Discusses Insp Rept 50-400/97-06 on 970621.Violation Noted: Failure of FSAR to Accurately Reflect as-built Plant Configuration & Failure to Perform Evaluation in Accordance w/10CFR50.59.Enforcement Discretion Warranted.No NOV Issued
ML18012A838
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/22/1997
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robinson W
CAROLINA POWER & LIGHT CO.
References
50-400-97-06, 50-400-97-6, EA-97-288, NUDOCS 9707310089
Download: ML18012A838 (9)


See also: IR 05000400/1997006

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9707310089

DOC.DATE: 97/07/22

NOTARIZED: NO

~

~

~

~

CIL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina

UTH.NAME

AUTHOR AFFILIATION

REYES,L.A.

,

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

ROBINSON,W.R.

Carolina

Power

& Light Co.

DOCKET

05000400

SUBJECT:

Discusses

insp rept 50-400/97-06

on 970621.Violation noted:

failure of FSAR .to accurately reflect as-built plant

configuration

& failure to perform evaluation in accordance

w/10CFR50.59.Enforcement

discretion warranted.No

NOV issued.

DZSTRZBUTZON CODE:

ZEOZT

COZlZES RECEZVED:LTRj ENCL 0 SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

05000400

E

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

O

C

ILE CENT+

NRR DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN2

FILE ..01

EXTERNAL: LITCO BRYCE,J

H

NRC PDR

COPIES

LTTR ENCL

2

1

1

1

1

~ 1l.

RECIPIENT

ID CODE/NAME

ROONEYgV

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

0

R

D

0

THIS DOCUMENT

HAS BEENSCANNED

t

NOTE 'TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO-HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEZVED BY, YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

FULL TEXT CONVERSION REQUIRED

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

July 22, 1997

EA 97-288

Carolina Power

& Light Company

ATTN:

Hr .

W. R. Robinson

Vice President

- Harris Plant

Shearon Harris Nuclear Power Plant

P. 0. Box 165, Hail Code:

Zone

1

New Hill, NC

27562-0165

SUBJECT:

EXERCISE OF ENFORCEMENT DISCRETION

Dear

Hr . Robinson:

On June 21,

1997, the

NRC completed

an inspection at Carolina

Power

& Light

Company's

(CP&L) Har ris facility.

The results of that inspection are

documented in NRC Inspection Report 50-400/97-06.

During the inspection,

the

NRC examined the facts

and circumstances

surrounding

CP&L's identification of a design deficiency associated

with

Emergency Diesel Generator

(EDG) protection circuitry.

Specifically, during

a

review associated

with NRC Generic Letter 96-01, Testing of Safety Related

Logic Circuits, your staff determined that during periodic

EDG load testing

situations coincident with a Loss of Offsite Power

(LOOP),

an overcurrent

relay (51V) would not have sensed

an over current condition and tripped the

EDG

feeder breaker.

As a result of this condition, if a

LOOP occurred during

EDG

testing, the 51V relay would not have actuated

and the associated

emergency

sequencer

would not have recognized the

LOOP condition and sequenced

the

safety loads

as required.

The condition was reported to the

NRC on

. December

4.

1996,

and Licensee

Event Report

No.96-023 was submitted

on

December

16,

1996,

and supplemented

on Hay 29,

1997 and June 6, 1997,

describing the outside of design basis condition.

On April 18,

1997,

a

proposed

EDG protection circuitry modification was submitted to the

NRC in

accordance

with 10 CFR 50.59(c)-and

10 CFR 50.90.

On Hay 8, 1997, the

NRC

issued

Amendment

No. 72 to the Harris 'license approving the modification.

Based

on the information developed during the inspection,

the

NRC has

determined that

a violation of NRC requirements

occurred.

Bpeci,fically, since

original plant oper ation, the

EDG protection logic was not designed

as

described in Sections 7.3.1;5.1.and "8.3.1.1.2.14.g of the Harris Final Safety

Analysis Report

(FSAR).

No evaluation

was performed pursuant to 10 CFR 50.59

to determine if the actual configuration constituted .an Unreviewed Safety

Question

(USQ); although after your recent discovery of the condition you did

confirm that

a

USQ existed.

The failure of the

FSAR to accurately reflect the

as-built plant configuration and-the =Vailur e to perform an evaluation in

accordance

with 10 CFR 50.59 constitutes

a violation of regulatory

requirements.

t'l $ lt

9707M0089 970722

PDR

ADOCK 05000400

8

PDR

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

CPSL

In accordance

with the "General

Statement of Policy and Procedures

for

Enforcement Actions" (Enforcement Policy),

NUREG-1600, this violation normally

would be categorized

as

a Severity Level III violation.

However,

as provided

in Section VII.B;3 of the Enforcement Policy, the

NRC may refrain from issuing

a Notice of Violation (Notice)

and proposing

a civil penalty for a Severity

Level III violation which involves

a past problem,

such

as

an old engineering,

design,

or installation deficiency, provided that certain criteria are met.

