Provides NRC W/Util Schedule for Reporting Results of Requested Dose Assessment Analysis
ML17229A239
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/21/1997
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-47, NUDOCS 9702280186
Download: ML17229A239 (3)


Text

CATEGORY j.

REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:9702280186 DOC.DATE: 97/02/21 NOTARIZED:

NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

AUTH+AM~ c AUTHOR AFFIL'IATION STALL,J.A.

Florida Power

& Light Co.

RECIP.NAME

'ECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides NRC w/util schedule for reporting results of requested dose assessment analysis.

DISTR1BUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution DOCKET 05000335 NOTES:

RECIPIENT ID CODE/NAME PD2-3 LA WIENSiL.

INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-3 PD FILE CENTE 01 NRR DE EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-S(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL

Florida Power QL!ght Company, 6501 South Ocean Drive. Jensen Beach, FL 34957 h

February 21, 1997 L-97-47 10 CFR 50.4 U.

S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555

, RE:

St. Lucie Unit 1 Docket No. 50-335 Steam Generator Runtime Analysis

'I The purpose of this letter is to provide the NRC with the Florida Power

& Light Company (FPL) schedule for reporting the results of the NRC requested dose assessment analysis.

Your letter dated January 23, 1997, requested FPL to recalculate the dose assessment submitted with the Unit 1 steam generator runtime analysis using the methodology guidance provided in NRC Standard Review Plan (SRP)(NUREG-0800)

Section 15.1.5.

The response was requested within thirty days of the date of your letter (i.e.,

by February 24, 1997).

After evaluating the scope of the requested analysis with our contractors, it was determined that approximately eight man-weeks of contract resources will be required to perform the calculation and provide the results to FPL.

Therefore, additional time is required to accommodate coordination with our contractor (APTECH) and APTECH's subcontractor (SAIC) and to provide for verification of the results.

FPL will respond to your" information request by April 4, 1997. It should be noted that the St. Lucie Unit 1 design and licensing bases predate the SRP methodology and therefore the original analyses were not calculated in accordance with the SRP.

FPL and its contractors have begun calculating the dose assessment portion of our runtime analysis using the methodology requested by the staff.

Please contact us if there are any questions about this submittal.

Very truly yours, J.

A. Stall Vice President St. Lucie Plant JAS/GRM cc: