ML18066A749

From kanterella
Jump to navigation Jump to search
Submits SG Tube Surveillance Rept Re Tubes Plugged During Insp Completed 961128
ML18066A749
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/06/1996
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9612160420
Download: ML18066A749 (2)


Text

consumers Po~er

- ~

~

~. l'intEIUll&'. --_-.

_. ' I MIUllliAll-S l'IUllilUJS :

Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 December 6, 1996 U.S. Nuclear Regu.latory Commission Document Control Desk Washingfon, DC 20555 odc"kET 50-25S -~ LICENSE DPR PALISADES PLANT *'

-. Thomas C. Bordlne Managei; Licensing

_STEAM GENERATOR TUBE SURVEILLANCE REPORT - TUBES PLUGGED Palisades Technical Specification 6.6.9a requires that the number of tubes plugged in each steam generator shall be reported to the NRC within fifteen days following the completion of an inservice inspection of steam generator tubes. On November 28, 1996, an inservice inspection of the Palisades steam generator tubes was completed.

A total of four tubes were plugged in Steam Generator E-50A on November 28, 1996.

No additional tubes were required to be plugged in Steam Generator E-50B as a result of this inspection. The total number of tubes plugged in Steam Generator E-50A is 313.

The total number of tubes plugged in Steam Generator E-50B is 309.

In accordance with Palisades Technical Specification 6.6.9b, a complete steam*

_______ ___: _g?Derator inservice insp_~9tLQD_@QOrt_\\Xi_I! be subi:nit!_~d-~lt_hin_Rr:!!9!!~b~---** _ -- --- ---* -----

(

9612160420 961206 I

PDR ADOCK 050002551 PDR ;

G I

t it)* J)ll)-"))"lf_

1 W:'\\:1.,.,;~11

~

114, A CMS' ENER6YCOMPANY

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

Thomas C. Berdine Manager, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USN RC NRC Resident Inspector - Palisades 2