~p,fl Rtq~
~C
~
<p0 ~~
~r~
av'+>>*e,+'ocket No, 50-244 LS05-80-056 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 December 17, 1980 Nr. John tlaier Vice President Electric and Steam Production Rocnes er Gas and Electric Corporation 89 East Avenue Rochester, New York 14649' ar Hr. Maier:
SUBJECT:
FIRE PPOTECTION - GINNA
/
I J!~
g ll Pg y+e
~l The Commission has issued the enclosed Supplement No.
1 to the February 14, 1979 Fire Protection Safety Evaluation (FPSE) or the Robert E. Ginna Nuclear Power Plant.
The FPSE had identified a number of items as being incomplete, thus requiring in ormation from Rochester Gas and Electric Corporation and review by the NRC staff.
You proviced additional infor-mation in a submittal dated June 19, 1980.
Based on our review of this information we have determined that your proposed modi,ications regarding eleven items are acceptable with regard to fire protection.
These items are 3.1.2 3.1.11 3.1.21 3.1.?4 3.1.25 3.1.39 3.1.48 3.2.2 3.2.5 3.2.5 3.2:7 Our Safety letter.
Water Suppression System Battery Room Ventilation Control Room Separation Piping and Duct Penetrations Construction Joints RC Pump Lube Oil Collection System Hydrogen Piping Cable Separation Electrical Cable Peneirations Backflow Protection Fire Pump Performance Evaluation for these items is attached as 'Enclosure 1 to this Tne requi red completion dates for the modi fications associ ated with the items accepted in this supplement, are specified by paragraph (d) of 10 CFR 50.43 using the date of this supplement as the date of the NRC staff Fire Protection Safety Evaluation Report accepting or requi ring such features.
Sl 03000 7II~
Item 3.2.1, Shutdown Analysis, remains an open item and will be evaluated at a later date.
You had submitted a Safe Shutdown Report dated December 28, 1979.
By letter dated September 18, 1980, we informed you of our conclusion that the modifications required at Ginna to provide alternate shutdown capability are extensive and have not been fully identified and described.
In addition, Enclosure 2 to our letter of November 24, 1980 (which forwarded the new Appendix R to 10 CFR 50 - Fire Protection Program for Operating Nuclear Power Plants) stated that you should install a
dedicated shutdown system meeting the requirements of Section III Paragraph L of Appendix R.
As you are aware, the revised section 10 CFR 50-48 and Appendix R become effective February 17, 1981.
Paragraph 50.48 (c)(5) requires that you submit plans aqd schedules for the installation of the dedicated shutdown system within 80 days of the effective date of the rule (i.e;, by March 19, 1981).
- Further, Paragraph 50.48 (d)(4) will require that the dedicated shutdown system be loath)led wlthln 30 months of NRC approval.
Sincerely, Dennis
.'rutchfield, Chief Operating Reactors Branch ¹5 Division of Licensing
Enclosures:
As stated cc w/enclosui es:
See next page DISTRIBUTION Docket NRC PDR LOCAL PDR ORB Redding DEisenhut RPurpl e TNovak RTedesco GLainas JRoe DCrutchfield HSmi'th DSnaider TWambach NSIC TERA ACRS (16)
WRussell SEP SL VBenaroya GHarrison B Ferguson OELD OI8E (3)
OFFICE)
SURNAME DATE)
ORB ¹5 DL:
B P5
, DY00 5
TlJambach P7iki'<<
DL g5 DC seld
(.. /7.$ 0 NRC FORM 318 (9-76) NRCM 0240 4U.S. GOVERNMENT PRINTING OFFICE: 1979.289 369
f k
I I
f 1
~ i
'I Pr n
~ )
I V
1 I
II 1
t i
t I
l 7
I, Qe
)
December 17, 1980 Item 3.2.1, Shutdown Analysis, remains an open item and will be evaluated at a later date.
You had submitted a Safe Shutdown Report dated December 28, 1979.
By letter dated September 18, 1980, we informed you of our conclusion that the modifications required at Ginna to provide alternate shutdown capability are extensive and have not been fully identified and described.
in addition, Enclosure 2 to our letter of November 24, 1980 (whi ch forwarded the new Appendix R to 10 CFR 50 - Fire Protection Program for Operating Nuclear Power Plants) stated that you should install a
dedicated shutdown system meeting the requirements of Section III Paragraph L of Appendix R.
As you are aware, the revised section 10 CFR 50.48 and Appendix R become effective February 17, 1981.
Paragraph 50.48 (c)(5) requires that you submit plans and schedules for the installation of the dedicated shutdown svstem within 30 days of the effective date of the rule (i.e.,
by triarch 19, 1981).
- Further, Paragraph 50.48 (d)(4) will require that the dedicated shutdown system be installed within 30 months~of NRC approval.
Sincerely, Dennis M. Crutchfi eld hi ef Operating Reactors Branch
$ 5 Divi s ion o f Licens ing....:.-,-.
Enclosures:
As stated cc w/enclosures:
See next page
I
Mr. Leon D. White, Jr.
December 17, 1980 CC Harry H. Voigt, Esquire
- LeBoeuf, Lamb, Leiby and MacRae 1333 New Hampshire Avenue, N.
W.
Suite 1100 Washington, D. C.
20036 Mr. Michael Slade 12 Trailwood Circle Rochester, New York 14618 Rochester Coranittee for Scientific Information Robert E. Lee, Ph.D.
P. 0.
Box 5236 River Campus Station Rochester, New York 14627 Jeffrey Cohen New York State Energy Office Swan Street Building Core 1,
Second Floor Emp ire State P 1 az a
'lbany, New York.,'-12223""
Director, Technical Development Programs State of New York Energy Office Agency Building 2 Emp i re S tate P 1 az a
- Albany, New York 12223 Rochester Public Library 115 South Avenue Rochester, New York 14604 Supervisor of the Town of Ontari o 107 Ridge Road West
- Ontario, New York 14519 Resident Inspector R. E. Ginna Plant c/o U. S.
NRC 1503 Lake Road
- Ontario, New York 14519 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)
U. S. Environmental Protection Agency Washington, D. C.
20460 U. S. Environmental Protection Agency Region II Office ATTN:
E IS COORDINATOR 26 Federal Plaza New York, New York 10007 Herbert Grossman, Esq.,
Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Comnission Washington, D. C.
20555 Dr. Richard F. Cole Atomic S afety and Li cens i ng Board
- " -U;- S. Nuclear Regulatory::Comnission-Washington,. D. C.
20555 Dr.
Emmeth A. Luebke Atomic Safety and Licensing Board U. S. Nuclear Regulatory Comnission Washington, D. C.
20555 Mr. Thomas B. Cochran Natural Resources Defense Council, Inc.
1725 I Street, N.
W.
Suite 600 Washington, D. C.
20006