- ,.ACCELERATED NISI'RIBU'EON IIEMONSTR TIOAI SYSIEg REGULATO NFORMATZON DISTRIBUTION.
TEM (RIDE)
ACCESSION NBR:8905180307 DOC.DATE: 89/05/18 NOTARIZED:
NO DOCKET FACLL.50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Undated ltr providing clarifications re proposed ATWS recirculating pump trip design,per 890418 telcon.
I DISTRIBUTION CODE:
A055D COPIES RECEIVED:LTR X ENCL /
SIZE:
TITLE: OR/Licensing Submittal:
Salem ATWS Events GL-83-28 NOTES:
RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS NRR/DEST/ESB 8D NRR/DEST/PSB 8D NRR/DOEA/GCB ll OC/LFMB
~EGM Ol EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
1 6
6 1
1 1
0 1
0 1
0 1
1 1
1 1
RECIPIENT ID CODE/NAME PD5 PD NRR LASHERFD NRR/DEST/ICSB 7
NRR/DLPQ/QAB 10 NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 3
3 1
1 R
I D
S NOXE 'IO ALL "RIDS" RECZPIEÃIS'LEASE HELP US I0 REDUCE HASTE!
CDHIACT IHE DXX3MENI CDNTRDL DESK RXN Pl-37 (EXT. 20079)
KO EIiMBWTE ACR NME FROM DISTRIHFZZOH LIST8 P3R DOCtlMEKS YOU DQNFT NEED<
D S
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL 19
~
~
WASHINGTON PUBLIC POWER SUPPLY SYSTEM F.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Mail Station Pl-137 Washington, D.C.
20555 Gentlemen:
Subject:
Reference:
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 PROVISIONS FOR ATMS RECIRCULATING PUMP TRIP (ADDITIONAL INFORMATION) 1)
- Letter, G02-89-055, GC Sorensen (SS) to
- NRC,
, same subject, dated April 5, 1989 2)
Letter, G02-89-015, GC Sorensen (SS) to NRC "Compliance with ATMS Rule 10CFR 50.62 Relating to RPT System",
dated February 6,
1989 In Reference 1) the Supply System requested that the NRR Staff provide the Supply System with any concerns they might have with the conceptual RPT logic trip design previously submitted (Reference 2).
The Supply System requested the NRR respond no later than April 21, 1989.
On April 18, 1989 a conference call was held between Hulbert Li, Jerry Mauck, and Bob Samworth of the
- NRR, and Larry Aeschliman, Bob Green.
Gordon Brastad and Scott Mulkey of the Supply System.
The purpose of the conference call was to discuss any concerns the Staff had regarding the proposed subject design.
As a result of the above conference call, the Supply System provides the follow-ing clarifications:
0518030 5000 ~7 8e0518 poR 8~>
p,DOCK 0 pgV P
1
Page Two PROVISIONS FOR ATHS RECIRCULATING PUMP TRIP (ADDITIONAL INFORMATION) 1.
The Supply System will install a permanent testing feature that will allow testing, while at power, of the relay logic up to and including the last relay prior to the trip coil.
2.
Indication of testing will be provided to the Control Room Operators.
3.
The Supply System will submit the appropriate Technical Specification change (no-later than March 1, 1990).
It is the Supply System's understanding that the NRR staff has no other specific concerns regarding the WNP-2 RPT proposed design at this time.
The Supply System intends to proceed immediately on that basis.
Very truly yours, G.
C. Sorensen, Manager Regulatory Programs (MD 280)
HLA/bk cc:
JB Martin -
NRC RV NS Reynolds BCP8R RB Samworth NRC DL Williams BPA/399 NRC Site Inspector 901A
Hay 18, 1989 EST,RIBUTION
Mr. G.
C
- Sorensen, Manager Regulatory Programs Washington Public Power Supply System Post Office Box 968 Richland, Washington 99352 WASHINGTON PUBLIC POWER SUPPLY SYSTEM - NUCLEAR PROJECT NO, 2 The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 ity Operating License, dated
+ Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Sigil II*
d C
id i
.d d~f f)3 Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.
, Amendment No.
dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated Annual /Semi-Annual Report-transmitted by letter dated
Enclosures:
As stated Office of Nuclear Reactor Regulation CC:
See next page OFFICE)
SURNAME(
DATE
~ ~ ~
~
~
~ ~
~
~ ~
NRC FORM 3IS IIO/80) NRCM 0240 OFFICIAL RECORD COPY