Distribution:
ocument. Control (50-.'323/275)
NRC PDR L PDR NSIC PRC System LB83 File ACRS (16)
OCT 6 1988.
HDenton/ECase DEisenhut/RPurple TNovak JKerrigan Dr. William E. Cooper JLee HSchierling IDVP Project Manager Teledyne Engineering Services 130 Second Avenue Waltham, Massachusetts 02254 WHaass
Dear Dr,
. Cooper:
Region V
On September 10, 1982 R. F. Reedy Inc., the IDVP organization performing the gA audits within the program, conducted an exit meeting on Phase II gA audits with representatives of Pacific Gas and Electric Company (PG&E).
Mr. T.
W. Bishop, a member of the NRC Region V staff, attended the meeting and prepared a summary of the meeting including related comments (memo-randum from R. H. Engelken, Regional Administrator, to H. R. Denton, Director, Office of Nuclear Reactor Regulation, dated September 15, 1982).
Although the NRC has not approved yet the Phase II plan for the IDVP, we believe that the Region V comments on Phase II activities already in
- progress, such as the gA audits, are appropriate.
We therefore are providing you with the above mentioned memorandum for your consideration.
We request that you consider the comments in your evaluation of the Reedy findItngs, particularly with respect to the limited scope of the audit as compared to the scope as specified in the NRR letter of No'vember 19, 1981. It is our understanding that the Reedy report(s) on the gA a'udits will not be issued until mid-October.
We request that you provide a status of the gA audits in your next semi-monthly report.
'taaaai6a PDR ADOCK aaaoa323 i,
A821006 PDR cc:
R. F. Reedy, Inc.
236 N. Santa Cruz Avenue Los Gatos, California 95030 Sincerely, i ~y SigQscl bV g01i Q g'iS0 Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation G. A. Maneatis Pacific Gas 8 Electric Company P. 0.
Box 7442 San Francisco, California 94120
- See previous page for concurrence/initials OFFICE' SURNAME$
DATE $
DL:LB(3
~HSchierl 9(2@.ra.l..
n
'L:LB83
~ ~ 0 ~ 0 ~
~ 1I ~ 0 ~ 00 ~ ~ 0 ~
J Kerrigan
~
~ ~ OO ~ ~ 0 ~ 0 ~ 1 ~00 ~ 0 ~ 1 ~
9/23/82 DL:AD:L
~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~
0 ~
- TNovak
~ ~ ao ~ ~ ~ ~ ~ ~otootll ~ ~
~
9/28/82 DL:D
+D t
9/29/82 NRR:DIR HDent 10
/82
~ ~ ~
~ ~ ~ OI ~
~ 0
~ ~ ~
\\ ~ 0 I
NRC FOAM 318 (10-80) NRCM 02 0 O F FIG IAL R ECOR D COPY USQPO1 1961~@960
Y
Distribution:
Document Control (50-3
/275)
NRC PDR L PDR NSIC PRC System ACRS (16)
TBishop WHaass Region V
LB83 File HDenton/E se DEisenh
/RPurple TNovak JKerr gan HSc ierling J
e Chandler I&E On September 10, 1982 R.
F.
Reedy Inc., the I P organization performing the QA audits within the program, conducted an it meeting on Phase II QA audits with representatives of Pacific Gas and E ctric Company (PG&E).
Mr. T.
W.
- Bishop, a member of the NRC Region V st f, attended. the meeting and I'prepared':
a summary of'he meeting including rel ed comments (memorandum from R.
H. Engelken, Regional Administrat
, to H.
R. Denton, Director, Office of Nuclear Reactor Regulation, dated S ptember 15, 1982).
Dear Dr. Cooper:
Sincerely, Although the NRC has not approve yet the Phase II plan for the IDVP, we believe that our comments on P
se II activities already in progress, such as the QA audits, are appropr ate.
We therefore are providing you with the above mentioned memorandum r your information.
We request that you consider the comments with respect o the requirements as set forth in our letter of November 19, 1981 to PG&
which is the basis for Phase II of the IDVP. It is our understanding t t the Reedy report(s) on the QA audits wi.ll not be issued until mid-Octo er.
We request that you provide a status of the QA audits in your next emi-monthly report.
cc:
R.
F.
- eedy, Inc.
'36
- . Santa-Cruz Avenue Los Gatos, California 95030 Original signed by Qarrell G. Eisenhnt
'Darrell G';=Eisehhut, Director Division of Licensing Office of Nuclear Reactor Regulation
. A, Maneatis R,
F, Fray Paci'fic Gas
& Electric Company P. 0.
Box 7442 San Francisco, California 94120 OFFICES SURNAME/
DATE0 DL:LBg3 Schierlin g~ Ll- /82 DLQBg3 ice'r 9/
82 DL
~
~
~
~ ~I~
~ ~ ~
~ ~
~ oN
~ ~
ot o oIo o I~ o e t 9
/82
~
~ ~
~ ~ ~ ~ ~ ~ 0 ~t ~ ~ ~ ~ ~ ~ ~\\
DL;D
~
~\\ ~ ~ ~
D
~ 0 ~ 0 ~\\ ~ 1 ~ ~
0 ~ 0 ~
~ ~I~ 0 ~ 0 g/
/82 NRR;DIR
~
~ ~ ~
~
~ 0 ~ ~ OO ~ 0 ~ 1 ~I ~
HDenton
~ ~ ~
~ 0 ~ ~ ~ ~ ~ ~ 0 ~ ~ ~I~ 0 ~ ~Ott g/.;
/82 NRG FORM 318 u0-80) NRCM 0240 OFFICIAL RE ORD COPY USGPO: 1991-935-960
0 4
~
I-
~ p 0
IP'
'