ML17306B421

From kanterella
Jump to navigation Jump to search
Fowards Updated Operations QA Plan
ML17306B421
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/27/1993
From: Conway W, James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17306B422 List:
References
102-02488-WFC-G, 102-2488-WFC-G, NUDOCS 9305040183
Download: ML17306B421 (6)


Text

~ccax.za~r.,o oocvMZXYa~Sr

~aurj.Ow Svsrezvr REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

" ACCESSION NBR:9305040183 DOC.DATE: 93/04/27 NOTARIZED: YES DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona'ubli 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINEFJ.M.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION I

Document Control Branch (Document Control Desk)

L

SUBJECT:

Fowards updated "Operations Qa Plan."

DISTRIBUTION CODE:

Q004D COPIES RECEIVED:LTR ENCL I SIZE: g + j ! ~

TITLE: QA Topical Report,

Change, Amendment, or Correspondence (Docket Utili /

NOTES:STANDARDIZED PLANT 05000528 Standardized plant.

05000529 Standardized plant.

05000530 D

RECIPIENT ID CODE/NAME TRAMMELLFC INTERNAL: ACRS OC/LFMB RGN5 FILE EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL 1

1 8

8 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME TRAN,L NR~RJ3 RPEB RQ~~E 01 IHS COPIES LTTR ENCL 1

1 1

1 2

2 1

1 A

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRII3UTION LISTS FOR DOCUMENTS YOU DON'T NEED!

'L TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 18

4 fl I

N

Arizona Public Service Company P,O. BOX 53999

~

PHOENIX, ARIZONA85072-3999 10 CFR 50.54(a)(3)

WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-02488-WFC/GAM April 27, 1993 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Updated Operations Quality Assurance Plan File: 93-005-419.05 Pursuant to 10 CFR 50.54(a)(3), Arizona Public Service Company is submitting changes to the PVNGS Operations Quality Assurance Plan.

These changes do not reduce commitments previously accepted by the NRC.

The previously submitted Operations Quality Assurance Plan should be replaced with the enclosed submittal.

The revised pages are identified as Amendment 1 of the Plan.

Ifyou have any questions or require additional information, please call Thomas R. Bradish at (602) 393-5421.

Sincerely, WFC/GAM/rv Enclosure cc:

J. B. Martin J. A. Sloan 030085

@305040~~

05QQQ528 3 cyg0427 pDR

>D PDR P

IO(

I

(

~ 0

STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA )

I, J. M. Levine, represent that I am Vice President, Nuclear Production, that the transmittal of the enclosed amendment to the Palo Verde Nuclear Generating Station Operations Quality Assurance Plan (OQAP) has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I am familiar with the content thereof, and that to the best of my knowledge and belief, the information accurately presents changes made since the previous OQAP submittal necessary to reflect information and analysis submitted to the Commission or prepared pursuant to Commission requirements.

J. M. Levine S

T B f M

Thi ~/0 yQf~t2&,1993.

N. tary Public My Commission Expires M, Commis<!Dn Exjiros Ap(i!1, $9N

C rr 1

A j

S