Monthly Operating Rept for Feb 1996 for Palisades Nuclear Plant
ML18065A533
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/29/1996
From: Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18065A532 List:
References
NUDOCS 9603120352
Download: ML18065A533 (4)


Text

...1>?

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 03/04/96 COMPLETED BY KAKobiata MONTH FEBRUARY TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

761

17.

782

2.

777

18.

783

3.

782

19.

780

4.

781

20.

777

5.

780

21.

780

6.

781

22.

781

7.

. 780 23.

778

8.

780

24.

779

9.

781 25:

778

10.

779

26.

776

11.

780

27.

777

12.

781

28.

781

13.

781

29.

781

14.

781

30.
15.

782

31.
16.

783 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

r---_-"-96_0_3~1=-=2:-:o:-::3;--;:5:-;:;2~96-z-.0~3;;-;0~4~--:-. ---\\

I

PDR ADOCK 05000255 J

I R

___ P D_R;, _

_J

-'6?.

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1996 The Unit reached 100 percent power on February 2 following a January Forced Outage. The Unit operated at 100 percent for the remainder of the month.

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

OPERATING DATA REPORT Palisades 960201-960229 2530 811. 7 805

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT.FORCED OUTAGE RATE This Month 696.0 696. 0 696.0 1755785.3 569442 542546 100.0\\

100.0\\

106.8\\

  • 96.8%
0. Ct 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS. (TYPE, DATE AND DURATION OF EACH) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):.

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date

'1440. 0 1119.3 1110. 6 2766681.5 896656 853768 77.lt 77.lt 81.2%

73.7%

22.9%

Forecast DOCKET NO 50-255 DATE 03-04-96 COMPLETED BY KAKobiata TELEPHONE (616)764-8913 NOTES:

Cumulative 212127.0 122070.6 117265.3 256885371. 9 81372910 76807187 55.3%

55.3%

53.3\\*

. *- 45. 0\\

28.7\\

Achieved

REPORT MONTH --'-F"""'E""BR""U"'A""'R"-Y'-'-1 ""99""6"---

No.

Date NONE

1.

F: Forced S: Scheduled Type 1 2~

Reason Duration (Hours)

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Reason2

3.

Method:

1-Manual Method of Shutting Down Reactor

4.

Licensee Event Report#

2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

System Code4

5.

Component Code5 Exhibit I - Same Source DOCKET NO UNIT Palisades DA TE 03/04/96 COMPLETED BY KAKobiata TELEPHONE 616-764-8913 Cause & Corrective Action to Prevent Recurrence I *