AC CELE RATED D1SI BUNION DEMONSTRION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8904260177 DOC.DATE: 89/04/14 NOTARIZED: NO DOCKET g
FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFILIATION ALEXICH,M.P..
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
Document Control Branch (Document Control Desk)
R
SUBJECT:
Responds to station blackout rule for plants using AC independent station blackout response power.
DISTRIBUTION CODE:
A050D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Station Blackout (USI A-44) 10CFR50.63, MPA A-22 NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME STANG,J COPIES LTTR ENCL 1
1 i'
INTERNAL: NRR PDl-4PM TAM NRR/DEST/PS B NUDOCS-ABSTRACT EXTERNAL: LPDR NSIC 1
1 2
2 1
1 1
1 1
1 NRR/DEST/ESB NRR DEST RSB R
FILE 0
NRC PDR 2
2 1
1 1
1 1
1 R
I NarE 'IO ALL RICS RZCIPZZgZS PLEASE HELP US K) REDUCE WASTE!
CDNZACZ'XHE DOCUMENZ CONTROL DESKS KXM Pl-37 (EXT. 20079)
KO ELIMINATE KXJR MME FKH DISTRIBUTION LISTS H)R DOCtIMEÃIS YOU DGNiT NEED!
D D
S TOTAL NUMBER OF COPIES REQUIRED:
LTTR 13 ENCL 13
1 9~
t0
~
'1 indiana hlicbigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:0537D Donald C.
Cook Nuclear Plant Units 1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 GENERIC RESPONSE TO STATION BLACKOUT RULE FOR PLANTS USING AC INDEPENDENT STATION BLACKOUT RESPONSE POWER U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T.
E. Murley April 14, 1989
Dear Dr. Murley:
On July 21,
- 1988, the Nuclear Regulatory Commission (NRC) amended its regulations in 10 CFR, Part 50.
A new section, 50.63, was added which requires that each light-water-cooled nuclear power plant be able to withstand and recover from a station blackout (SBO) of a specified duration.
Utilities are expected to have the baseline assumptions, analyses and related information used in their coping evaluation available for NRC review. It also identifies the factors that must be considered in specifying the station blackout duration.
Section 50.63 requires that, for the station blackout duration, the plant be capable of maintaining core cooling and appropriate containment integrity.
Section 50.63 further requires that each licensee submit the following information:
1.
A proposed station blackout duration including a justification for the selection based on the redundancy and reliability of the onsite emergency AC power
- sources, the expected frequency of loss of offsite
- power, and the probable time needed to restore offsite power; 2.
A description of the procedures that will be implemented for station blackout events for the duration (as determined in 1 above) and for recovery therefrom; and 3.
A list and proposed schedule for any needed modifications to equipment and associated procedures necessary for the specified SBO duration.
8904260i77 8904i4 r
PDR ADOCK 05000315 P
PDC po
Dr. T.
E. Murley AEP:NRC:0537D The NRC has issued Regulatory guide 1.155 "Station Blackout" which describes a means acceptable to the NRC Staff for meeting the requirements of 10 CFR 50.63.
Regulatory Guide (RG) 1.155 states that the NRC Staff has determined that NUMARC 87-00 "Guidelines and Technical Bases for NUMARC Initiatives Addressing Station Blackout At Light Water Reactors" also provides guidance that is in large part identical to the RG 1.155 guidance and is acceptable to the NRC staff for meeting these requirements.
Table 1 to RG 1.155 provides a cross-reference between RG 1.155 and NUMARC 87-00 and notes where the RG takes precedence.
Indiana Michigan Power has evaluated the Cook Nuclear Plant, Units 1 and 2, against the requirements of the SBO rule using guidance from NUMARC 87-00 except where RG 1.155 takes precedence.
The results of this evaluation are detailed below.
A.
Pro osed Station Blackout Duration NUMARC 87-00, Section 3 was used to determine a proposed SBO duration of four hours.
No modifications were required to attain this proposed coping duration category.
The following plant factors were identified in determining the proposed station blackout duration:
1.
AC Power Design Characteristic Group is P2 based on:
a.
Expected frequency of grid-related loss-of-offsite-power events (LOOPs)
- does not exceed once per 20 years; b.
Estimated frequency of LOOPs due to extremely severe weather (ESW) places the plant in ESW Group 2; c.
Estimated frequency of LOOPs due to severe weather (SW) places the plant in SW Group 2; d.
The offsite power system is in the Group Il/2.
2.
The emergency AC power configuration group is "C" based on:
a.
There are two emergency AC power supplies per unit not credited as alternate AC power sources; b.
One emergency AC power supply per unit is necessary to operate safe shutdown equipment following a loss of offsite power.
Dr. T.
E. Murley AEP:NRC:0537D 3.
The target emergency diesel generator (EDG) reliability is 0.975.
A target EDG reliability of 0.975 was selected based on having a nuclear unit average EDG reliability for the last 20 demands greater than 0'0 consistent with NUMARC 87-00, Section 3.2.4.
B.
