ML17297B545
| ML17297B545 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/01/1982 |
| From: | Woods T ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Engelken R, Tedesco R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17297B546 | List: |
| References | |
| ANPP-21063-CTL, NUDOCS 8206080229 | |
| Download: ML17297B545 (6) | |
Text
REGULA Y INFORMATION DISTRIBUTI
.SYSTEM.(<RIDS)
<<AOCE'SSION NBR:8206080229.
DOC ~ PATE 82/06/01 NOTARIZED: NO, DOCKET '-0
- FACILE,STN>>.SO 528 'Palo Verde Nuclear Station~
Uniit ii Ar izona!Publ-i OSOOOS28
'STN50>>529 'Palo Verde Nuclear Station~
Uni~t '2i 'Ar'izona 'Publi 05000529
,'STN 50-530 'Palo Verde Nuclear 'Station~
UniIt 13~
Ar'Ozone 'Publi 05000530
'AUTH NAMg
'ALJTHOR AFFILIATION NOODSg T "G ~
Arizona tPubl'ic.'Service Co ~
'REC IP ~ NAME, RECIPIENT AFFILIATION
.TEDESCOiR ~ LE
'Assistan't Director =for Licensing ENGEL'KEN~'R ~ 'egion Si Office of Director=
<<SUBJEGT: 'Forwards operations or gani1zational'chapt
-L conpor ate QA dept organization charter eflectin'g changes in lQA angani1zation str uctur e.
.DISTRIBUTION CODE: tS0010 iCOPIES iRECEIVED:L'TR,, <<ENCL.j SiZE:,.~
TITTLE: PSAR/FSAR'AMDTS.and Related.Correspondence NOTES Standardized plant ~
<<Standardized
<<plant
~
'Standardized:plant
~
05000528 05000529
~05000530 RBO IP IENT KAID CODE/NAME A/D LICENSNG LIC BR ¹3 LA INTE R N A L" ~
LD/ H D S 3 XE/DEP EPDS "35 MPA NRR/DE/EQB 13
'NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB "24
'RR/DHFS/HFEBQO NRR/DHFS/OLB <<34 NRR/DS I/AEB
'26 NRR/DS I/CP8 10 NRR/DSI/ETSB<<12 NRR/DSI/PSB 19
,NRR
~
RSB "23 F ILE 04
.EXTERNAL: ACRS
<<FEMA 'REP,DIV I39
.NRC.PDR 02
.NT I' lCOPIES L'T'ltR ENCL
,1
~ 0
<<0 1<<
.0 1-1 1
- 0 03
>3 2
'2 1
1 1
1
.1 1
1
~ 1 1
.1 1,
1 1
1 1
1 1
1
~ 1 10 1'0
~ 1 1
1
-1 1
1 RECIPIENT ID 'CODE/KAME LI'C "BR ¹3 'BC LI'CITRATE~
01
.IE;F ILE'E/DEP/EPL'8 "36'RR/DE/CEB11 NRR/DE/GB 28 NRR/DE/MEB
.18 NRR/DE/QAB 21 NRR/DE/SEB 2g NRR/DHFS/L'QB "32 NRR/DHPS/1PTR820
'-NRR/DS I/ASB
'27 NRR/DSI/iCSB 09 NRR/DS I/I1CSB 1'6 NRR/DS I/RAB
'2P.
NRR/DST/L'GB
<<33 RGNS
'BNL (AMDT'S.ONL'Y)
LPDR 03 NSI:C 05
.tCOPIES
- .LT1TR ENCL 1
.0 1
1
,1,1
>3
'3 1
1 "2
2
.1
~ 1
,1
~ 1 1
,i,i
<<1 1
,.1 1
.1
~ 1 1
~ 1
.1
~ 1
'2
'2 1
1 1
1
~ 1 jTQTAL.NUMBER OF COPIES IREQUIRED>>
UTTER
'57 "ENCL
!52
I
'l Ck
~
l t
II
p IFIUIHKBCl P. O. BOX 21666 CKCUVFXBt QK4HMHW PHOENIX, ARIZONA 85036 THOMAS G. WOODS, JR.
EXECUTIVEVICE PRESIDENT CHIEF OPERATING OFFICER June 1,
1982 ANPP-21063"CTL/BSK m!L MAIS OSQ OO CLIO NLD O
AIR AIO OQ IA OC Oo'IGI RIG.cC Nr.
R. L. Ted esco Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Mr. R.
Enge 1 ken Regional Administrator Region V
U.
S. Nuclear Regulatory Commission Creekside Oaks Office Park 1450 Maria Lane -.Suite 210 Walnut Creek, California 94596-5368
Subject:
Gentlemen:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3
Docket Nos.
STN-50-528/529/530 File:
82-056-026; G.1.10 This letter is to inform you of a major realigning of the APS quality
'assurance organizational structure.
The APS Corporate Quality Assurance
- Manager, previously under the direction of the Vice President, Nuclear Projects Management, now reports directly the Operations Executive Vice President and Chief Operating Officer.
The PVNGS Operations Quality Assurance
- Manager, previously under the direction of the Manager of Nuclear Operations, now reports directly to the Corporate Quality Assurance Manager.
The Corporate Quality Assurance Department is now responsible for establish-ing and implementing all quality assurance/quality control programs company-wide.
This organizational realignment further emphasizes APS commitment to total independence of the quality assurance function.
Attachments 1
and 2 show the reporting relationship of the Corporate Quality Assurance Manager and the organizational structure of the Corporate Quality Assurance Department resulting from the realignment.
The quality assurance organizational structure shown in the PVNGS FSAR will be updated, to re-flect this realignment, in a future admendment.
Sincerely, TGWJr:dw Attachments cc:
See Attached Page 2
po>~
~
I 4
J I
~,
Z-
) \\
>t m
~
~
ARIZONA PU8LIC SERVICE COMPANY U.
S. Nuclear Regulatory Commission Attention:
Mr.
R. L. Tedesco; Mr. R. Engelken ANPP-21063-CTL/BSK
'June 1,
1982 Page Two CC:
Richard Deyoung, Director Office of Inspection and Enforcement U.
S. Nuclear Regulatory Commission Wa'shington, D.
C.
20555 J.
A.
D.
B.
G.
C.
A.
C.
B. S.
W.
E.
J.
Vo J.
A.
A. C.
W. J.
W.
G.
R. L.
R.
W.
R.
M.
,D.
R.
L. E.
G. A.
Roedel Fasnacht Andognini Rogers Kap1 an tide rees Brand Gehr S tubb1 ef i e id Bingham Patterson Welcher Grant Hawkinson Vorderbrueggen Fiorel 1 i Lynne Bernabei, Esquire Hamon 8 Weiss 1725 "I" Street, NW Suite 506 Washington, D. C.. 20006 R. L. Greenfield Assistant Attorney Genera'I Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. W.
P.
Haass
- Chief, QA Branch U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555