Text
I I
UNITED STATES NUCLEA,R REGULATORY COMMISSION WASHINGTON. D.C. 20555 Docket No. 50-272 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
March 11, 1991
SUBJECT:
FIRST TEN-YEAR INSPECTION INTERVAL, INS ERV ICE INSPECTION PROGRAM RELIEF REQUEST, SALEM NUCLEAR GENERATING STATION, UNIT 1 (TAC NOS. 66013 AND 71101)
By letters dated July 17, 1987, June 6, 1988, and November 28, 1988, Public Service Electric and Gas Company (licensee) submitted to the NRC requests for relief from the requirements of Section XI of the ASME Code* (1974 Edition through Summer 1975 Addenda) for the First Ten-Year Interval Inservice Inspection Program Plan for the Salem Nuclear Generating Station, Unit 1.
- The Materials and Chemical Engineering Branch, Division of Engineering Technology, has reviewed and evaluated the requests for relief from some Section XI requirements that the licensee determined to be impractical to perform at the facility.
We have determined that these requirements of Section XI are impractical to perform at the facility and we have granted, pursuant to 10 CFR 50.55a(g)(6)(i), the relief requested and authorized alternatives proposed where the necessary findings could be made. This relief is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due
- consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
An evaluation of the reliefs and the bases*for granting the requests are contained in the enclosed Safety Evaluation (SE). It should be noted that the second Ten-Year Inservice Inspection Interval and associated requests for relief were approved in a letter dated April 17, 1990. This current approval of relief for the First Ten-Year Interval is for record purposes only in that the second Ten-Year Interval is the one in use.
Mr. Steven March 11, 1991 We conclude that the relief from the ASME Code,Section XI (1974),
requirements that were impractical to perform and as evaluated in the enclosed SE is granted. Granting this relief will not significantly reduce the assurance of the plant's structural integrity or safety.
Enclosure:
Safety Evaluation cc w/enclosure:
See next page DISTRIBUTION:
Docket File NRC & Local PDR TMurley/FMiraglia JP art low, 126-18 CRossi SVarga EGreenman WButler MO'Brien(3)
RBlough/JWhite, RGN-I
- Previously Concurred JS tone OGC EJordan, 3701 GHill(4)
ACRS(lO)
GPA/PA Sincerely,
/SI Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OC/LFMB JCaldwell, RGN-I GJohnson, 7D-4 TMclellan, 70-4
~~~---: -. __ ! -------- ~ ~~:::~~~------ ~ ~~:==-~tJ-~- ~ :~~: __________ ~ --------------
NAME
- M l
n
- JStone:tlc
- ~!Butler
._ :MYoung
:-----~--------:------- - ----:--------------:--------------
DATE 1
'/ /91
- '3/'0/91
- .
- Jlt\\/91
- 03/01/91 FFI AL RECORD COPY Document Name:
TAC NOS. 66013/71101
Mr. Steven March 11, 1991 We conclude that the relief from the ASME Code,Section XI (1974),
requirements that were impractical to perform and as evaluated in the enclosed SE is granted. Granting this relief will not significantly reduce the assurance of the plant's structural integrity or safety.
Enclosure:
Safety Evaluation cc w/enclosure:
See next page Sincerely, Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects - I/II.
Office of Nuclear Reactor Regulation
Mr. Steven E. Miltenberger Public Service Electric & Gas Company Salem Nuclear Generating Station cc:
Mark J. Wetterhahn, Esquire Bishop, Cook, Purcell & Reynolds 1400 L Street NW Washington, DC 20005-3502 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Co11111ission Drawer I Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection CN 415 Trenton, NJ 08625-0415 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., 51A-13 Wayne, PA 19087 Richard B. McGlynn, Co11111ission Department of Public Utilities State of Mew Jersey 101 Co1J1T1erce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia 9 PA 19406 Lower Alloways Creek Township c/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ* 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Mr. Jack Urban General Manager, Fuels Department Delmarva Power & Light Company 800 King Street Wilmington, DE 19899 Public Service Conunission of Maryland Engineering Division ATTN:
Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486