REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)
ACCESSION NBR: 8712070231 DOC. DATE: 87/12/01 NOTARIZED:
NO DOCKET 5 F*CIL:50-259 Browns Ferry Nuclear Power Station.
Unit ii Tennessee 05000259 50-260 Browns Ferry Nuclear Power Stationi Unit 2i Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station.
Unit 3i Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION GRIDLEYi R.
Tennessee Valley Authority RECIP. NAME RECIPIENT AFFILIATION, Document Control Branch (Document Control Desk)
SUBJECT:
Provides util response to Generic Ltr 87-02 5 schedule for implementation of seismic qualification utility group generic implementation procedures. Util will provide schedule for implementing final resolution of USI A-46 in 60 days.
DISTRIBUTION CODE:
A04SD COPIES RECEIVED: LTR I
ENCL Q SIZE:
TITLE: OR/Licensing Submittal:
Equipment Qual ification NOTES: Zwolinski 3 cg.
1 cg ea to: Axelradi Ebneteri S.
Richardson'iawi G. Zechi Oli OIA.
Zwolinski 3 cg. icy ea to: Axelradi Ebneteri S. Richardsoni Liawi G. Zechi OII OIA.
Zwolinski 3 cg. icy ea to: Axelradi Ebneteri S. Richardsoni Liawi G. Zechi OII OIA.
05000259 05000260 05000296 RECIPIENT ID CODE/NAME JAMERSON> C GEARS' COP IES LTTR ENCL 1
RECIPIENT ID CODE/NAME PD STANGi J COPIES LTTR ENCL INTERNAL:
ACRS GC NRR/DEST/MEB OGC/HDS2 RES/DE/EIB EXTERNAL:
LPDR NSIC 8
1 1
1 1
ARM/DAF/LFMB NRR/DEST/ADE N
SGB G
ILE 01 NRC PDR NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 35 ENCL
4hsy
0
~
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place 088 01 1987 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
BROMNS FERRY NUCLEAR PLANT (BFN) GENERIC LETTER 87-02 AND THE SCHEDULE FOR IMPLEMENTATION OF SEISMIC QUALIFICATIONUTILITY GROUP (SQUG)
GENERIC IMPLEMENTATION PROCEDURES This letter provides TVA's response to your letter from T. E. Murley to N. P. Smith, Chairman Seismic Qualification UtilityGroup (SQUG), dated April 28, 1987.
Your letter requested all licensees participating in the USI A-46 SQUG implementation program provide the schedule for plant specific implementation no later than December 1, 1987.
The TVA Browns Ferry Nuclear Plant (BFN) is a participant in SQUG.
As stated in SQUG's October 9, 1987 response to your April 28, 1987 letter, we expect an initial generic implementation procedure for verification of the seismic adequacy of nuclear plant equipment to be available by the second quarter of 1988.
A complete generic implementing procedure addressing the detailed requirements of Generic Letter 87-02 and the staff's comments regarding the seismic verification of cable trays and conduit, heat exchangers, tanks and relays is not expected to be available until the end of 1988.
Consistent with the SQUG position described in their October 9, 1987 letter, TVA will provide a schedule for implementing the final resolution of USI A-46 within sixty days following the receipt of the NRC's Safety Evaluation Report on the final generic implementing procedure.
Should you have any questions on this letter, please telephone Patrick Carier at (205) 729-2689.
Very truly yours, TENNESSEE VALLEY AUTHORITY R.
ridley, Di ector Nuclear Licen ing and Regulatory Affairs cc:
See page 2
87i2070~~i gpp0259 7120i I'DR ADOCN. 0 PD P
An Equal Opportunity Employer
h P
I I
U.S. Nuclear Regulatory Commission DH8 Ot 1SS7 cc (Enclosures):
Mr. G.
G. Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta St.,
NM, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East-Nest Highway EWM 322
- Bethesda, Maryland 20814 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 2, P.O.
Box 311
- Athens, Alabama 35611
1 t