ML17297A521

From kanterella
Jump to navigation Jump to search
Forwards NUREG-0612,Section 2.1,General Requirements for Overhead Handling Sys, Response to Generic Ltr 81-07
ML17297A521
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/25/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17297A522 List:
References
RTR-NUREG-0612, RTR-NUREG-612 ANPP-18281-JMA, GL-81-07, GL-81-7, NUDOCS 8106300462
Download: ML17297A521 (8)


Text

f,i REGULATOR INFORMATION DISTRIBUTION OSIER (RIBS)

ACCESSION NBR:8106300462!

DOC ~ DATE: 81/06/25 NOTARIZED: YES DOC FACILI;STN-50-528 Palo Verde Nuclear StationR Unit 1~ Ar)zona Publi 0

STN 50-529 Palo Verde Nuclear Station~

Unit 2i Ar)zona Publi

. 05000529 STN-50-530 Palo Verde Nuclear Stations Unit 3R Arizona Publi 05000530 AUTH;NAME AUTHOR AFFILIATION VAN BRUNTiE>.E, Arizona Public Service Co ~

REC IP ~ NAME RECIPIENT AFFILIATION Office. of Nuclear Reactor Regulation~

DirectorI

SUBJECT:

- Forwards "NUREG-0612~Section 2, 1RGeneral Requirements for:

Over head Handling Sysi" response to Generic Ltr 81 07 '

DISTRIBUT'I N CODE:

B030S COPIES RECEIVED:L~TR g." ENCL $

SIZEe: '

TITLE: Control of Heavy loads Near Spent Fuel (USIiA-3b) PRE-OLt NOTES;Standardized Plant F 1 cy:C Grimes Standardized Plant.i cy.'C Grimes Standardized Plant.

1 cy,:C Grimes 05000528 05000529 05000530 ACTION RECIPIENT ID CODE/NAME>

A/D LICENSNG CLEMENSONFF ~

04 KERRIGANR J ~

COPIES LTTR ENCL 1

0 1-1 RECIPIENT'D CODE'/NAME LIC'R 03-BC L'IC BR P3 LA

.COPIES LTTR ENCL 1

0 1

0, INTERNAL~

ACCID EVAL" BR26 CHEM ENG BR 11 CORE PERP BR 10 EMRG PRP DEV 35 EQUIP QUAL BR13~

GEOSCIENCES 28 HYD/GEO BR 30 I8El 06'IC QUAL BR 32 MECH ENG BR 18 NRC" PDR-02'-.

OP LIC BR 34 PRo C/TST REV 20 RAD S

BR22' F I-LE 01 BR 24 1

1 1

1 1

1

~

1 3

3 1

1 2

2 3

3.

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR1?

EMRG PRP LIC 36 FEMA REP DIV 39 HUM FACT ENG 40 I8C SYS BR 16IC GUID BR 33 MATL ENG BR 17

'" MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 REQUA"RGB STRUCT ENG BR25 1

1 1

1 1

1 3

3-1 1

1 1

1 1

1 1

1

~

1 1

0.

1 0

'1-1 1

1 1

1 1

'1 1

EXTERNALA ACRS NSIC 4105'6 16 1

1 LPDR 03 1

1 egg 1g@

M TOTAL NUMBER OF COPIES REQUIRED:" LiTTR ~

ENCL

I 8

l'

\\

t

~

.I 0 ~l

'l 4

p J

'f Y

l

a es p

ommollm ~m mm P. 0 BOX 2I666

'HOENIXs ARIZONA 65036 June,25, 1981 ANPP-18281 JMA/WFQ Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Palo Verde Nuclear Generating Station Units 1, 2

& 3 Dockets Nos.

STN 50-528/529/530

References:

~

~<5. ~h'=.

JUN s 988~

II ~ IEIguAIIR'E~

.Q COI6hI ISS UE 1)

Letter from D.

Eisenhut, NRC, to All L~ifNsP's o

Operating Plants

& Applicants for Operating Licensees

& Holders of Construction

Permits, dated December 22, 1980,

Subject:

Control of Heavy Loads 2)

Letter from D.

Eisenhut, NRC, to All Licensees of Operating Plants

& Applicants for Operating Licenses Holders of Construction

Permits, dated February 3,
1981,

Subject:

Control of Heavy Loads (Generic Letter 81-07)

Dear Sir:

References (1) and (2) requested that all "licensees of operating plants and applicants for operating licenses and holders of construction permits revie~ their facilities for control of the handling of heavy loads to determine the extent to which the, guidelines of NUREG-0612 are presently satisfied or will be satisfied before Operating License date.

Page Two of Reference (1) requires operating reactor licensees to provide the information requested in items 1

and 2 of that page which entails:

1.

Submit a

report documenting the results of your review and the required changes and modifications.

This report should include the information identified in Sections 2.1 through 2.4 of Enclosure 31 on how the guidelines of NUREG-0612 will be satisfied.

This report should be submitted in two parts according to the following schedule:

Submit the Section 2.1 information within six months from the

( (

date of this letter.

Submit the Sections 2.2, 2.3 and 2.4 information within nine months.

2.

Furnish confirmation within six months that implementation of tho'se changes and modifications you find are necessary will commence a'

so'on'"as possible without waiting on, staff review, so that all such

changes, beyond the above interim actions, will be completed within two years of submittal of Section 2.4 for the above report.

s,'r06300q~

~'

Director of Nuclear Reactor Regulation ANPP-1828l - JMA/WFQ Page Two In addition Reference (1) mentioned that applicants for operating licenses are expected to provide the information requested by item 1

above and to meet the same schedule of implementation as indicated in item 2 above.

A copy of the Arizona Public Service Company report on the Control of Heavy Loads at the Palo Verde Nuclear Generating

Station, Section 2.1 "General Requirements for Overhead Handling Systems" is enclosed for your review.

Our report on Sections 2.2.,

2.3 and 2.4 will be transmitted to you in September, 1981 as previously discussed in the PVNGS Auxiliary Systems Independent Design Review held on April 8, 1981.

If your staff has any questions regarding this submittal, we believe such questions should be raised promptly so that such concerns can be closed out quickly and may be considered in preparing our September submittal.

Sincerely, E. E.

Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVB/WFQ/wp Attachment cc: J. Kerrigan (4 copies of attachment)

P. Hourihan (w/o attachment)

B. Myerson, Esq.

(w/attachment)

~

'a I

C 1

l

)

Director of Nuclear Reactor Regulation ANPP-18281

-Jm/WPq Page Three STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA)

I, Edwin E.

Van Brunt, Jr.,

represent that I am Vice President, Nuclear Projects of Arizona Public Service

Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its
contents, and that to the best of my knowledge and belief, the statements made therein are true.

did U Edwin E.

Van Brunt, Jr.

Sworn to before me this~5day of t Q/V'e, 981.

t ry

."="- '-Hy"-Go~ission Expires:

eswehh+

Q J'otary Public

r J'

IP5 C

I Ep

, 1g+

II P,i P"