ML18012A128

From kanterella
Jump to navigation Jump to search
Forwards TS Bases Change for TS 3.2.3,which Incorporates Insp Guidance from NRC Procedure 61706, Core Thermal Power Evaluation
ML18012A128
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/08/1996
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18012A129 List:
References
HNP-96-014, HNP-96-14, NUDOCS 9602130078
Download: ML18012A128 (3)


Text

CATEGORY j.

REGULATOR INFORMATION DISTRIBUTION SFEM (RIDE)

ACCESSION NBR:9602130078 DOC.DATE: 96/02/08 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Docume'nt Control Desk)

SUBJECT:

Forwards TS bases change for TS 3.2.3,which incorporates inspection guidance fom NRC procedure

61706, "Core Thermal Power Evaluation."

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:Application for permit renewal filed.

DOCKET 05000400 05000400 E

Q RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 6

6 1

1 1

1 1

1 1

1 FILE CE DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 NRC PDR RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 17

Carolina Power & Light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant FEB 8 1996 SERIAL: HNP-96-014 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 TECHNICALSPECIFICATION BASES CHANGE - RATED THERMALPOWER Gentlemen:

In accordance with 10 CFR 50.36(a), the Harris Nuclear Plant is proposing to implement a change to the Bases section for Technical Specification (TS) 3.2.3.

The proposed change is submitted in preparation for implementing a continuous calorimetric capability.

This change incorporates the inspection guidance from NRC Inspection Procedure 61706, "Core Thermal Power Evaluation," except that shifts at the Harris Nuclear Plant are 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The attached retyped Bases pages B 3/4 2-5 and B 3/4 2-6 are provided for your information.

Questions regarding this matter may be referred to Mr. T. D. Walt at (919) 362-2711.

Sincerely, Enclosure LSR/lsr c:

Mr. S. D. Ebneter Mr. N. B. Le Mr. D. J. Roberts i 3CCvg 9602i30078 960208 PDR ADOCK 05000400, P

PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.2095

C

~

)

i(

4