...1>?
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 03/04/96 COMPLETED BY KAKobiata MONTH FEBRUARY TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
761
- 17.
782
- 2.
777
- 18.
783
- 3.
782
- 19.
780
- 4.
781
- 20.
777
- 5.
780
- 21.
780
- 6.
781
- 22.
781
- 7.
. 780 23.
778
- 8.
780
- 24.
779
- 9.
781 25:
778
- 10.
779
- 26.
776
- 11.
780
- 27.
777
- 12.
781
- 28.
781
- 13.
781
- 29.
781
- 14.
781
- 30.
- 15.
782
- 31.
- 16.
783 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
r---_-"-96_0_3~1=-=2:-:o:-::3;--;:5:-;:;2~96-z-.0~3;;-;0~4~--:-. ---\\
I
- PDR ADOCK 05000255 J
I R
___ P D_R;, _
_J
-'6?.
SUMMARY
OF OPERATING EXPERIENCE FOR FEBRUARY 1996 The Unit reached 100 percent power on February 2 following a January Forced Outage. The Unit operated at 100 percent for the remainder of the month.
OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
OPERATING DATA REPORT Palisades 960201-960229 2530 811. 7 805
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT.FORCED OUTAGE RATE This Month 696.0 696. 0 696.0 1755785.3 569442 542546 100.0\\
100.0\\
106.8\\
- 96.8%
- 0. Ct 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS. (TYPE, DATE AND DURATION OF EACH) :
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):.
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date
'1440. 0 1119.3 1110. 6 2766681.5 896656 853768 77.lt 77.lt 81.2%
73.7%
22.9%
Forecast DOCKET NO 50-255 DATE 03-04-96 COMPLETED BY KAKobiata TELEPHONE (616)764-8913 NOTES:
Cumulative 212127.0 122070.6 117265.3 256885371. 9 81372910 76807187 55.3%
55.3%
53.3\\*
. *- 45. 0\\
28.7\\
Achieved
REPORT MONTH --'-F"""'E""BR""U"'A""'R"-Y'-'-1 ""99""6"---
No.
Date NONE
- 1.
F: Forced S: Scheduled Type 1 2~
Reason Duration (Hours)
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Reason2
- 3.
Method:
1-Manual Method of Shutting Down Reactor
- 4.
Licensee Event Report#
2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
System Code4
- 5.
Component Code5 Exhibit I - Same Source DOCKET NO UNIT Palisades DA TE 03/04/96 COMPLETED BY KAKobiata TELEPHONE 616-764-8913 Cause & Corrective Action to Prevent Recurrence I *