ML17278A477

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec Changes,Updating Organization Charts
ML17278A477
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/06/1985
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17278A476 List:
References
TAC-59798, NUDOCS 8511130347
Download: ML17278A477 (8)


Text

ATTACHMENT The following changes represent only title changes.

No deletion of support to WNP-2 is represented in these changes:

I Industrial Safety Supervisor to Industrial Safety and Fire Protection Manager

~

Reactor Engineering Supervisor

~

Plant Engineering Supervisor

~

Plant Engineering Supervisor

~

Heal th Physics Chemistry Support Supervisor to to to to Plant Engineering Supervisor (Reactor Systems)

Plant Engineering Supervisor (Control Systems)

Plant Engineering Supervisor (Mechanical Systems)

Health Physics Support Supervisor (see

2. below) 2.

The following changes are additions to the organization chart reflecting additional management support.

No deletion of support to WNP-2 is represented in these changes:

~

Chemistry Support Supervisor

~

Assistant Operations Manager

~

Technical Training Coordinators

~

Plant Engineering Supervisor (Electrical Systems}

Assumes chemistry responsibilities previously assigned to the Health Physics Chemistry Support Supervisor Assists the Operations Manager as necessary.

There is no deletion of responsibility with this change.

Replaces a single Technical Training Coordinator previously reporting to the Plant Manager.

This change allows each principle Manager (Technical, Health Physics/Chemistry, Operations and Maintenance) to closer control the technical training pro-gram for his department.

The prin-ciple Manager can more easily identify the needs of his department and with the department Technical Training Coordinator tailor a program to fill those needs.

Represents a separation of responsi-bilities previously held by one supervisor for both control systems and electrical systems.

8gg g f30347 85< 00397 PDR ADOCK 0 PDR P

I t

I f.~

ATTACHMENT Contd.

3.

The following positions have been moved to or assumed by other management functions within the Supply System.

~

Procurement Manager

~

Planning/Scheduling Formerly reporting to the Maintenance Manager, this posi-tion now reports directly to the

Manager, Operations Contracts and Materials who in turn is responsible to the Assistant Managing Director for Operations in a matrixed posi-tion.

No deletion of responsibility or support to the plant is repre-sented in this change.

Formerly reporting to the Maintenance

Manager, the major responsibilities of this position have been assumed by the Planning

& Scheduling Super-visor reporting directly to the Plant Manager.

The attached organization charts are revised to more clearly show the use of the Technical Training Coordinators.

ii+~~--

0

~ ~

\\ ~ 0

~

~

~

~

1

tecL~Fc

[

Idio;~~

COC PIt).W 4r OPEAATIOIIS WANAGEA (SAO)

AB&IS+OM D~OmII'lvr S

~OI@qBI Q,D,O)

SIBFt 4AIIAGERS

<SAO)

SIBF T 'tfCluuCAL ADVISORS'"'

SECURITY FOACES""'ON tAOL AOOII.4 ~

'UPEAVISOA (SAO) sluFT SUppOA'I SUPERVISOA

'O Bf PROVIDED AS NEEDfo FROll W POOl. OF ECU>rufNT OPERATORS REACTOR OPE RA)GAS (Ro) fOUIPllENT OPERATORS' To BE PAovlDED FRoll WALI-TEIIANCE DEPAATNENT

'" TO Bf PAOVIDED FROID IIPICNELI DEPAATOfNT

'"'O BE PROVIDED FAON TIIE T ECIIIIICALDEPARTIIEIITAS REOUulEO

"'"Sff SECURITY FOR TOTAL SfCUAITY FORCE STAFFBIO LEVEL fouu IIENT OPfRATOAS ICC TECIBICUIIS" I I PIC IIEIIISTRY TECIINICIAIIS"'tAul tfLILUICE ~ ~

SUPPOAT HAC LICENSE AfDUB)ED LEGEND FUNCYIOIIALREPOAINa LBIE OF COIILIUHICATIOH I

POSITION SRO/Ao

~AJ>I 2A FlGURE 6.2.2-1b UNIT ORGANIZATIONOPERATIONS DEPARTMENT

0 I