ML18078B051

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-311/78-55 on 781219-21.No Noncompliance Noted
ML18078B051
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/05/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Martin T
Public Service Enterprise Group
Shared Package
ML18078B052 List:
References
NUDOCS 7903210016
Download: ML18078B051 (2)


See also: IR 05000311/1978055

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA 19406

Docket No.

50~311

FEB 5

1979

Public Service Electric & Gas Company

ATIN:

Mr. T. J. Martin

.

Vice President

Engineering and Construction

80 Park Place

Newark, New Jersey 07101

Gentlemen:

Subject:

Inspection 50-311/78-55

This refers to the inspection conducted by Dr. M. Shanbaky of this

office on December 19-21, 1978, and January 8-12 and 15-17, 1979, at

Salem Nuclear Generating Station, Unit 2, Hancocks Bridge, New Jersey,

of activities authorized by NRC License No. CPPR-53 and to*the discussions

of our findings held by Dr. Shanbaky with Messrs. R. Griffith, D. Cooley,

and other me.mbers of your staff at the conclusion of the inspection, and

to a subsequent telephone discussion between Dr. Shanbaky and Mr. E.

Meyer on January 30, 1979.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with.this

letter. Within these areas; the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's "Rules of Practice,

11 Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

7903210 C\\<0:,

e

Public Service Electric & Gas Company

2

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information so_ught to be withheld shall be incorporated as

far as possible into a separate part of the affidavit. If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

_,{/~

G r

H. Smith, Chief

F el Facility and Materials Safety

Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-311/78-55

cc w/encl:

E. N. Schwalje, Manager - Quality Assurance,

Engineeri_ng and Construction Department