ML18065A821

From kanterella
Jump to navigation Jump to search
Forwards Corrected Pages for Handout Used at Predecisional Enforcement Conference Held on 960621 Re App R Compliance
ML18065A821
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/17/1996
From: Smedley R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9607230079
Download: ML18065A821 (4)


Text

...

consumers Power POW ERi Nii MICHlliAN"S-PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 17, 1996 U. S. Nuclear Regulatory-Commission

.Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR-20 -- PALISADES PLANT CORRECTED PAGES FOR HANDOUT USED AT THE PREDECISIONAL ENFORCEMENT CONFERENCE CONCERNING APPENDIXR COMPLIANCE HELD JUNE 21, 1996 AT REGION Ill On June 21, 1996, Consumers Power Company attended a Predecisio_nal Enforcement Conference at Region Ill concerning 1 O CFR 50 Appendix R compliance for the.

Palisades Plant.

As part of the Consumers Power Company presentation, a document containing technical information was provided to the NRC. After the conference was completed, errors werediscovered in the technical information. The purpose of this letter is to -

dockf.; the corrected information. The pages in error have been revised and are an*

attachment to this letter, with changes noted in the margins.

SUMMARY

OE COMMITMENTS CC Administrator, Region Ill, USNRC

_Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment

--9607230079 96071 7 PDR ADOCK 05000255 Q

PDR

(

A CMS' ENER<!i'Y COMPANY

ATTACHMENT CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 PREDECISIONAL ENFORCEMENT CONFERENCE

-10 CFR 50 APPENDIX R COMPLIANCE -

DATED JUNE 21, 1996, TECHNICAL INFORMATION - CORRECTED PAGES 2 Pages.

0

  • JUNE 21,-1996. < *,

"*t 10 CFR 50 APPENDIX R COMPLIANCE orscuSSION OF VIOLATIONS VIOLATION 1*EXAMPLE1: DIAGRAM OF IMPACTED FIRE AREAS r----:-----1 r I ---

! I o.....a...-1-2 I

'----,----' ----r--.J

==::;;:;:;;;: - - - J._ -

,--.:_;_ Q_S~gr.., *.

I i..os~'

............ Ii~=~*'----

'----~

10 Revised 7 /10/96

JUNE 21, 1996

~.**.1.

.\\:.. **.. il.. \\

.. l:.. i.i.:l.l.**..***. **.i.***.:*t.!\\.*i.i.****.:i:.*:!.i.. i

  • . iliiil.. ie.i.**.****:.**.:.:.* *.:11.*:*:**

.* *.* *.:~*.*.**.\\s.:.*:*:.*:**.*:**.**.:.:.\\m.*

.* **:****.**.*.**.*... *:.:.!.1.:.**.*

.* *.**.**.*:.*.. *.:.. *.~

.* *.!*.**.::.*.:l\\ilil\\fiijll\\lll\\iil-s1M&li::111iillii&*ill!E:i:i\\\\l:r::.:.. :.:.:*:*:>>:.°'.::::~;::*::;;*:;1::~;;:::

10 CFR 50 APPENDIX R COMPLIANCE DISCUSSION OF VIOLATIONS VIOLATION 1 - EXAMPLE 1: SIGNIFICANCE OF ISSUE ACTUAL SAFETY SIGNIFICANCE:

INVESTIGATION CONCLUDED THAT LOW VOLTAGE CUT-OFF SET POINT WAS CORRECTLY SET. BOARD INOPERABLE ONLY DURING SHORT LCO PERIOD -ACTUAL SAFETY SIGNIFICANCE IS MINIMAL EVEN IF SET POINT NOT CORRECTLY SET, ACTUAL SAFETY SIGNIFICANCE IS LOW BASED ON THE FOLLOWING:

OF THE 5 FIRE AREAS WHERE CREDIT IS GIVEN FOR THE ALTERNATE SHUTDOWN PANEL, ONLY 4 AREAS ARE IMPACTED DIRECTLY BY THIS POTENTIAL PROBLEM PROBABILITY OF DAMAGING FIRE IS LOW:

o LOW TO MODERATE FIRE LOAD o

DETECTION AND AUTOMATIC SUPPRESSION o

FIRE TOURS (SINCE LATE SUMMER 1994)

  • o. REQUIRES MULTIPLE AND SELECTIVE FAILURES EVEN IF A DAMAGING FIRE, SAFETY ANALYSIS, SIMULATOR RUNS, AND DISCUSSIONS WITH OPERATORS DEMONSTRATE THAT PLANT WOULD HAVE MAINTAINED LOCAL CONTROL OF AFW. WITH AFW, PLANT COULD ACHIEVE AND MAINTAIN SAFE SHUTDOWN:

o FOR -8 HOURS WITHOUT OPERATOR ACTION (AFW STARTING VERIFIED) o FOR OVER 20 HOURS WITH MINIMAL ACTIONS o

AC POWER RESTORATION -

3 - 5 HOURS o

WHILE IT IS CONCLUDED C-150 WAS OPERABLE, A DISCUSSION OF SAFE SHUTDOWN WITHOUT C-150 IS PROVIDED LATER Revised 7 /10/96 15