Forwards Notice of Denial of Application for Amend to License NPF-21,revising Tech Spec Tables 3.3.7.5-1 & 4.3.7.5-1 Re Accident Monitoring.Decision Based on Util Re Difficulty to Qualify Neutron Monitoring Sys
ML17285A479
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/17/1989
From: Samworth R
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17285A481 List:
References
TAC-63934, NUDOCS 8905300222
Download: ML17285A479 (5)


Text

~g REgy, (4

Np0 Cy o

C O

I Cy Docf44 lfo. 50-397 t

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 17, 1989 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Sorensen:

SUBJECT:

WASHINGTON NUCLEAR POWER PLANT UNIT 2 - DENIAL OF AMENDMENT REQUEST (TAC NO. 63934)

By letter dated November 18, 1986 (G02-86-1027) you submitted an amendment request to revise technical specification Tables 3.3.7.5-1, "Accident Monitoring Instrumentation,"

and 4.3.7.5-1, "Accident Monitoring Surveillance Requirements."

This request was submitted in anticipation of your satisfac-tion of License Condition 16, Attachment 2, Item 3b to the WNP-2 Operating License.

This license condition requires that you "...shall implement

( installation or upgrade) requirements of Regulatory Guide 1.97, Revision 2, for flux monitoring.." by a specified time.

At the time of the amendment application you were in the process of procuring equipment to meet the specified schedule and satisfy the license condition.

By letter dated March 10, 1987 (G02-87-080) you advised that you were unsuccess-ful in your attempt to qualify environmentally the neutron monitoring system.

By letter dated March 31, 1987 (G02-87-01017) you asked us to hold your November 18, 1986 amendment request in abeyance.

Since you are still having difficulty with the environmental qualification of the neutron monitoring system, your r'equest for the license amendment is denied.

Because the implementation of the requirements for flux monitoring is a license condition, you should r esubmit the amendment application in a timely manner upon successful completion of the environmental qualification.

8905300222 890517 PDR ADCICK 05000397 P

PDC yI Ol

Nr. G.

C. Sorensen denied.

Because the implementation of the requirements for flux monitoring is a license condition, you should resubmit the amendment application in a timely manner upon successful completion of the environmental qualification.

A copy of the Notice of Denial of Application for Amendment to be published in the Federal

~Re ister 1s enclosed for your

$ nformat$ on.

Sincerely,

/s/

Enclosure:

As stated Robert B. Samworth, Senior Project Hanager

,Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Projects cc w/enclosures:

See next page DISTRIBUTION NRC 8

LPDRs PD5 Reading MVirgilio JLee RSamworth OGC DHagan EJordan BGrimes TNeek (4)

Manda Jones EButcher ACRS (10)

GPA/PA ARM/LFt)B Region V (4)

  • Previously conc'ed S /PD5 5/

89 RSP/PD5*

RSamworth:dr 5/15/89 DRSP/D:PD5 GWKni'ghton 5/

/89 OFFICIAL RECORD COPY

~

~

I r)

"{

)

>>&,iit

)<<>>

Ii ',

W.Z>><<))

~,I

(("It j

i

) t, I{I<<<<<< II ll

>>){(I 4

'III >>

p) q I>>>>

I( {ir>>{I )

I I{ J>>

! I PeP- 'I g ~

l'll f,, II ) l Pf.{l

)4 i f{, g,g II

$ I>>y

)

'Ii

)

~ <<

g Pgl g

1

(<< ~ {IV )J'

"{I I 1 <<~

S 4

4

)>>) <<9) tl p

{)>> tl il Il I

, I~

I{, ',',(ki))N l 4r v)ll)I

.I>>N II{ (I

) )f < ~ r<<')

,")"- >>

  • ~Q

{)>>

I' I $ {rI I ~

I

>> )

I<<

', ~

(

~

H>>.) << ')ll il L

' )ll

>>" I.'ll{ e W

>>L>>$ i)"

")t {

)II, l

>>il Q>>)>>)~)

'gl dI4 SI

) 4' l )~7{

)

I<<

)>><<

I{>>ll~ I" Il

{ )>>

)

Nr. G.

C. Sorensen A copy of the Notice of Denial of Application for Amendment to be published in the Federal

~Re ister is enc'losed for your information.

Sincere ly,

Enclosure:

As stated Robert B. Samworth, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Projects cc w/enclosures:

See next page

Hr. G.

C. Sorensen WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Hr. G. C. Sorensen, Manager Regulatory Programs Washington Pub lic Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Hr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Hail Stop PY-ll Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, HD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, HD 1023 Richland, Washington 99352 Hr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, HD 280 Richland, Washington 99352 Hr. C. M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0. Box HD 927M Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Comoissioners

Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuclear Regulatory Commission 0.

Box 69 Richland, Washington 99352 Nicholas S. Reynolds, Esq.

Bishop, Cook, Purcell 5 Reynolds 1400 L Street NW Washington, D.C.

20005-3502