March 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016006)
Dear Mr. Fallacara:
On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the PI for Unplanned Scrams per 7,000 Critical Hours (Initiating Events Cornerstone) crossing the White threshold in the third quarter of 2016.
Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/
Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Grand Gulf Nuclear Station to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.
From January 1 to December 31, 2016, the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.
Sincerely,
/RA/
Troy Pruett, Director Division of Reactor Projects Docket No.
50-416 License No.
NPF-29 Enclosure:
Grand Gulf Nuclear Station Inspection Plan
SUNSI Review By: GWarnick/dll ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
NRC-002 OFFICE RIV/C RIV/DRS:D RIV/DRP:D
NAME GWarnick AVegel TPruett SIGNATURE
/RA/
/RA JClark for/
/RA/
DATE 2/27/17 2/23/17 2/27/17
Grand Gulf Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 1 of 3 02/23/2017 11:46:34
EP3
- EP PROGRAM INSPECTION (POSTPONE 2016)
01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing
01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes
01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
RESTART
- ENHANCED BASELINE FOR STAND DOWN RESTART
01/10/2017 03/25/2017 IP 7111104 Equipment Alignment (Quarterly)
01/10/2017 03/25/2017 IP 7111111Q Licensed Operator Requalification Program
01/10/2017 03/25/2017 IP 7111118 Plant Modifications
01/10/2017 03/25/2017 IP 7111119 Post Maintenance Testing
01/10/2017 03/25/2017 IP 7111120 Refueling and Other Outage Activities
01/10/2017 03/25/2017 IP 7111122 Surveillance Testing
- RADIATION SAFETY
02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness
02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
EB2-05T
- TRIENNIAL FIRE PROTECTION INSPECTION
04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]
04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial]
TI191
- MITIGATING STRATEGIES/SFP INST FOR BDBEE
03/06/2017 03/10/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012
- BIENNIAL EP EXERCISE INSPECTION
03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation
03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes
EXAM
- INITIAL EXAM
04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17)
05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17)
- LOADING INSPECTION (ONE WEEK IN MONTH)
06/01/2017 06/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
EXAM
- INITIAL EXAM (2ND ONE)
10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Grand Gulf Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 2 of 3 02/23/2017 11:46:34
- RS TEAM
07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation
07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program
07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
BRQ
- BRQ INSPECTION
07/31/2017 08/04/2017 IP 7111111B Licensed Operator Requalification Program
EB1-21M
- GG DESIGN BASIS INSPECTION
09/11/2017 09/29/2017 IP 7111121M Component Design Bases Inspection (Teams)
TSB 52B
- BIENNIAL PI&R
10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution
11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution
- INSERVICE INSPECTION R21
03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR
RS 12PI
- RAD SAFETY
03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
03/05/2018 03/09/2018 IP 71124.02 Occupational ALARA Planning and Controls
03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness
03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness
EB1-17T
- GG 50.59 CHANGES, TESTS, EXPERIMENTS
10/22/2018 10/26/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
- EP PROGRAM INSPECTION
11/05/2018 11/09/2018 IP 7111402 Alert and Notification System Testing
11/05/2018 11/09/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
11/05/2018 11/09/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes
11/05/2018 11/09/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
11/05/2018 11/09/2018 IP 71151-EP01 Drill/Exercise Performance
11/05/2018 11/09/2018 IP 71151-EP02 ERO Readiness
11/05/2018 11/09/2018 IP 71151-EP03 Alert & Notification System Reliability
- RAD SAFETY
11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation
11/26/2018 11/30/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
11/26/2018 11/30/2018 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Grand Gulf Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 3 of 3 02/23/2017 11:46:34
- RAD SAFETY
11/26/2018 11/30/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.