ML17166A213

From kanterella
Jump to navigation Jump to search
Notification of Readiness for NRC 95001 Inspection
ML17166A213
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/15/2017
From: Capristo A
South Texas
To: Kennedy K
Document Control Desk, NRC Region 4
References
NOC-AE-17003484
Download: ML17166A213 (2)


Text

South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, Texas 77483 Mr. Kriss M. Kennedy Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 South Texas Project Units 1 and 2 June 15, 2017 NOC-AE-17003484 Docket Nos. STN 50-498, STN 50-499 Notification of Readiness for NRC 95001 Inspection

References:

1.

NRC letter dated January 10, 2017, "South Texas Project Electric Generating Station, Units 1 and 2, NRC Reactive Inspection Report 0500498/2016407, 05000499/2016407, and Preliminary Greater Than Green Finding". (ML17010A211)

2.

NRC letter dated February 9, 2017, "South Texas Project Electric Generating Station Units 1 and 2, Final Significance Determination of a Security-Related Greater Than Green Finding, Notice of Violation, and Assessment Follow-Up Letter, NRC Security Inspection Report 05000498/2017405 and 05000499/2017405. (ML17040A340)

The referenced letters 1 and 2 letters identified a security-related Greater-than-Green finding.

In reference 2, the NRC also advised STP Nuclear Operating Company (STPNOC) that performance of South Texas Project Units 1 and 2, would be in the Regulatory Response Column of the Reactor Oversight Process Action Matrix requiring the NRC to conduct a supplemental inspection in accordance with NRC Inspection Procedure 95001. This letter provides written notification of STPNOC's readiness for the NRC to conduct the supplemental inspection. STPNOC respectfully requests the NRC to conduct the inspection as soon as possible, and no later than the end of the 3rd calendar quarter 2017.

There are no regulatory commitments contained in this letter.

If there are any questions regarding this matter, please contact Robyn Savage at (361) 972-7438 or me at (361) 972-7697.

Aldo Capristo Executive Vice President, Chief Administrative Officer STI: 34503812

cc:

(paper copy)

Attention: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (08H04) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 Mr. Jeremy R. Groom Branch Chief, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 cc: RMS NOC-AE-17003484 Page 2 of 2 (electronic copy)

Morgan, Lewis & Beckius LLP Steve Frantz, Esquire Paul Bessette U.S. Nuclear Regulatory Commission Lisa M. Regner NRG South Texas LP Mark Walker Jim von Suskil Skip Zahn CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Helen Watkins Robert Free