ML17037C548

From kanterella
Jump to navigation Jump to search
Copy of Letter Received by Telecopier Regarding Modification of the Technical Specifications in Accordance with the Commissions Order for Notification Dated August 24, 1973, by Adoption of Change No. 9
ML17037C548
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/27/1973
From: Raymond P
Niagara Mohawk Power Corp
To: Anthony Giambusso
US Atomic Energy Commission (AEC)
References
Download: ML17037C548 (4)


Text

AEC DIS UTION FOR PART 50 DOCKET MATE

'L (TEMPORARY FORM)

CONTROL NO:

FILE:

FR(Rf:

Niagara Mohawk Power Corporation

Syracuse, New York Philip D. Raymond DATE OF DOC DATE REC'D 8-2Z-73 MEMO RPT OTHER Facsimile TO e A. Giambusso ORIG 1

CC OTHER SENT LOCAL'DR X

CLASS UNCLASS PROP INFO INPUT NO C S REC'D DOCKET NO:

50-220 DESCRIPTION:

Facsimile advising Tech Specs have been modifie in accordance with Order of Modification dtd 8-24-73......

ENCLOSURES:

DOXOT aZXOVZ PLANT NAME:

Nine Mile Point Unit 8 1

FOR ACTION/INFORMATION BUTLER(L)

W/

Copies CLARK(L)

W/

Copies GOLLER(L)

W/

Copies KNIEL(L)

W/

Copies SCHWENCER(L)

W/

Copies STOLZ (L)

W/

Copies VASSALLO(L)

W/

Copies SCHEMEL(L)

W/

Copies NIEMANN (L)

W/ 4 Copies DICKER(E)

W/

Copies.

KNIGHTON(E) "

, W/

Copies YOUNGBLOOD(E)

W/.Copies INTERNAL DISTRIBUTION REGAN(E)

W/

Copies W/

Copies W/

Copies W/

Copies REG FILE

OGC, ROOM P-506A MUNTZING/STAFF CASE

~ GIAMBUSSO

~ BOYD MOORE (L) (BWR)

DEYOUNG(L) (PWR)

~KOVHOLT (L)

P, COLLINS REG OPR

~ILE & REGION(3)

MORRIS STEELE TECH REVIEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLICKI SHAO

~TELLO HOUSTON

~OVAK

~OSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLIMER DENTON GRIMES GRMILL KASTNER BALLARD SPANGLER ENVIRO MOILER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST HIGGS (L)

GEARIN (L)

GOULBOURNE (L)

LEE (L)

MAIGRET (L)

SERVICE (L)

SHEPPARD (E)

SMITH (L)

TEETS (L)

WADE (E)

WILLIAMS (E)

WILSON (L)

~AT IND BRAINPAN SALTZMAN PLANS MCDONALD DUBE INFO

~. MILES

~ARGA RUBENS TEIN

~OGC(Engelhardt)

~J.

F. 0;Leery 1 - LOCAL PDR 1 - DTIE(ABERNATHY) 1 - NSIC(BUCPJDAN) 1 " ASLB(YORE/SAYRE/

WOODARD/"H" ST.

16 - CYS ACRS HOLDING EXTERNAL DISTRIBUTION (1) (2X10) NATIONAL LAB~AS 1-R.Schoocmekec,OC,GT,D-323 1-R.

CATLIN, E-256-GT 1-CONSULTANT'S NEWMARK/BLE'K/AGBABIAN 1-GERALD ULRIKSON..ORNL 1-PDR-SAN/LA/NY P 1-GERALD LELLOUCHE BROOKHAVEN NAT. LAB 1-AGMED(WALTER KOESTER BM-C-427-GT 1-RD..MULLERceF-309 GT

f f

u

~

~

~

~

~

~

m r

COPY OF LETTER RECEIVED BY TELECOPIER FROM NIAGARA MOHAWK; ORIGINAL WILL BE SENT IN BY US MAIL.

'Aegulatory Rle Cf-Mr. A. Giambusso Deputy Director for Reactor Projects Directorate of Licensing United States Atomic Energy Commission Washington, D. C.

20545

.0S Nag fggg0g COMagg~pq Bglllltey N4ll Sect lsd 0)

'/fjgp" AUG27 1973~

12

Dear Mr. Giambusso:

Re Nine Mile Point Unit 1 Docket No, 50~220 The Technical'Specifications for Nine Mile Point Unit 1 have been modified in"accordance with'the Commission's Ordex for Modification dated August 24,, 1973, by adoption of Change No.

9 attached to the Order.

The maximum reactor power level that can be attained consistent with" the Order is variable depending primarily on the operating power distribution at any given time, The present, opexating power distribution enables attainment of 1665 thermal megawatts.

Very truly yours, GMR/vk Philip D, Raymond Vice President~Engineering Oq

~pbbs

@PgQ%+

3 qb i53a>

0 k"

U l tl

'Eg 4

l t

('

j I'

I'r 1

t r

k k

W I