ML17206A845
| ML17206A845 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/23/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17206A843 | List: |
| References | |
| NUDOCS 7906180205 | |
| Download: ML17206A845 (2) | |
See also: IR 05000335/1979007
Text
MATBlPI.>"-':i'""".~iOttppgpf
'~"
ao
'
""'>>oi<UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
c
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
MAR 25 1979
In Reply Refer To:
RII:DRM
50-335/79-07
Florida Power and Light Company
Advanced Systems
and Technology
ATTN:
Dr. R. E. Uhrig, Vice President
P. 0. Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the investigation conducted
by Mr. D. R. McGuire and others of
this office on January
22-26,
1979, of activities authorized
by NRC Operating
License
No. DPR-67 at St. Lucie and to the discussion of our findings with
Mr. C.
M. Wethy on January
26 and 30,
1979.
This also refers to discussions
between Hr. J.
P. O'Reilly of this office and Mr. A. D. Schmidt of your
Corporate Office on February 2,
1979.
Areas
examined during the investigation
and our findings are discussed
in the
enclosed investigation report.
Within these
areas,
the investigation con-
sisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the investigators.
During the investigation, it was found that certain activities under your
license
appear to be in noncompliance with NRC requirements.
These
items and
references
to pertinent requirements
are listed in the Notice of Violation
enclosed
herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's "Rules of Practice"; Part 2, Title 10,
Code of Federal Regulations.
Section
2.201 requires
you to submit to this
office, within 20 days of your receipt of this notice,
a written statement
or
explanation in reply including:
(1) corrective steps
which have been taken
by you and the results
achieved;
(2) corrective steps
which will be taken to
avoid further noncompliance;
and (3) the date
when full compliance will be
achieved.
In addition to the need for corrective action regarding the specific items of
noncompliance,
we are concerned
about the procedural
implementation of your
security program
and management
control systems
that permitted their occur-
rence.
Consequently,
in your reply, you should describe
those actions
taken
or planned to improve the effectiveness
of your security procedures
and
management
control system.
V906180Zc>5
Florida Pover and light
Company
MATERIALTPP ".S"TT"0 I'mR'(ITH
CO'T'I"" 2
""'
'. o"'ETID'3
MAR 25
1979'n
accordance
with Section 2.790(d) of the NRC's "Rules of Practice", Part 2,
Title 10,
Code of Federal Regulations, activities involving details of safe-
guards
and security measures
are exempt from public disclosure;
therefore,
Part II of the investigation report will not be placed in the Public Document
Room. If Appendix A or Part I of the investigative report contains
informa-
tion that you (or your contractor) believe to be proprietary, it is necessary
that you make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must include
a
full statement
of the reasons
on the basis of which it is claimed that the
information is proprietary,
and should be prepared
so that proprietary
information identified in the application is contained in a separate
part of
the document.
If we do not hear from you in this regard vithin the specified
period, Appendix A and Part I of the investigation report will be placed in
the Public Document
Room.
Should you have any questions
concerning this letter,
we vill be glad to
discuss
them vith you.
Sincerely,
e~
ames
P. O'Reilly
'rector
Enclosures:
1.
Appendix A, Notice of Viola
(Not Exempt)
2.
Summary of Investigation Report No. 50-335/79-07
(Not Exempt)
3.
Details of Investigation Report No. 50-335/79-07
(Exempt from Disclosure)
cc v/encl:
Mr. C.
M. Vethy, Plant Manager
St. Lucie Plant
P. 0.
Box 128
Ft. Pierce, Florida
33450
Mr. N. gems
Assistant
gA Manager
P. 0.
Box 128
Ft. Pierce, Florida
33450
YiAT RIftLTRAli~lttTTI 0 Ii).PiDYITH
CDNTAI>>S 2.7CO iiIrQIiliATJDN