ML18096B215

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-70 & DPR-75, Changing TS 3/4.1.1,reactivity Control Sys,Boration Control & Shutdown Margin SRs to Provide Clarification of Method of Shutdown Margin Verifications in Modes 1 & 2
ML18096B215
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/21/1993
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18096B216 List:
References
NLR-N92124, NUDOCS 9301290202
Download: ML18096B215 (6)


Text

Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-120Q Vice President - Nuclear Operations JAN 2 1 *1993 NLR-N92124 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

REQUEST FOR AMENDMENT REACTIVITY CONTROL SYSTEMS.

SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 In accordance with the*requirements of 10CFR50.90, Public Service Electric and Gas Company (PSE&G) hereby transmits a request for amendment of Facility Operating Licenses DPR-70 and DPR-75 for Salem Generating Station, Units Nos 1 and 2, respectively.

In accordance with 10CFR50.91 (b) (1) requirements, a copy of this request has been sent to the State of New Jersey.

The proposed amendment modifies Technical Specification 3/4.1.1 Reactivity Control Systems - Boration Control -

Shutdown Margin T

> 200°F Surveillance Requirements.

The proposed change p~Z~ides clarification of the method of shutdown margin verifications.

I includes a description, reason, justification and significant hazards analysis for the proposed change. contains the Technical Specification pages revised with pen and ink changes.

PSE&G is requesting a 60 day implementation period after amendment approval.

280033

./-- -930l"2'90202-*9ao12r - -----

1 PDR ADOCK 05000272 P

PDR

Document Control Desk NLR-N92124 2

JAN 211993 Should there be any questions with regard to this submittal, please do not hesitate to contact us.

c Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Sincerely,

~~

Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625

'I REF: NLR-N92124 STATE OF NEW JERSEY SS.

COUNTY OF SALEM

s. LaBruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas.company, and forth :in the above referenced Generating Station, Unit Nos.

as such, I find the matters set letter, concerning the Salem 1 and 2, are true to the best of my knowledge, information and belief.

Subscribed this cli/st 1993 KIMBERLY A. HILL NOTARY PUBLIC qF NEW JERSEY My Commission Expires March 9, 1997

~y*commission expires on

\\

NLR-N92124 LCR 92-06 REACTIVITY CONTROL SYSTEMS BORATION CONTROL -

SHUTDOWN MARGIN -

T

>200°F

~ Description of Change Modify Technical Specification 3/4.. 1.1, Boration Control, as indicated to clarify the method of performing Shutdown Margin verifications in Modes 1 and 2.

Change Surveillance Requirement 4.1.1.1.lb. to read:

When in MODE 1 or MODE 2 with K greater than or equal to 1.0, at least once peref~ hours by verifying that control bank withdrawal is within limits of Specification 3.1.3.5. **

Change Surveillance Requirement 4.1.1.l~lc. to read:

When in MODE 2 with K f less than 1.0, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving re~ctor criticality by verifying that the predicted critical control rod position is within the limits of specification 3.1.3.5. **

At bottom of page, add notation ** to read:

During performance of testing under Special Test Exception 3.10.2 and 3.10.3, calculation of Shutdown Margin considering power level and the factors of Surveillance requirement 4.1.1.1.le shall be performed at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

For Unit 1, at the bottom of the page, Delete notation # and notation ##.

II.

Reason and Justification for Change Surveillances 4.1.1.1.lb and 4.1.Ll.lc require shtitdown margin to be verified by maintaining control rods within the rod insertion limits of specification 3.1.3.5.

During performance of control rod worth measurements, it is not possible to verify shutdown margin by rod insertion limits.

Adequate shutdown margin can be verified by calculation methods as identified in surveillances 4.1.1.1.ld and 4.1.1.1.le.

Performing shutdown margin calculations during control rod worth measurements does not alter the normal operation of the facility.

NLR-N92124 The addition of the note will allow the flexibility to perform the calculations necessary to verify the shutdown margin and satisfy the surveillance without any significant hazards increase.

Notations # and ## are deleted from Unit 1 specifications because the information concerning K ff is now contained in the surveillance requirements.

e III. Significant Hazards Consideration In accordance with 10CFR50.92, PSE&G has reviewed the proposed changes and concluded the proposed changes do not involve a significant hazards consideration because the changes would not:

1.

Involve a significant increase in the probability or consequences of an accident previously analyzed.

The proposed changes clarify the method of verifying that the shutdown margin is within limits during control rod worth measurements.

Deletion of the notations for k ff for Unit 1 is an administrative change to incluae the information within the specific surveillance requirement.

The proposed changes do not alter the normal operation of the facility.

Therefore, these changes would not increase the probability or consequences of a previously analyzed accident.

2.

Create the possibility of a new or different kind of accident.

The proposed changes clarify the method of verifying that the shutdown margin is within limits during control rod worth measurements.

The proposed changes do not alter the normal operation of the facility.

Deletion of the notations for k fr for Unit 1 is an administrative change to includ~ ehe information within the specific surveillance requirement.

Therefore, these changes would not create the possibility of a new or different kind of accident.


** -~-

NLR-N92124 3.

Involve a significant reduction in a margin of safety.

The proposed changes clarify the method of verifying that the shutdown margin is within limits during control rod worth measurements.

The proposed changes do not alter the normal operation of the facility.

Deletion of the* notations for k ff for Unit 1 is an administrative change to includ~ ehe information within the specific surveillance requirement.

Therefore, these changes would not involve a significant reduction in a margin of safety.

IV.

Conclusions Based on the information presented above, PSE&G has concluded there is no significant hazards consideration.