January 17, 2017

Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2016501

Dear Mr. Diya:

On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000483/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspection Reports 2016-001, 2016-002, 2016-003, and 2016-004.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 cc: Electronic Distribution CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2016501, DATED JANUARY 17, 2017 DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Acting Resident Inspector (Michael.Stafford@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Project Engineer, DRP/B (Jim.Melfi@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ADAMS ACCESSION NUMBER: ML17017A511 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SEPI:PSB2 BC:PSB2 NAME PElkmann/dch HGepford SIGNATURE /RA/ /RA/ DATE 1/17//17 1/17/17 OFFICIAL RECORD COPY