ML17317A705
| ML17317A705 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/30/1978 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | |
| References | |
| NUDOCS 7811020252 | |
| Download: ML17317A705 (6) | |
Text
1 REGULATO INFORMATION DISTRIBUTION STEM DOCKET NBR:
RECIPIENT: Keppler, J.G.
ORIGINATOR:Shaller, D.V.
COMPANY:" 'IN 'a'Ml'Pwr'
'UBJECT:
On 781030, it became necessary to DOC DATE: 781030 ACCESSION NBR:
7811020252 COPIES RECEIVED:
LTR ENCL 0
SIZE:
1 isolate deluge valves to facil Drumming Room 6 New Fuels Receiving Area as result of repair on Five Sys headers.
Follow up rept will be issued 781510.
OISTRyRUTION CODE t Ano I "DISTRIBUTION TITLEj GFMERAL DISTRISUTION FOR AFTER ISSUANCE NOTARIZEDF OPFRATING LICENSE, R G~
NRC PAR I
8 E
~ GELD
'ANAUER
,'ORE PFRFDRNANCE RR AD FOR SYS L PROJ ENGINFERING BR REACTAR SAFFTY BR PLANT SYSTEMS BR EER EFFLUENT TREAT SYS J
- HCGnUGH, LPDR TERA
, NSIC ACRS ENCL'/7 ENCL W/ENCL w/ENcL w/g ENCL
- l. TR AN( Y w/ENCL w/ENCL w/ENCL W/ENCL W/ENCL W/ENCL W/ENCL W/ENCL w/ENCL W/ENCL w/ENCL W/ENCL w/16 ENCl l
FOR
~ ORBgl ACTION BC TOTAl.
NUMBER OF. COPIES REQUIRED I LTR ENCL-40 39 NOTES:
I s E 3 cys all material.
fe C'g t
l I
Mmerioen G "*i~~MIAl/AaJvVCtlLGAPJHOR'Ell CONPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49100 October 30, 1978 Mr. J.G.
- Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58/DPR-74 Docket Nos.
50-315/50-316
Dear Mr. Keppler:
This is to confirm our verbal report to NRC Region III Inspector, Hr.
K.R. Baker, at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> on October 30, 1978.
At that time vie reported that due to a repair on our Fire System headers it became necessary to isolate the deluge valves to the Plant's Drumming Room and Nevi Fuel Receiving Area.
This report is being made in compliance with the ACTION statement of Fire Suppression Technical Speci fication Sections
- 3. 7. 9. 1 and 3. 7. 9. 2.
A followup report will be submitted by November 10,
- 1978, as required by Technical Specification
- 6. 9.2.
Sincerely,
.D.V: Shaller Plant Manager
/bab
. cc:
J.E.
Dolan R.W. Jurgensen R.F.
Kroeger R. Kilburn R.J. Vollen BPI K.R. Baker RO:III R.C. Callen MPSC P.W. Steketee, Esq.
KQlLNMPfllgI<gpgI: ~gp~i R.
Wal sh, Esq.
G. Charnoff, Esq.
G.
Olson J.M.
Henni gan PNSRC J.F. Stietzel Dir IE (40 cooies)
Dir.,
MIPC (4 copies)
4
DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 October 30, 1978 Mr. J.G.
- Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear R'egulatory Coilnission" Region III 799 Roosevelt Road Glen Ellyn, IL 60137
, Operating License DPR-58/DPR-74 Docket Nos.
50-315/50-316
Dear Mr. Keppler:
This is to confirm our verbal report to NRC Region III Inspector, Mr. K.R. Baker, at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> on October 30, 1978.
At that time we reported that due to a repai r on our Fire System headers it became necessary to isolate the deluge valves to the Plant's Drumming Room and New Fuel Receiving Area.
This report is being made in compliance with the ACTION statement of Fire Suppression Technical Specification Sections
- 3. 7. 9. 1 and 3. 7. 9. 2 ~
A followup report will be submitted by November 10,
- 1978, as required by Technical Specification
- 6. 9.2.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E.
Dolan R.W. Jurgensen REF.
Kroeger R. Kilburn R.J. Vollen BPI K.R. Baker RO:III R.C. Callen MPSC P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
G.
Olson J.M.
Henni gan PNSRC J.F.. Stietzel
, Dir., IE (40 copies)
Dir., MIPC (4 copies)
'u
'f
\\