After review of this violation and in consultation with the Director, Office

of Enforcement,

the

NRC has concluded that while a violation did occur,

enforcement discretion is warranted

and issuance of a Notice is not

appropriate in this case.

The speciAc bases f'r the decision to exercise

enforcement discretion are:

(1) you identified the design discrepancy while

consulting the

FSAR during Generic Letter 96-01 activities;

(2) the issue

was

appropriately reported in accordance

with 10 CFR 50.72 and 50.73;

(3) prompt

actions were taken to declare the

EDGs inoperable

whenever they were

paralleled with the offsite power grid during testing;

(4) design

change

options were thoroughly pursued;

(4) the design

change

was submitted to

NRC in

accordance with 10 CFR 50.59(c)

and 50.90;

(5) the installation and testing of

the modification to the

EDG circuitry were completed

on Hay 26,

1997;

and

(6) the design discrepancy

was not likely to be identified by routine licensee

efforts.

In addition,

based

on NRC's assessment

of the scope

and thoroughness

of your on-going

FSAR review program, it is possible that this would have been

identified regardless

of the Generic Letter review.

This letter closes the apparent violation involving the 51V relay design

.

deficiency identified in the above referenced

inspection report.

No formal

response

regarding this issue is required.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter will be placed in the

NRC Public Document

Room (PDR).

Sincerely,

Docket No.

50-400

License

No. NPF-63

cc:

(See

page 3)

( Original signed by L. Reyes

)

Luis A. Reyes

Regional Administrator

. CP&L

CC:

D. B. Alexander

. Hanager

Performance

Evaluation

and

Regulatory Affairs

OHS7

Carolina

Power

& Light Company

412 S. Wilmington Street

Raleigh,

NC

27601

J.,W.

Donahue

Director of Site Operations

Carolina

Power

& Light Company

S. Harris Nuclear. Power Plant

P. 0. Box 165,

HC:

Zone

1

New Hill, NC

27562-0165

Bo Clark "-

Plant General

Hanager

- Harris Plant

Carolina

Power

& Light Company

Shearon Harris Nuclear

Power Plant

P. 0. Box 165-

New Hill, NC

27562-0165

D. B. Alexander,

Supervisor

Licensing/Regulatory

Programs

Carolina

Power

& Light Company---

Shear on Harris Nuclear.:Power -Plant-

P. 0. Box 165, Hail Zone 1-

New Hill, NC

27562-0165

W. D. Johnson,

Vice President

and Senior Counsel

Carolina

Power

& Light Co;.

P. 0. Box 1551

Raleigh,

NC

27602

Hel Fry, Acting Director

Div. of Radiation Protection

N. C. Dept. of Environment,

Health

& Natural

Resources

3825 Barrett Drive

Raleigh,

NC

27609-7721

Karen E.

Long

Assistant Attorney General

State of North Carolina

P. 0. Box 629

Raleigh,

NC

27602

(cc cont'd

- See

page 4)

P,

l

CPSL

(cc cont'd)

Public Service Commission

State of South Carolina

P. 0.

Box 11649

Columbia,

SC

29211

Chairman of the North Carolina

Utilities Commission

P. 0. Box 29510

Raleigh,

NC

27626-0510

Rober t P. Gruber

Executive Director

Public Staff NCUC

P. 0. Box 29520

Raleigh,

NC

27626

Stewart

Adcock, Chairman

Board of County Commissioners

of Wake County

P. 0. Box 550

.

Raleigh,

NC

27602

-

- ~ Hargaret Bryant Pollard,=- Chairman

Board of County Commissioners

of Chatham County

P. 0. Box 87

Pittsboro,

NC

27312

Distribution:

J.

Lieberman,

OE

OE.EA (BSummers)(2)

H. Shymlock, RII

B. Uryc, RII

J. Coley, RII

R. Baldwin, RII

J.

Lenahan,

RII

W. Rankin, RII

D. Thompson, RII

V. Rooney,

NRR

PUBLIC

(Distribution cont'd

- See

a e 5)

~

~

.itic .

$

~

CPSL

Distribution cont'd:,

NRC Resident

Inspector

U. S. Nuclear Regulatory Commission

5421 Shearon

Har ns

Road

New Hill, NC

- 27562-9998

=-

SIGHATURE

nson

NShyamlock;

JLieberaan

Ur

'Brady~~

DRoberts

07 /

/ 97

07 I I

/ 97

0

id / 97

/

/97

07 / l

/ 97

07 / /7 / 97

COPYT

YES

HO

YES

HO

YES

HO

YE

HO

YES

NO

YES

HO

SIGNATLRE

" HAHE

1

aeDonald

DATE

0

t't I 97

07 /

/ 97

07 /

/ 97

'ES

HO

YES

NO

COPYT

YES

HO

07 I

I 97

"YES

HO

07 I

/ 97

07 I

I 97

YES

HO

YES

HO

l