chapter 9 of this SAR.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-2 Radiation Sources H.7.2 Characterization of Sources H.7.2.1 Canisterized GTCC waste is non-fuel related material generated as a result of plant operation and decommissioning where the radionuclide concentration limits for Category C in 10 CFR 61.55 are exceeded. This waste may include such components as incore components, core support structures, and small reactor related miscellaneous parts resulting from the reactor vessel internals segmentation/decommissioning processes. All waste stored within the GTCC canister are activated metals, incore instrument tips, and associated surface contamination.

The total amount of canisterized GTCC waste to be stored at the WCS CISF is approximately 510,000 pounds.

The radiological characteristics of GTCC canisters are described in Section 7.2.1 and Table 7-1 of the Rancho Seco FSAR, Appendix C [H.7-1], for the GTCC waste proposed for storage at the WCS CISF for storage in a NUHOMS System. The GTCC waste stored in NAC systems is described in the applicable transportation cask SAR and Certificate of Compliance (CoC) listed by docket number in Table 1-1.

GTCC waste for NAC systems are received from Maine Yankee (GTCC-Canister-MY), Connecticut Yankee (GTCC-Canister-CY), Yankee Rowe (GTCC-Canister-YR), and Zion (GTCC-Canister-ZN). For GTCC-Canister-MY, the GTCC waste is described in the NAC-UMS transportation cask SAR, Section 1.3.1.1.2 [H.7-2]. For GTCC-Canister-CY and GTCC-Canister-YR, the GTCC waste is described in the NAC-STC transportation cask SAR, Section 1.2.3.2 [H.7-3]. For GTCC-Canister-ZN, the GTCC waste is described in the NAC-MAGNATRAN SAR, Section 1.3.2 [H.7-4].

Airborne Radioactive Material Sources H.7.2.2 The release of airborne radioactive material is not a credible event with the system designs and procedures to be used. The GTCC waste canisters are sealed and the exterior surfaces clean upon receipt and remain sealed inside the clean canister while at the WCS CISF.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-3 Radiation Protection Design Features H.7.3 Shielding H.7.3.1 H.7.3.1.1 Radiation Shielding Design Features Shielding design features of the Storage Overpacks and Transfer Casks are addressed in Section 9.3.3.3 and the referenced sections in the referenced Appendices for the applicable cask system listed in Table 9-4 of this SAR. The shielding design features for the GTCC waste canisters are similar to the SNF canisters for the associated storage system. The outer dimensions of the GTCC waste canisters are identical to those of the SNF canisters in the associated system. Drawings showing materials of construction and thickness for the GTCC waste canisters are provided in Section H.4.8 of this SAR.

H.7.3.1.2 Shielding Analysis The shielding analysis for the NUHOMS MP187 Cask System GTCC Canister is addressed in Section 7.3.1.2 of Appendix C of [H.7-1]. The evaluation concludes that the GTCC waste canister contribution to the dose rates around the transfer cask, Storage Overpack, and therefore the site boundary is less than that calculated for the design basis SNF under normal and accident conditions. Therefore, the shielding evaluations provided for the NUHOMS MP187 Cask System with SNF canisters in Appendix A.9 are bounding and the site dose evaluations in Chapter 9 which assume all SNF canisters in the evaluation are bounding.

As detailed in Section 5.5.1.2 of the NAC-UMS Transport SAR [H.7-2], the dose rates due to Maine Yankee GTCC waste are bounded by the dose rates for canisterized design basis SNF, as presented in UMS Transport SAR Section 5.1.3. As detailed in Section 5.1.4.2 of the NAC-STC Transport SAR [H.7-3], the dose rates due to Yankee Rowe GTCC waste are bounded by the dose rates for canistered Yankee Class fuel.

As detailed in Section 5.1.4.3 of the NAC-STC Transport SAR [H.7-3], the dose rates due to Connecticut Yankee GTCC waste are bounded by the dose rates for canistered Connecticut Yankee Class fuel. As detailed in Tables 5.1-3 and 5.1-7 of the NAC-MAGNATRAN Transport SAR [H.7-4], the dose rates due to Zion GTCC waste are bounded by the dose rates for design basis canisterized undamaged PWR fuel.

