ATTACHMENT The following changes represent only title changes.
No deletion of support to WNP-2 is represented in these changes:
I Industrial Safety Supervisor to Industrial Safety and Fire Protection Manager
~
Reactor Engineering Supervisor
~
Plant Engineering Supervisor
~
Plant Engineering Supervisor
~
Heal th Physics Chemistry Support Supervisor to to to to Plant Engineering Supervisor (Reactor Systems)
Plant Engineering Supervisor (Control Systems)
Plant Engineering Supervisor (Mechanical Systems)
Health Physics Support Supervisor (see
- 2. below) 2.
The following changes are additions to the organization chart reflecting additional management support.
No deletion of support to WNP-2 is represented in these changes:
~
Chemistry Support Supervisor
~
Assistant Operations Manager
~
Technical Training Coordinators
~
Plant Engineering Supervisor (Electrical Systems}
Assumes chemistry responsibilities previously assigned to the Health Physics Chemistry Support Supervisor Assists the Operations Manager as necessary.
There is no deletion of responsibility with this change.
Replaces a single Technical Training Coordinator previously reporting to the Plant Manager.
This change allows each principle Manager (Technical, Health Physics/Chemistry, Operations and Maintenance) to closer control the technical training pro-gram for his department.
The prin-ciple Manager can more easily identify the needs of his department and with the department Technical Training Coordinator tailor a program to fill those needs.
Represents a separation of responsi-bilities previously held by one supervisor for both control systems and electrical systems.
8gg g f30347 85< 00397 PDR ADOCK 0 PDR P
I t
I f.~
ATTACHMENT Contd.
3.
The following positions have been moved to or assumed by other management functions within the Supply System.
~
Procurement Manager
~
Planning/Scheduling Formerly reporting to the Maintenance Manager, this posi-tion now reports directly to the
- Manager, Operations Contracts and Materials who in turn is responsible to the Assistant Managing Director for Operations in a matrixed posi-tion.
No deletion of responsibility or support to the plant is repre-sented in this change.
Formerly reporting to the Maintenance
- Manager, the major responsibilities of this position have been assumed by the Planning
& Scheduling Super-visor reporting directly to the Plant Manager.
The attached organization charts are revised to more clearly show the use of the Technical Training Coordinators.
ii+~~--
0
~ ~
\\ ~ 0
~
~
~
~
1
tecL~Fc
[
Idio;~~
COC PIt).W 4r OPEAATIOIIS WANAGEA (SAO)
AB&IS+OM D~OmII'lvr S
~OI@qBI Q,D,O)
SIBFt 4AIIAGERS
<SAO)
SIBF T 'tfCluuCAL ADVISORS'"'
SECURITY FOACES""'ON tAOL AOOII.4 ~
'UPEAVISOA (SAO) sluFT SUppOA'I SUPERVISOA
'O Bf PROVIDED AS NEEDfo FROll W POOl. OF ECU>rufNT OPERATORS REACTOR OPE RA)GAS (Ro) fOUIPllENT OPERATORS' To BE PAovlDED FRoll WALI-TEIIANCE DEPAATNENT
'" TO Bf PAOVIDED FROID IIPICNELI DEPAATOfNT
'"'O BE PROVIDED FAON TIIE T ECIIIIICALDEPARTIIEIITAS REOUulEO
"'"Sff SECURITY FOR TOTAL SfCUAITY FORCE STAFFBIO LEVEL fouu IIENT OPfRATOAS ICC TECIBICUIIS" I I PIC IIEIIISTRY TECIINICIAIIS"'tAul tfLILUICE ~ ~
SUPPOAT HAC LICENSE AfDUB)ED LEGEND FUNCYIOIIALREPOAINa LBIE OF COIILIUHICATIOH I
POSITION SRO/Ao
~AJ>I 2A FlGURE 6.2.2-1b UNIT ORGANIZATIONOPERATIONS DEPARTMENT
0 I