ML17056B181
| ML17056B181 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/04/1990 |
| From: | Linville J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17056B182 | List: |
| References | |
| NUDOCS 9012180167 | |
| Download: ML17056B181 (6) | |
See also: IR 05000220/1990009
Text
Docket Nos.
50-220
50-410
PIC 04 >)90
Niagara Mohawk Power Corporation
ATTN: Mr. B. Ralph Sylvia
Executive Vice President - Nuclear Operations
301 Plainfield Road
Syracuse, New York 13212
Gentlemen:
Subject:
NRC Region I Combined Inspection Report Nos. 50-220/90-09 and 50-410/90-09
This letter transmits
the results of the routine inspection
conducted
by Messrs.
W. Cook,
R. Laura, R. Temps and others of this office on October 4 through November 14, 1990, at Nine
Mile Point Units
1 and 2, Scriba, New. York.
A summary of the inspection findings was
presented
to member's of your staff at the conclusion of the inspection.
Based upon inspector findings, a Notice of Violation (Appendix A) has been issued identifying
two examples of failure to followstation procedures.
Specifically, maintenance mechanics failed
to use a properly calibrated torque wrench and also failed to adhere to proper radiological control
practices while performing maintenance on hydraulic control units. We are concerned that these
workers exhibited a lack of regard for procedural controls and that problems of this type have
occurred despite your recent efforts to address procedural compliance.
In your response to this
violation, please discuss what further actions you plan to take to improve performance in the
procedural compliance area.
The violation has been categorized as Severity Level IVaccording
to 10 CFR Part 2, Appendix C (Enforcement Policy).
We appreciate your cooperation.
Sincerely,
ORIGlf<AI SIGNED BY;
James C. Linville, Chief
Reactor Projects Branch No.
1
Division of Reactor Projects
OFFICIALRECORD COPY
a: CIR9009.MGD
9012180167
901204
pDR
ADocI( 05oo0220
0
~
i
!.
@pe 0 g +90
Niagara Mohawk Power Corporation
Enclosures:
1.
Appendix A, Notice of Violation
2,
NRC Region'I Combined Inspection Report Nos. 50-220/90-09 and 50-410/90-09
cc w/encls:
J. Firlit, Vice President, Nuclear Generation
K. Dahlberg, Manager, Unit 1
R. Abbott, Manager, Unit 2
C. Terry, Vice President, Nuclear Engineering
J. Perry, Vice President,
Quality Assurance
S. Wilczek, Vice President, Nuclear Support
J. Warden, New York Consumer Protection Branch
M. Wetterhahn, Jr., Esquire
G. Wilson, Senior Attorney
J. Keib, Esquire
Director, Power Division, Department of Public Works, State of New York
State of New York, Department of Law
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
K. Abraham, PAO-RI (2)
OFFICIALRECORD COPY
a: CIR9009.MGD
Niagara Mohawk Power Corporation
3
'0 4 $90
bcc w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encls)
R. Bellamy, DRSS
J. Linville, DRP
D. Vito, DRP
G. Meyer, DRP
M. Miller, DRP
R. Capra, NRR
D. Brinkman, NRR
J. Caldwell, EDO
bcc w/Letter, Notice of Violation and Executive Summary:
T. Martin, RA
W. Kane, DRA
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
L. Bettenhausen,
J. Durr, DRS
M. Knapp, DRSS
RI:DRP
WCook/mj
11/+90
RI:DRP
GMeyer
1lgt/90
mville
~f/90
OFFICIALRECORD COPY
a: CIR9009.MGD
~,