Text
CATEGORY j.
'/
I' SEGULAT INFORMATION DISTRIBUTIO STEM (RIDS)
ACCESS ON NBR:9603200416 DOC.DATE: 96/03/14 NOTARIZED:
NO FACIE:..",0-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT'T; Notifies NRC that util completed design bases verification of safety-related motor operated valves for Unit 2,during Fall 1995 refueling outage.
DISTRIBUTION CODE:
A064D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Response to Generic Ltr 89-10, "Safety-Related MOV Testing NOTES:
DOCKET 05000389 Surveill T
E RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AC
-ggNZER~
NRR/DRPM/PECB RES/DST EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RAB NRR/DE/EMEB RES/DSIR/EIB/B RES/DST/PRAB NRC PDR COPIES LTTR ENCL D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415"2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL
y 4!
~
P.O. Box 128, Ft. Pierce, FL 34954-0128 March 14, 1996 L-96-60 10 CFR 50.4 U.
S. Nuclear Regulatory'Commission Attn: Document Control Desk Washington, D.
C.
20555 RE:
St. Lucie Unit 2 Docket No. 50-389 The purpose of this letter is to notify the NRC that Florida Power
& Light Company (FPL) has completed the design bases verification of safety-related motor operated valves (MOVs) for St. Lucie Unit 2 during the Fall 1995 refueling outage (SL2-9). This verification includes the committed design and test activities to establish assurance of the existing capability of MOVs to perform their safety-related functions under design basis conditions.
FPL is available to meet with the NRC closing the NRC GL 89-10 program.
completion is available for on site assist the NRC in closing this issue and discuss alternatives for Documentation of program review or for submittal to for St. Lucie Units 1 and 2.
By FPL letter L-95-37 dated February 2,
- 1995, FPL notified the NRC that the NRC GL 89-10 program for St. Lucie Unit 1 was completed during the Fall 1994 refueling outage (SL1-13).
Please contact us if there are any questions about this submittal.
Ver truly yours, W. H.
ohlke Vice President St. Lucie Plant WHB/GRM cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 03200+ih PDR ADQCK 05000389, P
an FPL Group company
/
ll 118
~.