CATEGORY j.
REGULAT INFQRt'fATION DISTR IBUTIO YSTEI i (R IDS)
ACCESSION NBR FACIL~50-244 AUTH. NAME MECREDYi R. 4.
REC IP. !'JAME VISSING> G. S.
9703200079 DOC. DATE: 97/03/14 NOTARIZED:
NO Rob crt Emmet Ginna Nuc lear P 1 anti Unit ii Roc h ester G
AUTHOR AFFILIATION Rochester Gas
~~c Electric Corp.
RECIPIENT AFFILIATION DOCKET ¹ 0@000 4O
SUBJECT:
Responds to 970124 RAI re revised submittal oW GA Program
%or Station Operation. Clarilication o+ change on page 19i C
provided.
A DISTRIBUTION CODE:
GOOCD COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
Gh Topical Reporti Changei Amendmenti or Correspondence (Docket/Utili T NOTES: Licens'e Exp date in accordance uiith 10CFR2i 2: 109(9/19/72).
"05000244 E
RECIPIENT ID CODE/NAME VISS INGi G.
INTERNAL:
DRS/R GN. X.
NRR/DISP/P IMB NUDQCS-ABSTRACT RGNi FILE CQP IES LTTR ENCL REC IP IENT ID CODE/NAME NRR OC/LFDCB COPIES LTTR ENCL EXTERNAL:
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK/
ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL phd>
AND ROCHESTER GASANDELECRICCORPORATION ~ 89FASTAYENUE ROCHESTER N.Y 14649-KOI ROBERT C. MECREDY Vice President Nvdeor operations AREA CODE7165d6-2700 March 14, 1997 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, D.C.
20555
Subject:
Reply to a Request For Additional Information Revised Submittal Of Quality Assurance Program R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Vissing:
This letter is in response to your Request For Additional Information, dated January 24, 1997.
The NRC had determined the need for additional information regarding our Revised Submittal of Quality Assurance Program For Station Operation(QAPSO),
dated December 13, 1996. Revision 22 of the QAPSO specifically listed Regulatory Guide 1.33, Rev.
2, Position 5a as a commitment.
Revision 23 of the QAPSO did not list Position 5a of the Regulatory Guide and this appeared to be a reduction in commitment.
The change on Page 19 of our submittal is not a reduction in commitment.
- However, the following explanation should have been included with the changes when submitted.
Regulatory Guide 1.33 This section was rewritten to clarify commitments to various standards and portions of standards.
In particular, this section contained a conflict in which a standard was invoked and then taken exception to later.
The second sentence of the remarks in Rev.
22 states "Ginna Station conforms to Regulatory Positions 1,
3 and Sa in RG 1.33 Rev. 2..."
NOTE: Position Sa invokes Section 4.4 of ANSI N18.7 ANS 3.2-1976.
The last sentence of the remarks in Rev.
22 states "Requirements for the onsite review function meet the 9703200079 970314 PDR ADOCK'05000244 PDR JJJJIJJJIJJJJJIIJI!
JJJIJIJJIIJJJJJJIRI!
JIJJJJ
guidelines of ANSI/ANS 3.2-1988, section 4.3 in lieu of ANSI N18.7-1976 section 4.4..."
This conflict in commitment to ANSI N18.7/ANS 3.2-1976, section 4.4 was removed by rewriting this section.
Ginna is, and has
- been, conforming to ANSI/ANS 3.2-1988, Section 4.3 for review activities of the on-site review committee (PORC),
as approved by NRC correspondence of February 2,1995.
This is consistent with the intent of Position 5a of RG 1.33,,
Rev.
- 2. This is also consistent with Page 8 of our Rev.
22 submittal which states "The PORC. scope of review, organization,
- quorum, and records meet the requirements of ANSI/ANS 3.2-1988, Section 4.3."
Also, the use of ANSI/ANS 3.2-1988, section 4.3 in lieu of ANSI N18.7/ANS 3.2-1976, section 4.4 allows for the use of independent reviewers as described on Page 37 of our Rev.
22 submittal.
Therefore, the change in wording was intended to clarify the commitment and no reduction in commitment was intended or implemented.
Please note also, that there is a typo in our Rev.
23 submittal, in the last sentence of the remarks, in that we incorrectly referred to "ANSI N18.7-1988" which is actually "ANSI/ANS 3.2-1988".
We will correct this error in our Rev.
24 submittal.
Very truly yours, Robert C. Mecre xc:
U. S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14D11)
Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Rd.
King of Prussia, PA 19406 U.S.
NRC Ginna Senior Resident Inspector
Ct k