Forwards NRC Evaluation Rept of Independent Mgt Appraisal for Turkey Point Plant, for Info & Action Per 880419 Memo.Forwarding of Subj Rept to Licensee & PDR W/Request for Recommendations Requested
ML17347A811
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/24/1988
From: Jordan E
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17347A812 List:
References
NUDOCS 8807080085
Download: ML17347A811 (4)


Text

~gR REC(p 0

t-

+***~

MEMORANDUM FOR:

FROM:

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 J.

Nelson Grace, Regional Administrator Region II Edward L. Jordan, Director Office for Analysis and Evaluation of Operational Data NRC EVALUATION OF THE FLORIDA POWER AND LIGHT INDEPENDENT MANAGEMENT APPRAISAL PROGRAM Enclosed for your information and action, in accordance with your memorandum to me of April 19, 1988, is the NRC evaluation report of the Independent Management Appraisal for the Turkey Point Power Plant (enclosure 1).

The report discusses the strengths and weaknesses of the IMA appraisal of Turkey Point and FP8L and includes NRC recommendations to FP8 L.

These recommendations, together with the recommendations in the IMA report, provide the appropriate principles from which FP8 L can establish an action plan for effective and lasting improvement at Turkey Point.

Following the completion of your review and any subsequent discussions with NRC senior management, the report should be forwarded to the licensee and the Public Document Room, with a request that the licensee respond to the recommendations in the NRC evaluation report at the same time it responds to the IMA recommendations.

Until these actions are taken the information in the report is considered predecisional.

A draft letter which may be used to transmit the report to the licensee is attached as enclosure 2.

If you have any questions on enclosures 1 or 2 please contact either me (492-4848) or Lee Spessard (492-8577).

dL ~'

Office fo Analysis and Eval uati on of Operational Data

Enclosures:

1.

NRC Evaluation Report of the Independent Management Appraisal for the Turkey Point Power Plant 2.

Draft Letter to Licensee cc w/encls:

V. Stello, EDO J

~ Taylor, DEDRO T.

Rehm, OEDO T. Murley, NRR 8807080085 88Pg2y R

IDQCN- 05000250 PNu

/

f y

'~j,J li gj.'-Q>

J. helson Grace T

T M

J B

TEMurley AEOD R/F ELJordan CJHeltemes DOA R/F RLSpessard DEIIB R/F SDRubin DAllison HBai ley RFreeman ELeeds KWolley RLloyd DSullivan RPerch KHooks GLaines RBernhard, RII RBrewer, RII Distribution (w/encl)

JRoe VStello JPartlow JTayl or BGrimes Rehm GEdison Martin HBerkow Taylor

LReyes, RII Lieberman IShoenfeld Hayes PDR
SRubin
DAl1 1son: HBai1 ey NAME j

~

~

RLS ssard:

C 1 temes:

Jor an OATE: 06/d %88: 06/P/88: 06+/88: 06/g /88: 06/~%88: 06/2Q/88 OFFICIAL RECORD COPY

I

~>OJQ'l t'it)Aji'fi)'i-..4 p

k P,

t