Procedure Descri tion Plant procedures have been reviewed and, where necessary, will be modified by July 31,
- 1989, to meet the guidelines in NUMARC 87-00, Section 4 in the following areas:
Station blackout response per NUMARC 87-00, Section 4.2.1; AC power restoration per NUMARC 87-00, Section 4.2.2; Severe weather per NUMARC 87-00, Section 4.2.3; Procedures reviewed and/or revised are listed below:
1,2-0HP 4023.ECA-O.O Loss of All AC Power;*
1,2-0HP 4023.001.020
Response
to Loss of Offsite Power to Both Units and Any One Diesel Starts; OHI-4011 Conduct of Operations (Shift Staffing);
1,2-0HP 4021.056.002 Operation of Auxiliary Feedwater System During Startup and Shutdown; 1,2-0HP 4030.STP.017T Turbine Driven Auxiliary Feedwater System Test; 1,2-0HP 4022.055.003 Loss of Condensate to Auxiliary Feedwater Pumps; 1-OHP 4030.STP.039 Security Diesel Generator Operability Test; 1,2-0HP 4023.001.001 Remote Shutdown Procedures; OHI-5030 Preventive Maintenance; 1,2-0HP 4023.001.006 Loss of Control Air; 1,2-0HP 4023.ECA-0.1 Without SI Required; Loss of All AC Power Recovery 1,2-0HP 4023.ECA-0.2 With SI Required; Loss of All AC Power Recovery
Dr. T.
E. Murley AEP:NRC:0537D o
PMP 2080.EPP.111 Natural Emergency Guidelines; o
PMI 4010 Plant Operations Policy;*
o Load Restoration
- August, 1988.
o 1,2-0HP 4030.STP.043 Safety Related Manual Valve Cycling;*
o 1-THP 6030.
IMP.146 (.246 for Unit 2)
Emergency Plant Shutdown and Cooldown Indication Local Shutdown Indication o
1-THP 6030.IMP.327
(.427 for Unit 2)
Steam Generator Atmosphere Steam Relief Control Calibration/Alignment
- Procedures requiring modification.
C.
Pro osed Modifications and Schedule The ability of Cook Nuclear Plant, Units 1 and 2, to cope with a station blackout for four hours in accordance with NUMARC 87-00, Section 3.2.5 and as determined in Section "A" above; was assessed using NUMARC 87-00, Section 7 with the following results:
Condensate Inventor For Deca Heat Removal Section
~7. 2. 1 It has been determined from Section 7.2.1 of NUMARC 87-00 that approximately 90,000 gallons of water per unit are required for decay heat removal, as well as for primary/secondary side pressure reduction, for the four hour blackout event.
The minimum permissible condensate storage tank level per technical specifications provides 175,000 gallons of water per unit, which exceeds the required quantity for coping with a four-hour station blackout.
Class 1E Batter ies Ca acit Section 7.2.2 The Class 1E batteries were determined to be inadequate to meet station blackout loads for four hours.
The following procedure change is necessary to provide a
four-hour capacity:
various loads not required to mitigate the station blackout event will be stripped.
These loads will be identified in plant procedures'.
Com ressed Air Section 7.2.3 Procedure changes are necessary to ensure that air-operated valves required for decay heat removal
Dr. T.
ED Murley AEP:NRC:0537D during a station blackout of a four-hour duration have sufficient backup sources for operation or will be manually operated.
Valves requiring manual operation or that need backup sources (i.e.,
steam generator power-operated relief valves) for operation will be identified in plant procedures.
4.
Effects of Loss of Ventilation Section 7.2.4 The calculated steady state ambient air temperature for the steam driven auxiliary feedwater pump room (the dominant area of concern for a PWR) during a station 0
blackout induced loss of ventilation is 133.6 F.
The assumption in NUMARC 87-00, Section 2'.1 that the control room will not exceed 120 F during the station 0
blackout has been assessed.
The control room at Cook Nuclear Plant, Units 1 and 2, does not exceed 120 F during a station blackout.
0 Therefore, the control room is not a dominant area of concern.
Reasonable assurance of the operability of station blackout response equipment in the above dominant area(s) of concern has been assessed using Appendix F to NUMARC 87-00 and/or the NUMARC 87-00 Topical Report.
No modifications or associated procedures are required to provide reasonable assurance for equipment operability.
Containment Isolation Section 7.2.5 The plant list of containment isolation valves has been reviewed to verify that valves which must be capable of being closed or that must be operated (cycled) under station blackout conditions can be positioned (with indication) independent of the preferred and blacked-out unit s Class 1E power supplies.
No plant modifications and/or associated procedure changes were determined to be required to ensure that appropriate containment integrity can be provided under SBO conditions.
6.
Reactor Coolant Inventor Section 2.5 The ability to maintain adequate reactor coolant system inventory to ensure that the core is cooled has been assessed for four hours.
A plant-specific analysis was used for this assessment.
The expected rates of reactor coolant inventory loss under SBO conditions do not result in core uncovery in a SBO of four hours.
Therefore, makeup systems in addition to those currently
Dr. T.
E. Murley AEP'NRC:0537D available under SBO conditions are not required to maintain core cooling under natural circulation (including reflux boiling).
The procedure changes identified in Parts A,
B and C above will be completed by July 31, 1989.
The framework for this response letter was generically prepared by NUMARC and was concurred with by the NRC staff.
Plant specific parameters were provided where needed and paragraphs selected as they applied to Cook Nuclear Plant from the generic response.
format.
NRC staff concurrence for the framework was provided in an October 7, 1988, letter from Mr. A. S. Thadani, Assistant Director for Systems, Nuclear Reactor Regulation, to Mr. W. H.
Rasin of NUMARC.
This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, P. Al ich Vice President ldp cc:
D. H. Williams, Jr.
W.
G. Smith, Jr.
- Bridgman R.
C. Callen G. Charnoff A. B. Davis NRC Resident Inspector
- Bridgman G. Bruchmann