Forwards Integrated Insp Rept 50-255/96-02 on 960127-0317.No Violations Noted
ML18065A632
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/08/1996
From: Kropp W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18065A633 List:
References
NUDOCS 9604160339
Download: ML18065A632 (4)


See also: IR 05000255/1996002

Text

,

Apri 1 8, 1996

Mr. T. Palmisano, General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

SUBJECT:

INTEGRATED INSPECTION REPORT 50-255/96002

Dear Mr. Palmisano:

'..;/*\\ *.

\\I

..., .

\\

,;'.

(

~

1

-

This refers to the routine safety inspection conducted on January 27 through

March 17, 1996, at the Palisades Nuclear Generating Facility. The purpose of

the inspection was to determine whether activities authorized by the license

were conducted safely and in accordance with NRC requirements.

At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with personnel. This

report represents an integrated product of a number of inspections conducted

during the inspection period.

The summary contained in the report provides an

overview of our assessment of your performance in the functional areas

inspected.

Based on the results of the close-out inspection of Generic Letter (GL) 89-10,

we have determined that your motor-operated valve (MOV) program implementation

. at Palisades was acceptable, and meets the intent of Generic Letter 89-10.

Program documentation and test data provided an adequate basis to conclude

that all GL 89-10 program MOVs would perform their intended safety functions

under worst-case design-basis conditions. Accordingly, we are closing the NRC

review of your program.

Management oversight of the GL 89-10 program since the Part 2 inspection was

effective. Notable improvements includeq the formation of a core MOV team to

technically strengthen the program, com~iete the te~ting, and achieve program

closure. Technical self-assessments were effectively utilized and provided

critical feedback to strengthen the program.

No violations of NRC requirements were identified during the course of this

inspection .

1G0 0 '? :~

9604160339 960408

PDR

ADOCK 05000255

Q

PDR

/.\\ t .* *

.

\\.,/

-*

T. Palmisano

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/I. N. Jackiw for

W. J. Kropp, Chief

Reactor Projects Branch 3

Docket No. 50-255

License No. DPR-20

Enclosure:

Inspection Report

No. 50-255/96002(DRP)

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

R. W. Smedley, Manager, Licensing Dept.

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General (Ml)

Distribution:

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

SRI Palisades, Big Rock w/encl

Project Manager, NRR w/encl

A. B. Beach, w/encl

Document:

R:\\insprpts\\powers\\pali\\pal96002.drp

DRP w/encl

Riii PRR w/encl

G. E. Grant, Riii w/encl

IPAS (E-Mail) w/encl

RMB/FEES w/o encl

H. J. Miller, w/encl

To receive a copy of this c1oc .... nt, indicate in the boa *c* * Copy without attach/encl "E" * Copy with attach/encl

"N" *

No co

OFFICE

RII I

NAME

Jae.

DATE

04/ . /96

04/1 /96

04~9

OFFICIAL RECORD COPY

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

801 WARRENVILLE ROAD

LISLE. IWNOIS 60532-4351

April 8, 1996

Mr. T. Palmisano, General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

SUBJECT:

INTEGRATED INSPECTION REPORT 50-255/96002

Dear Mr. Palmisano:

This refers to the routine safety inspection conducted on January 27 through

March 17, 1996, at the Palisades Nuclear Generating Facility. The purpose of

the inspection was to determine whether activities authorized by the license

were conducted safely and in accordance with NRC requirements.

At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with personnel. This

report represents an integrated product of a number of inspections conducted

during the inspection period.

The summary contained in the report provides an

overview of our assessment of your performance in the functional areas

inspected.

Based on the results of the close-out inspection of Generic Letter (Gl) 89-10,

we have determined that your motor-operated valve (MOV) program implementation

at Palisades was acceptable, and meets the intent of Generic.Letter 89-10.

Program documentation and test data provided an adequate basis to conclude

that all GL 89-10 program MOVs would perform their intended safety functions

under worst-case design-basis conditions. Accordingly, we are closing the NRC

review of your program.

Management oversight of the GL 89-10 program since the Part 2 inspection was

effective. Notable improvements included the formation of a core MOV team to

technically strengthen the program, complete the testing, and achieve program

closure. Technical self-assessments were effectively utilized and provided

critical feedback to strengthen the program.

No violations of NRC requirements were identified during the course of this

inspection.

T. Palmisano

-2-

1--

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Docket No. 50-255

License No. DPR-20

Enclosure:

Inspection Report

No. 50-255/96002(DRP)

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

R. W. Smedley, Manager, Licensing Dept.

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General (MI)