ML18003A877
| ML18003A877 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/01/1983 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| GL-82-33, LAP-83-156, NUDOCS 8306060112 | |
| Download: ML18003A877 (6) | |
Text
REGULATOR'FORMATION DISTRIBUTION I'EM (RIDS)
ACCESSION NBR:8306060112 DOC.DATE: 83/06/01 NOTARIZED:
NO FAGIL:SO-400 Shearon Harris Nuclear Power Plant~
Unit i~ Carolina-AUTH~ NAME AUTHOR AFFILIATION UTLEYrE,Ee Carolina Power 8 Light Co, RECIP ~ NAME RECIPIENT AFFIl IATION DENTONpH ~ RE Office of Nuclear Reactor Regu)ationr Director DOCKET ¹ OSOOOcIOO RECIPIENT ID CODE/NAME NRR/DHFS/PSRB NRR/DL/ORBS NRR/DSI/ICSB NRR/DS I/RAB NRR/
PSONgW F ILES
SUBJECT:
Forwards supplemental info to detailed control room design review summary rept "Human Factors Design Evaluation Rept for Shearon Harris Unit 1 Control Room~."
per Generic Ltr 82-33 'rrata sheets to 821207 rept encl'ISTRIBUTION CODE:
A003S COPIES RECEIVED:LTR ENCL SIZE:,
=TITLE: OR/Licensing Submittal:
Suppl 1 to NUREG 0737(Generic Ltr 82 33)'aTE3:
g~~ '~jP~ @~~
RECIPIENT COPIES COPIES ID CODE/NAME; LTTR ENCL LTTR ENCL NRR LB3 BC 7
7 r
i, INTERNAL: IE/DEPER/EPB 3
3 1
NRR/DL/ORAB 1
1 5
5 NRR/DSI/CPB 1
NRR/DSI/METB 1
1 1
NRR/DSI/RS&
1 1
1 ORBS PAULSONiW 1
1 1
1 RGN2 i
1 EXTERNALS LPDR NSIC 1
1 1
1 NRC PDR NTIS TOTAL NUMBER OF COPIES REQUIRED'TTR 30 ENCL 30
1I
'l I'
~
y
'll tl 1
w'i X
1t e
M E W
W K
'I
'I
0 Carolina Power &LightCompany P. O. Box 1551 ~ Raleigh, N. C. 27602 JUN p] ~983 SERIAL-LAP-83-156 E E. UTLEY Executtve Vlcc Preetdent Power'Supply and Englneerlng 4 Construction Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.
C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.
1 AND 2 DOCKET NOS. 50-400 AND 50-401 DETAILED CONTROL ROOM DESIGN REVIEW
Dear Mr. Denton:
During a meeting with your staff on March 25, 1983, Carolina Power 5 Light Company (CP&L) committed to supply the NRC Staff with additional information to aid in their assessment of the Shearon Harris Nuclear Power Plant Unit No.
1 (SHNPP-1) Detailed Control Room Design Review (DCRDR).
This information which was referenced in our submittal of April 15,
- 1983, on NRC Generic Letter 82-33, was to be submitted by June
- 1983, and contain the following:
l.
A more detailed description of the SHNPP-1 DCRDR methods and procedures, 2.
A description of the review team composition and qualifications, and 3.
A description of resolution of the recommendations in the summary report.
The attached report (Attachment 1) provides this information and satisfies this commitment.
8306060ii2 83060l
~
g h
~
~ ~ ~+~i i ~ '>~
iaA (l
t'io >!)
alp 0
4
Harold R. Denton The SHNPP-2 Control Room will essentially replicate the Unit 1
Control Room.
Thus, this DCRDR is applicable to both units.
Attachment 2 provides errata sheets to the summary report submitted on December 7, 1982 to clarify that submittal.
We trust that this information is responsive to your needs.
If you require any additional information, please contact our staff.
Yours very truly, EEU/pgp (6784JHE)
Attachments E. E. Utley Executive Vice President Power Supply and Engineering 5 Construction CC'r.
N. Prasad Kadambi (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J.
P. O'Reilly (NRC-RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F.
Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)
Dr. J.
H. Carpenter (ASLB)
Mr. J. L. Kelley (ASLB)
fig f
g P
I J
IPP 4
)
'I PI r I'
It/t'r '~t 'g rp I'r V It'I
- It.
t y-(?>>%
It' 5, ')tPP fg
~
I P
\\
P
-I,
~
~
I'
-r I" I, )i rrr J
WP*I I g
- <-'< ~ f.
" 'Ir r
~r
~ f flat
%l'"
t1$ >