Preparation and Scheduling of Operator Licensing Examinations
ML18135A084
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 04/25/2018
From: Mark D. Sartain
Dominion Energy Nuclear Connecticut, Dominion Energy Services, Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18135A084 (6)


Text

Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com April 25, 2018 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

~

Dominion

~

Energy Serial No.:

18-179 NLOS/vlh Docket Nos.: 50-336/423 50-338/339 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE

SUMMARY

2018-02 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2018-02, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy Nuclear Connecticut, Inc. and Virginia Electric and Power Company

Enclosures:

NRC Form 536 for Millstone, North Anna and Surry Power Stations cc:

U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-271.3 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257

Mr. Richard Guzman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pik~

Rockville, MD 20852-2738 Mr. James R. Hall U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 81-A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 N,RC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station SN 18-179 Scheduling of Operator Licensing Examinations Page 2 of 2

I I

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~c,.,,.RREG(t.C..>.

'?o OPERA TOR LICENSING Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This f

s information collection is used to plan budgets and resources for operator examinations.

Send lo EXAMINATION DATA comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear

~

I Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,

"+.,

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION I

Millstone Power Station Unit 2 11 I

I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR 8

8 OPERATORS NUMBER OF SENIOR REACTOR 4

4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4

4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09/14/20 09/12/22 ALTERNATE DATE 09/21/20 09/19/22 NRC FORM 536 (11-2017)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~*""""'-<

~..:J

>o OPERA TOR LICENSING Estimated burden per response to comply with this voluntary infonmation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This 0

~

infonmation collection is used to plan budgets and resources for operator examinations.

Send

/!!

n 0

comments regarding burden estimate to the lnfonmation Services Branch (T-2 F43), U.S. Nuclear

\\;;

EXAMINATION DATA

~

I:~

Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,

...,4'.,,

~o"'

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collection.

FACILITY NRCREGION I

North Anna Power Station Units 1 & 2 11 II I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR 7

8 OPERATORS NUMBER OF SENIOR REACTOR 7

3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/08/20 06/06/22 ALTERNATE DATE 06/15/20 06/13/22 NRC FORM 536 (11-2017)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131

  • EXPIRES: 11/30/2020 (11-2017)

,;:,Y,$1'-f/.REG(tl..f>.

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

<?,.

OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send ti

~

~

0 comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear t;

EXAMINATION DATA Regulatoiy Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, *

\\

and to the Desk Officer, Office of Information and Regulatoiy Affairs, NEOB-10202, (3150-0131), Office

,s..l)

+,O of Management and Budge~ Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRCREGION I

Surry Power Station Units 1 & 2 11 II I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS

8. INITIAL OPERATORLICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR 11 11 OPERATORS NUMBER OF SENIOR REACTOR 3

3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 08/03/20 08/01/22 ALTERNATE DATE 08/10/20 08/08/22 NRG FORM 536 (11-2017)