ML17037B716
| ML17037B716 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/03/1976 |
| From: | Schneider R Niagara Mohawk Power Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B716 (9) | |
Text
U.S. NUCLEAR REGULATORY IISSION NRC FOAM 395 IW.TO>
1 P
'PI NRC DISTRIBUTION FoA PART 60 DOCKET MATERIAL DOCKET NUMBER 50-220 FILE NUMBER MONTIILY REPORT N
R, C, FROM:
Niagara Mohawk Power Corp.
- Syracuse, New York R. R.'chneider DATE OF DOCUMENT 9 3 76 DATE RECEIVED 9
4 7
@LETTER P4) A I G INAL QCOPY QNOTOR IZED PfVNCLASSIFIED PROP INPUT FOAM NUMBER OF COPIES RECEIVED One signed DES C AIP TI0 N LETTER TRANS THE FOLLOWING:
ENCLOSURE MONTHLY REPORT FOR Au ust/1976 PLANT Ec COMPONENT OPERABILITY 6 AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS 6 OPERATIONS'LANT NAME:
Nine Mile Point 8l (1-P)
(3-P), (KCKgPgg@IIGF>
>P NPT REMPVZ I
fOR ACTION/INFORMATION 9
14 76 RJL CYS FO AC ON INTERNALDISTRIBUTION PD BRANCH CHIEF L Lear 13Dlli 0 we o N
Y.
EXTERNAL OISTR IBUTION
(.ONTROL NUMBLR
~ NAC FOAM IOII ('J 7II)
~ e
~
~
~
~
~
4
Ofhce o$ PLuu 8 Schedules NAmtotcate o( LicenhLng Oersted S~u NucL~ Regulatory ConnLw~on Olabkmgkon, 9.C.
20545 t
I)@'RA MOHAWKPOWER CORPORATIO gaEIIjamIOPI aa~~
,..~I:,....
O'P<
~
/
300 ERIE BOULEVARD, WEST SYRACUSE. N. Y. 13202 Sepkembn 3,
19
,4~
RE:
'Dock& No. 50-220 Ge+CEemen:
Sub~ed hneeith m Ch,e Oping S~
RepoM Jot'he moeth o$ Aught, 1976 Joe Che one (KCe Po~ Nunks~
S~on OnLt'1.
Veep ~y go~,
chnmdn Vice PcuLdmt' ELmtru'.c Pcodu~on TJO/mmmm Enc,.
CERTIFIED MAIL RETURN RECEIPT
IP P
'J
NXNB H E POXNT NUCLEAR STATXOtI NXAG HAM% PO4ER CORPOKXTX03 AVERAGEDAILYUYtlTPOOVE'R LEYEL DOCK.ET NO.
UNIT Sd - 220 D E~
COMPLETED BY TELEPHOiCE T. J. Perkins
~IOyTH Au ust 1976 DAY AVERAGEDAILYPOWER LEVEL
'iXDY~Xi'et) 1 512 DAY AVERAGE DAIK.YPONER LvVER.
(MWe-.Net) 353 17 10 13 60 532 531 529 532 18 20 23 24 25
'S 27 28 30 31 57 377 461 498 503 516 621 523 524 521
/cjw
NE NILE POXN'f NUCLEAR STATXOi~
NXAGAM ~i(0)iAMK POWER COP'590f XON OPERAT)NG DATAREPORT DOCKET NP.
UNIT 50 - 220 DATE Se tember 1
1976 CP(~~)PLETEP gy T. J. Perkins TELEPHONE 315) 343-2110 ext.
1312 OPERATING STATUS REPORTING PERIOD 760801-760831 GROSS HOURS IN REPORTING PERIOD:
744 CIIRRERTLYAD'PRQRIZED PC(VER LEVEL(LP(did MAR. DEP RD. CAPACITY ( IPA'P IPI): 610
- 3. PO'EYER LEVELTOWHICH RESTRICTED (IF ANY) (IfiVlc-Nei):
4I. REASONS FOR RESTRICTION (IF ANY):
5 NUMBER OF HOURS REACTOR WAS CRITICAI
- 6. REACTOR RESERVE SHUTDOWN HOURS
- 7. HOURS GENERATOR OiN LINE
&. UNIT RESERVE SHUTDOWN HOURS THIS b10iUTH 715. 8 K.6 YRTO DATE CUMULATIVE 5 068;8.
"42,906
~ 3 291. 8.
1 138. 1 4 927.2 40 706.3 20.2 20.2
- 9. GROSS THERMALENERGY GENERATED (MWH).....,........~~
8, 158,089 6'4,372,635
- 10. GROSS ELECTRICALENERGY GENERATED (iYIWH).
11 NH ELECTRICAL ENERGY GENERA'TED (iYiWH)
- 12. REACTOR SERVICE FACTOR.
- 13. REACTOR AVAILABILITYFACTOR
~
~
~
348,687 96.2 100 2 649 829 21 142 932 2,567,799 20,485,893 86.6 71.6 96.7 73.5 141. UNITSERVICE FACTOR
- 15. UNITAVAILABILITYFACTOR
- 16. UiNITCAPACITY FACTOR (Using MDC)
- 17. UNITCAPACITY FACTOR (Using Design I(II(Ye)
- 18. UNIT FORCED OUTAGE RATE 93.6 76.8 84.2 85.0 71.9 71.9 13.3 68.0 68.0 56.1 56.1 13.0
- 19. SHUTDOWNS SCH DULED OVER NEXT 6 I'10(XTHS (TYPE, DATE, AND DURATIOiNOF EACPI)s
- 20. IF SHUT DOlYN AT LND OF REPORT PF RIOD, ESTIMATEDDATE OF STARTUP:
/cjw
4 t
NINE MILE POINT NUCLEAR STATION NIAGAIViMOHAWK POHER CORPORATION UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTI.I A >
DOCKET NO.
50 220 HtllT N NH DATE Se tember 1
COMPLETED BY ~
~-
rki THLL HHN '
6
- t. '1312 NO.
DATE 8
8/6/76 TYPE F: FORCED S: SCHEDULED DURATION (HOURS) 22.6 REASON (1)
-A METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POSER (2)
. CORRECTIVE ACTIONSi'COMMENTS Generator trip due to malfunction of field ground test switch.
8/17/76 24.8 While testing turbine stop valves, turbine
'tripped due to faulty limit switches.
/cgw (I)
REASON A: I:.QUIPMEN'fI'AILURE(EXPLAIN)
D: hiAINT.OR TEST C: REI'UELINC D: Rl'.CULATOI<YRESTRICTION I;: OPERATOIC:fRAININGAND LICENSI'. I'.XAhliNA'fION I'l ADhilNlS'I'RATIVL':
OPi',IIATIONALERROR ()EXPLAIN)
Ill O'I'llVR<I XI'LAIN)
(2) hiETHOD 1: MANUAL 2: hiANUALSCRAM.
3: AUTOMATlCSCRAM 4; OTHER (EXPLAIN)
SUI'IMARY:
Turbine output {therefore reactor output) limited due to high lake temperature
{condenser cooling inlet) causing higher than normal turbine back pressure.