Ventilation H.7.3.2 The Storage Overpack ventilation designs are identical to those for SNF canisters which have much higher heat loads as compared to the GTCC waste canisters.

Area Radiation and Airborne Radioactivity Monitoring Instrumentation H.7.3.3 The same area radiation and airborne radioactivity monitoring instrumentation is applicable to GTCC waste storage and is addressed in Section 9.3.5.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-4 Estimated Onsite Collective Dose Assessment H.7.4 Operational and Site Dose Assessment H.7.4.1 Receipt, transfer activities and storage of the GTCC waste canisters are bounded by the same activities with canisters containing SNF. As addressed in Section H.7.3.1.2, occupational and site dose evaluations include the storage of GTCC waste canister which are modeled as spent nuclear fuel canisters.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-5 Health Physics Program H.7.5 The organization, equipment, facilities and procedures of the radiation protection program are addressed in Section 9.5 and are applicable to the GTCC waste canister operations.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-6 Estimated Offsite Collective Dose Assessment H.7.6 Effluent and Environmental Monitoring Program H.7.6.1 No effluents are released from the WCS CISF during operation. There are no gaseous or liquid wastes generated during storage of the GTCC waste canisters. Since no effluents are released from the WCS CISF no effluent monitoring program is required.

Analysis of Multiple Contributions H.7.6.2 As addressed in Section H.7.3.1.2, dose rates from the canisterized GTCC waste are bounded by the dose rates from canisters containing SNF in the same system.

Therefore, by assuming that the Storage Overpacks contain a SNF canister, the onsite and offsite direct and scattered dose rates are bounding when some of the Storage Overpacks contain GTCC waste canisters.

It is therefore concluded that the radiation exposure due to storage of the GTCC waste canisters adjacent to the SNF storage do not exceed the regulatory requirements of 10 CFR Part 72 and 40 CFR Part 190.

Estimated Dose Equivalents H.7.6.3 Since no airborne effluents are postulated to emanate from the WCS CISF, the direct and air scattered radiation exposures addressed in previous sections comprises the total radiation exposure to the public. No estimation of effluent dose equivalents is necessary.

Liquid Release H.7.6.4 No radioactive liquids are released from the WCS CISF.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.7-7 References H.7.7 Rancho Seco Independent Spent Fuel Storage Installation Safety Analysis Report, H.7-1 NRC Docket No. 72-11, Revision 4.

NAC International, Safety Analysis Report for the UMS Universal Transport H.7-2 Cask, Revision 2, CoC 9270 Revision 4, USNRC Docket Number 71-9270.

NAC International, NAC-STC, NAC Storage Transport Cask Safety Analysis H.7-3 Report, Revision 17, CoC 9235 Revision 13, USNRC Docket Number 71-9235.

NAC International, Safety Analysis Report for the MAGNATRAN Transport Cask, H.7-4 Revisions 12A, 14A, 15A, and 16A, USNRC Docket Number 71-9356.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.8-i APPENDIX H.8 ANALYSIS OF DESIGN CANISTERIZED GTCC WASTE Table of Contents H.8 ANALYSIS OF DESIGN............................................................................................. H.8-1 Normal and Off-Normal Operations............................................................... H.8-2 H.8.1 Accident Analyses for the WCS CISF............................................................. H.8-3 H.8.2 Accidental GTCC Canister/Cask Drop................................................ H.8-3 H.8.2.1 GTCC Canister Leakage...................................................................... H.8-3 H.8.2.2 Accident Pressurization....................................................................... H.8-3 H.8.2.3 Earthquake........................................................................................... H.8-3 H.8.2.4 Fire....................................................................................................... H.8-3 H.8.2.5 References.......................................................................................................... H.8-4 H.8.3

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.8-1 H.8 ANALYSIS OF DESIGN In previous sections of this SAR, the features of the WCS CISF which are important to safety have been identified and addressed. The purpose of this section is to present the engineering evaluations for normal and off-normal operating conditions, and to establish and qualify the system for a range of credible and hypothetical accidents.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.8-2 Normal and Off-Normal Operations H.8.1 The normal and off-normal WCS CISF operations for dead weight, operational loads, and live loads are listed in Table 1-2 and addressed in Chapter 3 of this SAR. The various GTCC waste canisters are comparable to the SNF canisters in the following parameters:

The nominal thickness of the various GTCC waste canister shells and cover plates are equal to, or greater than the thickness specified for the SNF canisters for the associated Cask System listed in Table 1-1 of this SAR.

