ML17341A511

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/81-08 & 50-251/81-08 on 810626-0725.No Noncompliance Noted
ML17341A511
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/19/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A512 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8109090470
Download: ML17341A511 (4)


See also: IR 05000250/1981008

Text

AUG1 g ]g8t

~

~

~

~

~

1 orida

Power

and Light Company

i..3~~+SXi

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

0

)ello~

~

~~cEtt'h

"

SEP 09 1S8)~

'~4L.Sg~CH'

g

Subject:

Report

Nos

0-250/81-0

and 50-251/81-08

This refers

to the routine safety inspection

conducted

by ter.

A. J.

Ignatonis of

this office on June

26 through July 25, 1981, of activities authorized

by

NRC

License

Nos.

DPR-31 and

DPR-41 for the Turkey Point facility and to the

discussion

of our findings held with t1r. J.

K. Hays at the conclusion of the

inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the

scope of this inspection,

no violations or deviations

were disclosed.

We have examined actions

you have taken with regard to previously identified

nforcement matters.

These

are discussed

in the enclosed

inspection report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed in the

NRC's Public Document

Room.

If the report contains

any information that you believe to

be exempt

from

disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this

office by telephone within ten days

from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days

from the date of this letter

a written application to this office to

withhold such information.

If your receipt of this letter

has

been

delayed

such

that less

than

seven

days

are available for your review, please notify this

office promptly so that

a

new due date

may be established.

Consistent with

section 2.790(b)(l),

such application must

be accompanied

by an affidavit

executed

by the

owner of the information which identifies the document or part

thereof sought to

be withheld, and

a full statement of the reasons

on the basis

of which it is claimed that the information should

be withheld from public

disclosure.

This section further requires

the statement

to address

with

specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall

be incorporated

as far as possible

into a separate

part of the affidavit. If we do not hear from you in this regard within the

specified periods

noted above,

the report will be placed in the Public Document

Room.

~gal

Ci

>

l

810'7090470 8i0819

PDR

ADDCK 05000250

8

PDR

-~r

'

P,g, >>

n

~ g

ll

4

l

~

~

t

N

II

N

ll

I

I

1g

, II

Florida Power

and Light Company

AUGl 9 tgg)

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosure:

Inspection

Report Hos. 50-250/81-08

50-251/81-08

cc w/encl:

J.

K. Hays, Plant Manager

bcc w/encl:

NRC Resident

Inspector

Document

Management

Branch

State of Florida

R.

C. Lewis, Director

Division of Resident

and

Reactor Project Inspection

RI '

RI

AJIgnato is:gr

lJ tars

8)~/81

8/II~81

RII '

I

HDance

8/Ki /81

RI '.

PI

K an is

8/Pl/81

RII: RRP

e log

8//+//81

7

e

8

d

W

a

I