Text
- ACCELERATED DISRIBUTION DEMONSTR'ION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBRc8803140197 DOC.DATE: 88/02/29 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.
Carolina Power
& Light Co.
WATSON,R.A.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operating rept for Feb 1988.W/880308 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE-TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400 D RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB11B NRR REP/RPB10A G-F'1 EXTERNAL EG &G GROH i M NRC PDR COPIES LTTR ENCL 1
0 1
0 10 10 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EABllE NRR/PMAS/ILRB12 RGN2 LPDR NSIC COPIES LTTR ENCL 5
5 1
1 2
2 1
1 1
1 1
1 1
1 1
1 j
A 8
A TOTAL NUMBER OF COPIES REQUIRED:
LTTR 31 ENCL 29
Carolina Power & Light Company HARRIS NUCLEAR PROJECT PO Box 165 New Hill, North Carolina 27562 MAR 0 8 3988 File Number.'SHF/10-15505 Letter Number:
HO-884011 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.
20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs.'n accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Po~er 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1988.
Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:dtp Enclosure cc.'Dr. J. Nelson Grace (NRC)
Messrs. J.
M. Taylor (NRC)
G. F. Maxwell (NRC-SHNPP)
R.
G. Oehl (DOE)
(
8803i40j97 88022~
PDR ADOCK 05000400 DCD MEM/HO-8840110/1/OS4
r
+
~
v A,
g,',P>> <', RA~
I
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
050-400 Harris Unxt 1
February 1988 Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 100.00 percent Availability Factor for the month of February with a 102.12 percent capacity factor.
There was one load reduction.
Details are provided on the Unit Shutdown and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor and 0 spent fuel bundles in the Harris Unit 1 fuel pool.
MEM/DATAREPa/1/OS4
~ CPy,L-CO Ruh~ DATE e3/e2/88 RUH TINE e9:59:4$
ANT rl:-r~FoRvANCE DA7A SYST~
OPE=RAT X HG DATA F(EPCJF(T I<AI<Rxs uH x r 1
PAGL.
F(pD36-eee OPERATlH(i S)TATLJS DOCKET NO.
0 >e-hee COmPI...ETI:-D BY MARK W.
I-IAI.E TFI I PHONE (9) 9) 36".r-~944 r) 4 A
3.
5 6
7*
8.
UNIT HANE:
HARRIS UN 1 T f(EPC)f(TING PERXOD:
FEBF>LJARY 88 I ICENSED THLRHAL POWER (HWT): 2775 HAYiEPLATE RA7'XHG (GROSS MWE):
950.<)>
DEsXGN El Ec7RxcAL RATXHr. <HLT vwE>: 9ee.e HAX DEPEHDABI. E CAPACITY (GRC)BB NWE): 92e. 0 HAX DEPENDABLE-CAPAClTY (HL=T HME): 86e
~ 0 XF CHANGES)
C)CCUR IH CAPAC3:TY RA7'XNGS)
( ITEMS GIVE REASONS:
I HOTLS I
I There are 157 fuel elements in the I
I reactor vessel and 0 elements in I the spent fuel pools.
I I
I I
I 3
THRLJ 7)
SINCE LAST REPOR7',
<'e.
POWER LEVEL TC)
Ml-IXCH REBTF(ICTED XF AHY
< HET NWE):
NONE REASONS F(3R RESTR 3: CT ION lF ANY: N/A TH3:S MONTH Yf( To DATE CLJHLJL ATIVE (3*
k 4
33.
14 ~
'I 5.
16.
17.
18.
20.
2(.
23 J HouRs IH REpoRrxNG r.r=RxoD HLJHBER C)F I-IOLJRS REACTC)R CRITXCAL GAEA(:TOR RESERVE sHuTDOMH HRs I-IOURB GENERATOR OH LXNE UHlT RESERVE SHUTDOWN HOURS GROSS THERHAL ENERGY GEH.
<HWH)
GROSS ELEC.
ENERGY GEN.
(NMH)
NET ELEC.
ENERGY GENERATED (HMH)
UH IT SERV3:CE FACTOR UNIT AVAXLABILlTYFACTL)R uHIT cAr-. FAc roR (usxHG vDC NET)
UNIT CAP.
FACTOR (LJSIHG DER HET)
UNIT FORCED OUTA(iE RATE S)HUTDOWHB SCHED*
OVER HEXT 6 HOHTHB Refueling Outage, July 30,
- 1988, 7 weeks.
696.00 696. <)0
.eo 696.00
.00 1921643.(e 651539.ee 6$ (266.ee
<ee.ee (ee.ee (e2. t 2 97.58
.00 (TYPE, 1>ATE) hhhe.ee 144e.ee
.00 144e.ee
.Oe 3976825>.86
<35e65<
~ ee 1266889.e0 lee.ee 1 ee. <)e (e2.3e 97.7
.00 AHD DLJRATXQN 7297.00 5889.89
.eo 5763.6e
.ee 3'126971.22 5ei5869.e0 4645738.ee 78.99 78.99 74.03 7e.74
., 8.03 OF EAC:H):
xF sHu'rDowH AT EHD ol=
nl=-r-ORT I-El<I(3D, EsrlxATED DA7E or-srART ur:
UNITS IN TEST STATUS
<PRXOF( To COHHEF>CXAL OPERATION):
FORECAST ACHXEVED INITIAL CRITICALITY XHITIAL ELECTRICITY CQNHERCIAL Ql ERAT ION MEM/DATAREPa/2/OS4
\\
1.$ 6
.CPKL-CO ANT F'ERFOf<HANCE DA1 A BYBTE~
"- RuN DATE esrO2/88 APPe>rX B
AVERAGE DALAI V POWEEVFL
, RUN TIHF~
09:59:38 l<ARR18 UNX1 PAGE I
I<PD39-008 FEBRUARY 1988 DAY hVG.
DALI...Y POWER LFVEL
( HWE-Nl'="T) 8/)3 DOCKET NO. Q50-400 COHPI.
I'=TE-D BY HARK W.
I)ALE TEI...Ef:>iONE (9>9)SS:,.-'9~4 DAY hVG.
1)AXLY POWER lEVEL (HWE-NLT) 898 877 885 879 885 88>
50 877 878 877
.)7 886 879 MEM/DATAREPa/3/OS4