The material properties specified for the various GTCC waste canister shell assemblies have identical chemical and physical properties as the material specified for the SNF canisters for the associated Cask System listed in Table 1-1 of this SAR.

The required thickness of the welds in the various GTCC waste canister shells is equal to or greater than the nominal thickness specified for the SNF canisters for the associated Cask System listed in Table 1-1 of this SAR.

In addition, the GTCC waste specified for the various GTCC waste canisters are comprised of large pieces of steel and not SNF. The contents remain intact under all possible loading conditions as they are inherently much more rigid than the SNF assemblies.

The GTCC waste canisters contain insignificant heat load. Internal pressures are therefore not anticipated to be significantly greater than the helium backfill pressures.

In addition, temperature variations in the GTCC waste canister shell assemblies are small. Since the heat load is small and the material temperatures are only be slightly greater than ambient, the temperature variations at any point in the shells are approximately equal to the variation in ambient temperature. These small temperature cycles do not result in damage to, or failure of, the various GTCC waste canister shell assemblies.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.8-3 Accident Analyses for the WCS CISF H.8.2 The accident conditions for cask drop, canister leakage, earthquake, and fire are listed in Table 1-2 of this SAR. The various GTCC waste canisters are comparable to the SNF canisters for the associated Cask System listed in Table 1-1 of this SAR for the parameters provided in Section H.8.1 above. Accident pressurization is not considered a credible event due to the very low heat load of the GTCC waste canisters.

Accidental GTCC Canister/Cask Drop H.8.2.1 Section 5.2.2 of the Technical Specifications [H.8-1] addresses required inspections following a cask drop.

GTCC Canister Leakage H.8.2.2 The various GTCC canister shells are designed with pressure retaining features to prevent leakage of contaminated materials. There are no credible conditions that can breach the canister shell or fail the welds at each end of the canisters. The GTCC waste closure lid welds are multi-pass closure welds and are the same as closure welds for canisters loaded with SNF. Performance of a multi-pass closure weld on GTCC waste canisters ensures no leakage path through the closure lid to shell weld. Some of the canisters also include a redundant closure lid with multi pass welds providing an additional barrier to leakage at the ends.

Accident Pressurization H.8.2.3 The various GTCC canisters contain insignificant heat loads. In addition, temperature variations in the various GTCC shell assemblies are small. Since the heat load is small and the material temperatures are only slightly greater than ambient, the temperature variations at any point in the shell are approximately equal to the variation in ambient temperature. These small temperature cycles do not result in damage to, or failure of, the GTCC shell assemblies.

Earthquake H.8.2.4 A seismic event is not expected to negatively impact the GTCC waste canisters. The GTCC waste canisters are comparable to the previously analyzed SNF canisters for the associated Cask System listed in Table 1-1 of this SAR.

Evaluations of the effects and consequences of the earthquake event for the Storage Overpacks are addressed in Chapter 12 and the referenced Appendices for the applicable cask system listed in Table 12-1.

Fire H.8.2.5 The evaluations are presented in Chapter 12 and the referenced Appendices for the applicable cask system listed in Table 12-1.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.8-4 References H.8.3 Proposed SNM-1050, WCS Consolidated Interim Storage Facility Technical H.8-1 Specifications, Amendment 0.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-i APPENDIX H.9 CONDUCT OF OPERATIONS CANISTERIZED GTCC WASTE Table of Contents H.9 CONDUCT OF OPERATIONS.................................................................................. H.9-1 Organizational Structure................................................................................. H.9-2 H.9.1 Pre-Operational Testing and Operation......................................................... H.9-3 H.9.2 Training Program............................................................................................. H.9-4 H.9.3 Normal Operations........................................................................................... H.9-5 H.9.4 Emergency Planning......................................................................................... H.9-6 H.9.5 Decommissioning Plan...................................................................................... H.9-7 H.9.6

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-1 H.9 CONDUCT OF OPERATIONS The organization and general plans for operating the WCS CISF are not altered or modified by the addition of the GTCC waste canisters. The external characteristics of the various GTCC waste canisters are functionally identical to those of the SNF canisters for the associated Cask System listed in Table 1-1 of this SAR. Existing procedures, qualifications and training used for the SNF receipt, transfer and storage operations are used to the extent possible for the GTCC waste canisters.

