ML18012A128
| ML18012A128 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/08/1996 |
| From: | Robinson W CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18012A129 | List: |
| References | |
| HNP-96-014, HNP-96-14, NUDOCS 9602130078 | |
| Download: ML18012A128 (3) | |
Text
CATEGORY j.
REGULATOR INFORMATION DISTRIBUTION SFEM (RIDE)
ACCESSION NBR:9602130078 DOC.DATE: 96/02/08 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Docume'nt Control Desk)
SUBJECT:
Forwards TS bases change for TS 3.2.3,which incorporates inspection guidance fom NRC procedure
- 61706, "Core Thermal Power Evaluation."
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES:Application for permit renewal filed.
DOCKET 05000400 05000400 E
Q RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 6
6 1
1 1
1 1
1 1
1 FILE CE DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 NRC PDR RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 17
Carolina Power & Light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant FEB 8 1996 SERIAL: HNP-96-014 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 TECHNICALSPECIFICATION BASES CHANGE - RATED THERMALPOWER Gentlemen:
In accordance with 10 CFR 50.36(a), the Harris Nuclear Plant is proposing to implement a change to the Bases section for Technical Specification (TS) 3.2.3.
The proposed change is submitted in preparation for implementing a continuous calorimetric capability.
This change incorporates the inspection guidance from NRC Inspection Procedure 61706, "Core Thermal Power Evaluation," except that shifts at the Harris Nuclear Plant are 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
The attached retyped Bases pages B 3/4 2-5 and B 3/4 2-6 are provided for your information.
Questions regarding this matter may be referred to Mr. T. D. Walt at (919) 362-2711.
Sincerely, Enclosure LSR/lsr c:
Mr. S. D. Ebneter Mr. N. B. Le Mr. D. J. Roberts i 3CCvg 9602i30078 960208 PDR ADOCK 05000400, P
PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.2095
C
~
)
i(
4