UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 18, 2018 Mr. Brad Berryman Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2-CORRECTION TO TECHNICAL SPECIFICATION PAGE 3.8-27 FOR ERROR INTRODUCED DURING THE ISSUANCE OF AMENDMENT NO. 227 (CAC NO. MD8465)
Dear Mr. Berryman:
On December 11, 2008 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML082970264), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 248 and 227 to Renewed Facility Operating License Nos. NPF-14 and NPF-22 for the Susquehanna Steam Electric Station (SSES), Units 1 and 2, respectively. The amendments revised Susquehanna Nuclear, LLC (the licensee), Units 1 and 2 Technical Specification (TS} 3.8.4, "DC Sources - Operating," to establish two new Conditions, A and B, the associated Required Actions with their completion times, and also, to make some editorial and administrative changes.
Subsequent to the issuance of these amendments, the licensee notified the NRC by letter dated April 17, 2018 (ADAMS Accession No. ML18107A712), that an administrative error was made on SSES Unit 2 TS page 3.8-27. Specifically, during the issuance of the amendments, a typographical error was inadvertently introduced with the addition of the two new conditions (Conditions A and B) to the Actions of the limiting condition for operation which relettered the existing conditions by two letters. Condition H should refer back to not meeting Condition G (a shift of two letters). Condition H should state, "Required Actions and associated Completion Times of Condition G not met."
The NRC staff has determined that this error was made inadvertently. The correction does not change any of the conclusions associated with the issuance of Amendment Nos. 248 and 227 and does not affect the associated notice to the public. This inadvertent change was neither addressed in the notice for the amendments nor reviewed as part of the license amendment request. Enclosed is a corrected TS page 3.8-27 for SSES Unit 2 Amendment No. 227. The revised page contains an additional marginal line indicating the area of change.
If you have any questions regarding this matter, I may be reached at 301-415-1387 or by e-mail at Tanya.Hood@nrc.gov.
J
- incerely,
(
I I 1 JJ a_, t / iJ{i!r,J r:n~1E. Hood, Project Manager Plant Licensing Branch I Docket No. 50-388
Enclosure:
Corrected SSES Unit 2 TS page 3.8-27 for Amendment No. 227 cc: Listserv Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ENCLOSURE Corrected TS page 3.8-27 for Amendment No. 227 issued December 11, 2008 Susquehanna Steam Electric Station, Unit 2
ACTIONS (continued)
CONDITION E.
Diesel Generator E DC E.1 electrical power subsystem inoperable, when not aligned to the Class 1 E distribution system.
F.
Diesel Generator E DC F.1 electrical power subsystem inoperable, when aligned to the Class 1 E distribution system.
G.
One or more Unit 1 DC G.1 electrical power subsystem(s) inoperable.
AND G.2 H.
Required Actions and H.1 associated Completion Times of Condition G not met.
SUSQUEHANNA - UNIT 2 REQUIRED ACTION Verify that all ESW valves associated with Diesel Generator E are closed.
Declare Diesel Generator E inoperable.
Transfer associated Unit 1 and common loads to corresponding Unit 2 DC electrical power subsystem.
Restore Unit 1 and common loads to corresponding Unit 1 DC electrical power subsystem.
Declare associated common loads inoperable.
TS/ 3.8-27 DC Sources-Operating 3.8.4 COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 72 hours after Unit 1 DC electrical power subsystem is restored to OPERABLE status.
Immediately Amendment 454, 227
ML18108A042 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC NRR/DORL/LPL 1/PM NAME THood LRonewicz JDanna THood (JBurkhardt for)
DATE 04/18/2018 04/18/2018 04/18/2018 04/18/2018