ENCLOSURE 1
NOTICE OF VIOLATION Florida Power and Light Company Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 License Nos.
DPR-31 and DPR-41 The following violations were identified during an inspection conducted on February 24-28, 1986.
The Severity Levels were assigned in accordance with the NRC Enforcement Policy
1.
Technical Specification Section 6.5.2.8.h requires an independent fire protection and loss prevention inspection and audit to be performed annually utilizing either qualified licensee personnel or an outside fire protection firm.
NRC Generic Letter 82-21 describes the general scope of the fire protection audits and identifies the composition and qualifications of the auditors.
Contrary to the
- above, an independent fire protection and loss prevention inspection and audit by qualified licensee personnel or outside fire protection firm has not been performed at Turkey Point since July 1984.
This is a Severity Level V violation (Supplement I).
2.
Technical Specification Section 6.4.2 requires the fire brigade training program to meet the applicable portions of 10 CFR 50 Appendix R.
Technical Specification Section 6.8.1 requires written procedures and administrative policies to be established, implemented and maintained, that meet or exceed the requirements of the fire protection program.
Turkey Point fire protection program procedure AP15500 Section
- 8. 1.3 and 10 CFR 50 Appendix R
Section III.I.3.b require fire brigade drills to be performed at regular intervals not to exceed three months for each shift fire brigade team.
Contrary to the
- above, during 1985 regular fire brigade drills were conducted, but the frequency between eight of the 19 drills conducted exceeded the specified three months maximum time interval.
This is a Severity Level V violation (Supplement I).
3.
Technical Specification Section 4.15.3.a.
1 requires hose stations in the vicinity of safety-related equipment to be demonstrated operable by a
monthly visual inspection of hose station equipment.
Contrary to the
- above, the fire hose stations were not inspected in September 1985 and the time between the August 27 and October 8, 1985 inspection was 42 days.
This exceeded the maximum of 39 days (31 days plus 25Ã) permitted by the Technical Specifications.
This is a Severity Level V violation (Supplement I).
8b052i0027 860401 PDR ADOCK 05000250 PDR
4
~
4 t
4 4
4 4
If fP 4
I 4
I'I 4
t 4
r 4
Ih
Florida Power and Light Company Turkey Point Units 3 5 4 Docket Nos.
50-250 and 50-251 2
License Nos.
DPR-31 and DPR-41 Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Security or safeguards information should be submitted as an enclosure to
. facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.
Date:
/
II P
I