QQ+

REGULAT INFORMATION DISTRIBUTIO YSTEM DOCKET NBR:

50-316 COOK 2 DOC DATE, 781128 RECIPIENT:

KEPPLER, J.G.

ACCESSION NBR:

ORIGINATOR:

COMPANY NAME:

SUBJECT:

COPIES RECEIVED:

LTR ENCL SIZE:

o rm 781128 verbal re t.

While investi atin cause of water comin from u er nment ra header 2 lower containment s ra

. check valves were found installed ckwards.

Re t will be submitted 781212.

DISTRIBUTION CODE t jL002 DISTRIBUTIO~ TITLEi INCIDENT REPORTS NOTARIZED BR RESR~nR I

iNI PC I

8 C

SYSTEMS RR NOVA~iCHFCV EEB AD FOR ENG PLANT SYSTEMS BR HANAUFR 40 FOR PLANT SYSTEHS AD FOR SYS A

PRQJ REACTOR SAFFTY BR

, ENGINEERING BR KREGER/J ~

COLLINS POWER SYS BR E. Jordan LPDR NSIC ACRS w/u ENCL w/ENCL w/ENCL 9/2 ENCL W/3 ENCL

>/FNCL W/ENCL w/ENCL w/ENCL w/FNCL w/ENCL w/ENCL W/ENCL w/FNCL w/ENCL W/ENCL w/ENCL.

w/ENCL w/ENCL w/16 ENCL FOR ACTION

~

ORBf/1 BC Q Q~

TOTAL NUHBER UF COPIES REQUIRED t LTR ENCL NOTES-SENf) 3 CYS OF ALL MATERTAL TO I 6 E.

o Q~loctr4o INDIANA8 MICHIGANPON'E8 COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 November 28, 1978 Mr. J.

G, Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Operating License DPR-74 Docket No. 50-316 This is to confirm our verbal report to NRC Region III Inspector, Mr.

K.

R. Baker, at 1005 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.824025e-4 months <br /> on November 28, 1978.

At that time we reported that while investigating the cause of water coming from the upper containment spray header we identified two lower containment spray check valves which had been installed back-wards.

A followup report will be submitted by December 1:2, 1978.as-required by Technical Specifications Section 6.9.1.8.

Sincerely, D. V. Shal 1 er Plant Manager DVS/ Jas P

F0ULPTOAy 00'(F (

cc:

J.

R.

R.

R.

R.

K.

R.

P.

R.

G.

E.

Dolan W. Jurgensen F. Kroeger

'Kilburn J. Vollen BPI R. Baker RO:III C. Callen MPSC W. Steketee, Esq.