The VP Operations is responsible for the overall operation and maintenance of the WCS CISF and for ensuring the safe storage of the canisterized SNF and GTCC waste.

Administrative programs such as radiation protection, environmental monitoring, emergency preparedness, quality assurance, and training need not be modified for the receipt, transfer and storage of the GTCC waste canisters.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-2 Organizational Structure H.9.1 Organizational structure is not altered by receiving, transferring and storing the GTCC waste canisters.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-3 Pre-Operational Testing and Operation H.9.2 Functional tests of receipt operations, transfer operations, and storage and retrieval for the canisterized SNF are the same as for the various GTCC waste canisters for the associated Cask System listed in Table 1-1 of this SAR. Therefore, functional tests of equipment, transfer operations, and Storage Overpack loading and retrieval are performed as part of preparation for the canisters containing SNF of the same system and new or additional pre-operational testing and operation steps are not required for GTCC waste canisters.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-4 Training Program H.9.3 The various GTCC waste canisters are functionally identical to the SNF canisters for the associated Cask System listed in Table 1-1 of this SAR. The training program addressed in Section 13.3 of this SAR is applicable to the GTCC waste canister operations.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-5 Normal Operations H.9.4 The preparation, review, approval, and adherence to procedures described in Section 13.4 of this SAR cover the GTCC waste canister operations.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-6 Emergency Planning H.9.5 The Emergency Plan covers receipt, transfer and storage of the various GTCC waste canisters at the WCS CISF. See Section 13.5 of this SAR for emergency planning details.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.9-7 Decommissioning Plan H.9.6 The WCS CISF Decommissioning Plan covers receipt, transfer and storage of the various GTCC waste canisters at the WCS CISF. See Section 13.6 of this SAR for discussion of the Decommissioning Plan for the WCS CISF.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.10-i APPENDIX H.10 OPERATING CONTROLS AND LIMITS CANISTERIZED GTCC WASTE Table of Contents H.10 OPERATING CONTROLS AND LIMITS.............................................................. H.10-1 Proposed Operating Controls and Limits.................................................... H.10-1 H.10.1 Development of Operating Controls and Limits.......................................... H.10-2 H.10.2 References........................................................................................................ H.10-3 H.10.3

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.10-1 H.10 OPERATING CONTROLS AND LIMITS Proposed Operating Controls and Limits H.10.1 The WCS CISF storage system is unaffected by the storage of canisterized GTCC waste.

Controls and limits on the GTCC waste canisters are applied to provide assurance that the WCS CISF uses the same controls and limits as those for the canisters containing SNF. Operating controls and limits are addressed in the Technical Specifications

[H.10-1] and Chapter 14. Use of the organizational and administrative systems and procedures, record keeping, review, audit, and reporting requirements coupled with the requirements of this SAR ensures that the operations involved in the storage of canisterized GTCC waste at the WCS CISF are performed in a safe manner. This includes the verification of the GTCC waste canisters prior to and during placement into the storage overpacks.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.10-2 Development of Operating Controls and Limits H.10.2 The bases for the operating controls and limits specified in Chapter 14 are applicable to GTCC waste canister handling and storage at the WCS CISF to maintain the public health and safety. The Technical Specifications and/or SAR for canisterized spent nuclear fue1 storage are unaffected by the presence of canisterized GTCC waste.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.10-3 References H.10.3 Proposed SNM-1050, WCS Consolidated Interim Storage Facility Technical H.10-1 Specifications, Amendment 0.

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.11-i APPENDIX H.11 QUALITY ASSURANCE CANISTERIZED GTCC WASTE Table of Contents H.11 QUALITY ASSURANCE.......................................................................................... H.11-1

WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page H.11-1 H.11 QUALITY ASSURANCE The Quality Assurance Program Description is not altered or modified by the GTCC waste canisters. Section 1.4.4.3 of this SAR includes discussion and the reference to the Quality Assurance Program Description.