Forwards Two Ltrs Re Safe Operation of Facility.Plant Commenced Startup at 5 Am 921024 & as of 8 Am 921026 Was at 50% Power & Holding Pending Repair of Feedwater Pump Drain Valve
ML17349A437
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/26/1992
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Rogers, Selin I, The Chairman
NRC COMMISSION (OCM)
Shared Package
ML17349A438 List:
References
NUDOCS 9210280104
Download: ML17349A437 (2)


Text

~ V

~

~

October 26, 1992 MEMORANDUM FOR:

The Chairman Commissioner Rogers Commissioner Curtiss Commissioner Remick Commissioner de Planque FROM:

SUBJECT:

James H. Taylor.

Executive Director for Operations TURKEY POINT RESTART On Friday, October 23,

1992, I received a letter from Grant Peterson re-affirming "reasonable assurance" for offsite emergency preparedness at Turkey Point.

I subsequently informed Jerry Goldberg, Florida Power and Light Company, of this determination and restated our previous conclusion that Turkey Point Unit 4 could be operated safely.

Both letters are enclosed.

The plant commenced startup at 5 a.m. October 24, 1992 and as of 8 a.m.

October 26 was at 50 percent power and holding pending repair of a feedwater pump drain valve.

Original Signed By+

James M. Tayiol';~

James H. Taylor Executive Director for Operations

Enclosures:

As stated cc:

SECY OGC OCA OPA Distribution:

JHTaylor JHSniezek TEHurley Ebneter EDO rf EJordan PDR OED JBl a

10 6/92 E

JM lor 1

/92

~VOOOi 9210280104 921026.

I I PDR CORNS NRCC CORRESPONDENCE PDR

r' 8

l

~ 'I!