March 22, 1996 Mr. T. Palmisano, General Manager Palisades Nuclear Generating Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - PALISADES
Dear Mr. Palmisano:
On March 4, 1996, NRC Region Ill management and staff completed the semiannual Plant Performance Review (PPR) of Palisades.
The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by regional management to facilitate planning and allocation of inspection resources.
The PPR for Palisades involved the participation of all Region III technical divisions as well as responsible NRR staff, in evaluating inspection results and safety performance information for the period from September 1995 through February 1996.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance.(SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Palisades PPR review. The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately the next 6 months.
The rationale or basis for each inspection outside the "Core" inspecti~n program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by other assigned members of our site focus group, may occur at any time in support of the Core inspection program.
9603290302 6~835~55 PDR ADOCK PDR G
We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments.
If changes are necessary, you will be informed.
If you have any questions or comments, please contact me at (708) 829-9633.
Sincerely,
/s/W. J. Kropp, Chief Wayne J. Kropp, Chief Reactor Projects Branch 3 Docket Nos. 50-255 License No. DPR-20
Enclosure:
Inspection Plan cc w/encl:
Robert A. Fenech, Vice President, Nuclear Operations R. W. Smedley, Manager, Licensing Dept.
James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Department of Attorney General (Ml)
Distribution:
Docket File w/encl PUBLIC IE-01 w/encl OC/LFDCB w/encl SRI Palisades, Big Rock w/encl Project Manager, NRR w/encl A. B. Beach, w/encl (See attached concurrence)
Document:
On disk DRP w/encl RII I PRR w/encl G. E. Grant, Riii w/encl IPAS (E-Mail) w/encl RMB/FEES w/o encl To recefve a copy of thfs docWlllllnt. tndfcate fn the boa *c*
- Copy *fthout attach/encl *£*
- Copy wfth attach/encl
- N*
- No CODV OFFICE Rill I
RI II I
RII I I
Riii I
NAME Ring/Jacobson Gardner/Creed Burdick/Kozak Axelson DATE 03/ /96 03/ /96 03/ /96 03/ /96 OFFICIAL RECORD COPY
We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or conunents.
If changes are necessary, you will be informed.
If you have any questions or comments, please contact Wayne J. Kropp at {708) 829-9633.
Sincerely, Wayne J. Kropp, Chief Reactor Projects Branch 3 Docket Nos. 50-255 License No. DPR-20
Enclosure:
Inspection Plan cc w/encl:
Robert A. Fenech, Vice President, Nuclear Operations R. W. Smedley, Manager, Licensing Dept.
James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Department of Attorney General (Ml)
Distribution:
Docket File w/encl
.PUBLIC IE-01 w/encl OC/LFDCB w/encl SRI Palisades, Big Rock w/encl Project Manager, NRR w/encl A. B. Beach, w/encl Document:
On disk DRP w/encl RII I PRR w/encl G. E. Grant, Riii w/encl IPAS (E-Mail) w/encl RMB/FEES w/o encl To r9Ceive a copy o~ this c1oc...... t, indicate in the boa *c*
- Copy without attach/eftCl *[*
- Copy with attach/encl
- N*
- No co OFFICE NAME DATE 03 ~ 96 03 2.1 OFFICIAL RECORD COPY
IP - Inspection Procedure TI - Temporary Instruction PALISADES INSPECTION PLAN Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE/PROGRAM AREA NUMBER OF
- PLANNED INSPECTORS INSPECTION DATES IP 37550 Engineering and Technical 2-4 3/18-29/96 Support - Engineering IP 83750 Radiation Protection ~ Plant 1
10/21-25/96 Support IP 93808 Integrated Performanc~
4-5 6/3/96 through Assessment Process -
8/12/96 Operations, Engineering, Maintenance, and Plant Support IP 84750 Radioactive Effluents - Plant 1
7/22-26/96 Support OSRE Security - Plant Support 4
7/23-24/96 IP 71001 Licensed Operator 2
4/29 - 5/3/96 Requalification Program Evaluation - Operations IP 82301 Evaluation of Exercises -
2 9/30 Through Plant Support 10/4/96 IP 81700 Physical Security Program for 1
3/25-29/96 Power Reactors - Plant Support 7/8-12/96 I
~
TYPE OF INSPECTION - COMMENTS Core Inspection Core Inspect ion Special Core Inspection Initiative - Headquarters Review Core fnspect ion Core Inspection Core Inspection