Text

CATEGORY j.

'/

I' SEGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESS ON NBR:9603200416 DOC.DATE: 96/03/14 NOTARIZED:

NO FACIE:..",0-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT'T; Notifies NRC that util completed design bases verification of safety-related motor operated valves for Unit 2,during Fall 1995 refueling outage.

DISTRIBUTION CODE:

A064D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Response to Generic Ltr 89-10, "Safety-Related MOV Testing NOTES:

DOCKET 05000389 Surveill T

E RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AC

-ggNZER~

NRR/DRPM/PECB RES/DST EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RAB NRR/DE/EMEB RES/DSIR/EIB/B RES/DST/PRAB NRC PDR COPIES LTTR ENCL D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415"2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL

y 4!

~

P.O. Box 128, Ft. Pierce, FL 34954-0128 March 14, 1996 L-96-60 10 CFR 50.4 U.

S. Nuclear Regulatory'Commission Attn: Document Control Desk Washington, D.

C.

20555 RE:

St. Lucie Unit 2 Docket No. 50-389 The purpose of this letter is to notify the NRC that Florida Power

& Light Company (FPL) has completed the design bases verification of safety-related motor operated valves (MOVs) for St. Lucie Unit 2 during the Fall 1995 refueling outage (SL2-9). This verification includes the committed design and test activities to establish assurance of the existing capability of MOVs to perform their safety-related functions under design basis conditions.

FPL is available to meet with the NRC closing the NRC GL 89-10 program.

completion is available for on site assist the NRC in closing this issue and discuss alternatives for Documentation of program review or for submittal to for St. Lucie Units 1 and 2.

By FPL letter L-95-37 dated February 2,

1995, FPL notified the NRC that the NRC GL 89-10 program for St. Lucie Unit 1 was completed during the Fall 1994 refueling outage (SL1-13).

Please contact us if there are any questions about this submittal.

Ver truly yours, W. H.

ohlke Vice President St. Lucie Plant WHB/GRM cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 03200+ih PDR ADQCK 05000389, P

PDR